i CHIEF EDITOR Eng. Ch. Foad Hussain EDITOR Eng. M. Anwar Qaseem Qureshi EDITORIAL BOARD Dr. Muhammad Nawaz Bhutta Dr. Abdul Aleem Chaudhry Hafiz Tehzeeb-ul-Hassan Prof. Dr. Muhammad Taqi Zahid Butt Dr. S.E. Benjamin ADVISORY BOARD Engr. Riaz Ahmad Khan Engr. Ahmad Kamal Mrs. Shahida Saleem PEER REVIEW BOARD Engr. Ch. Ghulam Hussain Engr. Riaz Nazir Tarrar Engr. Syed Mansoob Ali Zaidi Engr. Riaz Ahsan Baig Engr. Zamir Ahmad Soomro PUBLISHED BY Engr. Nayyar Saeed Secretary Pakistan Engineering Congress (4TH FLOOR) PAKISTAN ENGINEERING CONGRESS BUILDING, 97-A/D-1, LIBERTY MARKET, GULBERG-III, LAHORE 54660 (Near Liberty Roundabout) Ph: 042-35784235-8 Fax: 042-35784236 Website: www.pecongress.org.pk Email: info@pecongress.org.pk ISSN : 0013-8061 58th YEAR OF PUBLICATION Engineering News A Quarterly Journal of the Pakistan Engineering Congress Vol. 48 July 2017 to December 2017 No. 3 & 4 EDITORIAL 1 NEWS ❖ Address of Welcome by Engr. Ch. Ghulam Hussain, President Pakistan Engineering Congress on the Lecture “Satellite Technology and Applications”, by Mr. Rahim Sanaullah Choudhry, held on 22nd July 2017 3 ❖ Lecture on the Topic of Satellite Technology and Applications on July 22, 2017 4 ❖ Glimpses of Technical Lecture on the Topic of “Satellite Technology and Applications” held on 22nd July, 2017 5 ❖ Inauguration of Kachhi Canal Project on September 14, 2017 17 ❖ Milestone Achieved: Water Filling in Neelum Jhelum Hydropower Project’s Reservoir Commences 21 ❖ Introductory Remarks by Engr. Ch. Ghulam Hussain, President Pakistan Engineering Congress on Technical Lecture on the Topic of “Discussion of Last 50 Years of DAM Engineering with Speculation of Next Half Century” by Dr. Peter Mason 23 ❖ Technical Lecture on the Topic of “Discussion of Last 50 Years of DAM Engineering with Speculation of Next Half Century” by Dr. Peter Mason 24 ❖ Glimpses of Technical Lecture on the Topic of “Discussion of Last 50 Years of DAM Engineering with Speculation of Next Half Century” by Dr. Peter Mason 25 ❖ Press Clippings 39 ❖ Welcome to New Members 65 ❖ Obituaries – Fatiha for the Departed Souls 67 TECHNICAL PAPERS ❖ Treatment of Waste Water in Lahore By Abdul Qadeer Khan 68 ❖ Environmental Concerns for Sustainable use of Groundwater for Food Security in Punjab By Ghulam Zakir Hassan and Faiz Raza Hassan 78 ❖ Key Recommendations – World Environment Day 2016 on the Topic of “Join the Race to make the World a Better Place” 94 ❖ Impact of Insrastructure Development and Pakistan Economy – Need for Prioritazation By Agha Adeel Afzal 106 ❖ Progress, Risks and Problems in the Development of Small Hydropower in Punjab Pakistan By Engr. Mazhar Hussain Mahu 112 ❖ Technical Lecture on the topic of “Satellite Technology and Applications” by Engr. Raheem Sanaullah Choudhry held on July 22, 2017 – Presentation 133 FOR MEMBERS ONLY Pakistan Engineering Congress is a prestigious professional body established in 1912 dedicated, interalia to technical advancement of Science & Engineering in the country ii PAKISTAN ENGINEERING CONGRESS THE EXECUTIVE COUNCIL FOR THE 74TH SESSION PRESIDENT Engr. Ch. Ghulam Hussain Immediate Past President Engr. Iftkhar Ahmad (President 73rd Session) VICE PRESIDENTS 1 Engr. Husnain Ahmad 6 Engr. Ch. Muhammad Arif 2 Engr. R. K. Anver 7 Engr. Akhtar Abbas Khawaja 3 Engr. Ijaz Ahmad Cheema 8 Engr. Syed Shehzad Raza 4 Engr. Dr. Izhar-ul-Haq 9 Engr. Muhammad Amin 5 Engr. Tariq Rasheed Wattoo Office Bearers 1 Engr. Nayyar Saeed Secretary 2 Engr. Ch. Muhammad Aamir Ali Joint Secretary 3 Engr. Najam Waheed Treasurer 4 Engr. Capt. (R) M. Qadir Khan Publicity Secretary 5 Engr. Amjad Saeed Business Manager Executive Council Members 1 Engr. Riaz Ahmad Khan 17 Engr. Khalid Javed 2 Engr. Syed Abdul Qadir Shah 18 Engr. Najam Waheed 3 Engr. Syed Mansoob Ali Zaidi 19 Engr. Ahmad Nadeem 4 Engr. Iftikhar ul Haq 20 Engr. Anwar Ahmad 5 Engr. Abdul Khaliq Khan 21 Engr. Muhammad Usman 6 Engr. Pervaiz Iftikhar 22 Engr. Brig. (R) Sohail Ahmad Qureshi 7 Engr. Sheikh Muhammad Saeed Tahir 23 Engr. Muhammad Ibrahim Malik 8 Engr. Tahir Anjum Qureshi 24 Engr. Jamil Ahmad Basra 9 Engr. Brig. Farooq Murawat 25 Engr. Mashhadi Hussain Zaidi 10 Engr. Latif Khan 26 Engr. Liaquat Hussain 11 Engr. M. Anwar Qaseem Qureshi 27 Engr. Syed Nafasat Raza 12 Engr. Capt. (R) M. Qadir Khan 28 Engr. Muhammad Sharif Shah 13 Engr. Ali Arshad Hakeem 29 Engr. Atiq ur Rehman 14 Engr. Dr. Muhammad Saeed 30 Engr. Jahangir Larik 15 Engr. Syed Anwar ul Hassan 31 Engr. Faisal Shahzad 16 Engr. Amjad Saeed iii Engr. Ch. Ghulam Hussain President 74th Session iv 1 THE LOOMING WATER ISSUES Dear Fellow Engineers! In a meeting organized by the Pakistan Engineering Council of Research in Water Resources (PCRWR) with United Nations Scientific and Cultural Organization (UNESCO) and Eco Science Foundation (ECOSF). It was stated as an early Warning shot that; 1. “In Pakistan the water quality as well as its quantity is major issues especially in major cities such as Karachi, Quetta, Islamabad and Lahore. 2. Regional Director (U NESCO) stressed the need for a plan for development, devising new policies and regulations for net recharge management for enhancing water productivity by doubling crop yields and halving impact of ground water.” These observations may be viewed in the light of the following ground realities; 1. The country has a registered population of 207.774 million with the highest growth rate of 2.40% cataclysmic scenario coupled with highest urbanization trend in Asia 75.58 million 36.4% that needs enhanced water supply coupled with infrastructure. 2. Per capita water availability has slipped to 908 cubic meters viz -a-viz 5260 cubic meter in 1951. 3. Only 10% of the annual inflows of 142 MAF (170 million Cubic Meters) of water have storage in Dams, canals equivalent of 30 -days water supply as against a 2 -year benchmark. Constantly being reduced due to sedimentation of Tarbela/Mangla Dam 4. Kharif Season Water availability suffers a shortage of 13.12 MAF of water which will affect wheat production (26-Million Ton Target). 5. 29 MAF wa ter continues to flow down Kotri Barrage un -used due to non – construction of reservoirs a continued loss in terms of energy generation bringing additional land for cultivation and for socio-economic progress. 6. 1.5 million Tube wells are churning out ground w ater leading to dangerous sliding in water tables, un -scrupulous water utilization and avoidable wastage all due to non -enactment of Regulations and decades of delay in the formulation of Rules governing the mining of ground water resources. This is resulting in ever increasing over use of groundwater depletion, inadequate recharge and declining water tables. 7. Hill Torrents account for 18 MAF of Water out of which 13 MAF of water can be stored to bring an additional waste land under cultivation that will fur ther augment the food security in the country , mitigation of poverty, employment opportunities and above all safety of infrastructure. The panacea lies in construction of Mega Dams Diamer Basha, Mohmand Dam and above all Kalabagh Dam as well as small Dams wherever possible. 2 Water Storage Projects that need to be completed on war Footings Project Gross Water Storage (MAF) Live Water Storage (MAF) Nai Gaj 0.3 0.16 Kuram Tangi Dam 1.2 0.9 Diamer Basha Dam 8.1 6.5 Mohmand Dam 1.239 0.676 Strict Legal enactments regulating mining of precious Ground water subject of indiscriminate mining and overutilization, metering domestic water supply, especial ly water-tariff for cement manufacturing plants, bottled water, companies, Housing societies etc. Yours sincerely, (Engr. Ch. Foad Hussain) 3 WELCOME ADDRESS BY ENGR. CH. GHULAM HUSSAIN PRESIDENT PAKISTAN ENGINEERING CONGRESS On “SATELLITE TECHNOLOGY AND APPLICATIONS” LECTURE BY MR. Rahim Sanaullah Choudhry ON 22 JULY 2017 Guest Speaker, Mr. Rahim Sanaullah Choudhry, Members of Pakistan Engineering Congress, Distinguished Delegates, Ladies and gentlemen! I welcome you all to participate in today’s Lecture on Satellite Technology and Applications. As you know one of the main objectives of Pakistan Engineer ing Congress is the propagation of the Engineering knowledge among the Engineering Community. The Executive Council of Pakistan Engineering Congress in fulfillment of this major objective arranges different Seminars, Symposia and Lectures on state of the art subjects from time to time. So todays Lecture on “Satellite Technology and Applications” was to be delivered by Mr. Shakeel Zahid who is Member of Space Electrical Engineering but due to some official immediate occupations he could not come so he has se nt his colleague Mr. Rahim Sanaullah Choudhry who I’m sure was very much involved in the preparation of this Lecture. So, Ladies and Gentlemen this Space Technology has one of the most recent and state of the art technology and therefore this will be of i mmense importance and information for all of the participants. Mr. Shakeel Zahid has a very distinguished Educational Professional Career and now Mr. Sanaullah likewise has also more than 21-years of experience in the field of Electronics, Telecommunicatio n and Space Technology. He has made invaluable contributions towards the development and progress of Pakistan’s National Space Programs. In this Lecture, Mr. Sanaullah will present an overview of Satellites including basic major elements of Space Programs, and main segments and core Technologies of Satellite. He will also inform us with the key civilian applications including Communications, Broadcastings, Remote Sensing, Earth Observations, search and Rescue etc. So I will not stand long between you and th e honorable speaker so I will request Mr. Sanaullah to kindly come and present his Lecture. THANK YOU 4 Lecture on the Topic of Satellite Technology and Applications held on July 22, 2017 Pakistan Engineering Congress organized a Lecture on the topic of “Satellite Technology and Applications” on July 22, 2017. The speaker was to be Mr. Shakeel Zahid Member SUPARCO who could not come due to urgent official commitments. In his place the Lecture was delivered by Engr. Raheem Sanaullah Choudhry, Deputy Chief Manager Satellite Operations of SUPARCO with more than 21 -years’ experience. Welcome Address was given by Engr. Ch. Ghulam Hussain, President – PEC. Satellite Technology is comparatively new but it is being usefully employed for a myriad diverse purposes. ➢ Satellites bring Television signals to even most remote rural parts of the country with the result that the people of the rural areas are kept fully informed about the National/International developments in addition to the entertainment element. ➢ Meteorological data about weather help farmers to manage their crops ➢ Communication Network within the Country enables long distance calls from one city to another city of the country. The communication Network can change the face of the rural areas ➢ Satellites through their use in various sectors generate income amounting to billions of rupees ➢ Satellites potential provides projection of floods, earthquakes and various crops yield assessment ➢ These also help in detection of mineral and marine resources and are a must for navigational activities and matters relating to the security and safety of the country It was a very well participated Lecture leading to lively discussion in addition to wide coverage by Electronic/Print Media. At the close of the discussion President (PE C) presented Shield to the Learned Speaker. 5 Glimpses of Technical Lecture On the topic of “SATELLITE TECHNOLOGY AND APPLICATIONS” Saturday, 22nd July, 2017 (From Left) Engr. Rahim Sanaullah Choudhry, the Learned Speaker, Engr. Ch. Ghulam Hussain, President-PEC, Engr. Syed Mansoob Ali Zaidi, Member Executive Council/Former Secretary-PEC Engr. Ch. Ghulam Hussain, President-PEC presenting the Welcome Address 6 Engr. Rahim Sanaullah Choudhry, the Learned Speaker, Presenting his paper on the topic of “Satellite Technology and Applications” (From Right) Engr. Ch. Ghulam Hussain, President-PEC Presenting Congress Shield to the Speaker Engr. Rahim Sanaullah Choudhry 7 Group Photo with Engr. Ch. Ghulam Hussain, President-PEC Questions/Answers Session 8 Questions/Answers Session Khan 9 Questions/Answers Session 10 Glimpses of the Audiences 11 Glimpses of the Audiences 12 Glimpses of the Audiences 13 Glimpses of the Audiences 14 Glimpses of the Audiences 15 Glimpses of the Audiences 16 Glimpses of the Audiences 17 Inauguration of Kachhi Canal Project by the Honorable Prime Minister Shahid Khaqan Abbasi On September 14, 2017 The inauguration of Kachhi Canal Project is a milestone towards national integration. Completion of Kachhi Canal will phenomenally impact the long awaited socio – economic development in Dera Bugti. The Project which was embroiled in a trap for over a decade has been completed in a record t ime of less than a year with the support of Federal Government, untiring efforts of WAPDA’s team and support from local masses. 72,000 acres of barren land in Dera Bugti will trigger a new era of development and National Integration. Taking off from Taunsa Barrage, Kachhi Canal will irrigate 72000 acres of virgin land in Dera Bugti. As many as 914 different structures have also been constructed on the main canal. Distribution of the Project spans over 81 kilometers to divert water from the main canal to the command area of District Dera Bugti. In this connection reproduced below is the message from the Honorable Prime Minister. “It is the matter of immense satisfaction for me that the first phase of Kachhi Canal Project, consisting of the 363 kilometer long main canal, allied structures and distribution system has been completed. With this project a new era of development will begin in the remote areas of Balochistan. I congratulate the ministry of Water Resources, WAPDA and other organizations associated wit h the project for their concerted efforts for its completion. The Government attaches high priority to the prosperity and well -being of the people of Balochistan. The completion of the first phase of Kachhi Canal Project which had remained neglected for d ecades is a clear manifestation of the Federal Government’s commitment and dedication towards the economic prosperity of Balochistan. With the expansion of irrigated agriculture in the province, Kachhi Canal will go a long way towards achieving this goal. In order to meet the Challenges of ever increasing requirements of water for ensuring food security in the country, the Govt. Of Pakistan has not only initiated a number of new projects in Water Sector, but has also made special efforts to complete delayed projects in the shortest possible time. Kachhi Canal is one of these projects. The second phase of this project would also commence soon. The Government of Pakistan will continue to work with the same commitment and earnestness of purpose for the welfare and advancement of the people of Balochistan. 18 KACHHI CANAL PROJECT INTRODUCTION Balochistan is still one of the most backward regions of the country, particularly in the area of irrigated agriculture. Scarcity of water is the main constraint in the development of agriculture. This can be judged from the fact that with a large cultivable land base of 17.42 Million Acres (MA) only about 5.21 MA are cultivated. However, 1.23 MA is canal irrigated area and its major portion lies in the Indus Canal Commands of Pat Feeder and Kirther in Nasirabad District. Kachhi Canal Project will provide irrigation water to presently scantily rain fed area of 713,000 acres in the Kachhi Plain lying along the right bank of Pat Feeder Canal. As per IRSA’s approval, 2.021 MAF wa ter is allocated for Kachhi Canal i.e 1.399 MAF for Kharif and 0.622 for Rabi crops. DESCRIPTION Main components of the project include a new head regulator at existing Taunsa Barrage, a 500 Km main canal to carry a flow of 6,000 cusecs, alongwith its rela ted distribution system consisting of a number of distributaries, minors and watercourses etc. The first 306 Km of the canal falls in the Punjab Province and the remaining 194 Km in Balochistan Province. The Kachhi canal is a contour channel, serving area on its left side only. Its command area lies between Pat Feeder and Kachhi Canal in the Districts of DeraBugti, Naseerabad, Bolan and JhalMagsi. Presently Phase -I of Kachhi Canal Project is being made operational for irrigating 72,000 acres land of District DeraBugti. LOCATION Kachhi Canal off takes from Taunsa Barrage on Indus River and passes through Districts Muzaffargarh, Dera Ghazi Khan, Rajanpur in Punjab and Districts DeraBugti, Naseerabad, Bolan and JhalMagsi in Balochistan. The entire command area lies in Balochistan. MAIN OBJECTIVE The Project aims to accelerate the pace of economic growth in the less developed area of Balochistan Province. BENEFITS • Irrigation supplies of Phase-I for 72,000 acres new fertile area on right side of Pat Feeder Canal. • Employment opportunities. • Increase in the value of land. • Increase in exports and foreign exchange earning. • Reduction in migration from Project to Urban areas. • Increase in revenue to the Government. • Enhanced production of food grain and oilseeds. • Availability of drinking water. 19 • Cropping intensity shall increase from existing 4% to 80%. • Agricultural benefits of Phase-I are estimated to be Rs. 3.94 Billion per year.. SALIENT FEATURES (PHASE-I) • Command Area: 72,000 acres in District DeraBugti. • Total Length of Main Canal (Phase-I) 363 Km (RD 0 to RD 1193) Punjab: 306 Km, Balochistan: 57 Km • Distribution System 81 Km (Balochistan) District DeraBugti. • Canal Capacity: 6,000 Cusecs 20 21 Milestone Achieved Water Filling in Neelum Jhelum Hydropower Project’s Reservoir Commences October 17, 2017: The strategically important 969 MW-Neelum Jhelum Hydropower Project (NJHP) achieved a major milestone, as water filling has been started today in the reservoir subsequent to the substantial completion of the dam. Neelum Jhelum Hydropower Project is being constructed on river Neelum in AJ&K. The project is an engineering marvel with 90 percent o f the project being underground in the high mountain areas. The project consists of four units with installed capacity of 242.25 MW each. The first unit of the project is scheduled to go into operation by end February 2018 followed by the second unit in mid March and third and fourth units in April 2018. On its completion, the project will contribute about five billion units of electricity to the national grid annually. Annual revenue of the project is estimated to be Rs 50 billion. Neelum Jhelum Hydropower Project has entered the final stage with completion of dam structure across the Neelum River at Nauseri. The completion of 160 meter long and 60 meter high dam has enabled impounding of the reservoir that commenced today with regulating closure of spillway gates. Water level will be raised at a rate of one to three meters per day. Total storage of the dam is 8,207 acre feet upto design reservoir operating level of 1015 meter above mean sea level. After successful filling of the reservoir, the water will be diverted into the water way system by the end of 2017. It is worth mentioning that filling of reservoir , which will take about a month, will not affect the water requirements downstream of dam because one of the three gates of the spillway will remain open during the process of reservoir filling. As much as 15 cusecs compensatory water will always be release d downstream of dam to cater for the population needs and sustain aquatic eco system dependant on the Neelum River. For environmental mitigation measures, a huge amount of Rs. 5.56 billion has been allocated in PC I of Neelum Jhelum Hydropower Project inclu ding water supply schemes for Muzaffarabad, Chattar Kalas and Komi Kot area in addition to a number of other such schemes, all to be undertaken by the Government of AJ&K. 22 23 PAKISTAN ENGINEERING CONGRESS TECHNICAL LECTURE OF 28 OCTOBER 2017 BY DR. PETER MASON ON “DISCUSSION OF LAST 50 YEARS OF DAM ENGINEERING WITH SPECULATION OF NEXT HALF CENTURY” Introductory Remarks By the President Engr. Ch. Ghulam Hussain. Dr. Mason, Ladies and Gentlemen It is my proud privilege to welcome you all to this lecture by Dr. Mason, which is of vital importance for our multi-purpose water-storage development. Dr. Mason completed his graduation in Civil Engineering from UK in 1969. He did M.Phil from City Univer sity of London in 1983 on Applied Civil Engineering Hydraulics. He followed it up by completing Phd on the same specialty from the same institution in 1987. Dr. Mason has to his credit over 50 years of rich experience on dam engineering. He started his pro fessional career in 1969 with renowned UK Engineering firm of Sir Alexander Gibb and Partners (Gibb) and served for 28 years. Incidentally, Gibb were engaged as World Bank Consultants for implementation of Indus Basin Project. Later on he joined Montgomery Ward Harza (MWH) and served as Technical Director for 10 years. Presently, he is working with MWH as Technical Director, International Dams and Hydropower. He is a renowned expert on Dams Engineering and currently a member of the Panel of Experts on Neelum-Jhelum Hydropower Project. Over the last half century the dam engineering design has gone through a significant transformation from the conventional to state -of-art. However, considering the structures still being constructed the following dam types are relevant: – i. Fill Dams: – a. Earth fill b. Rock fill c. Concrete faced rock ii. Concrete Dams d. Gravity e. Arch-cum-gravity iii. Roller Compacted Concrete (RCC) I am sure that Dr. Mason will enlighten on the relative merits / demerits of all these types of dams. The current trend in Pakistan is predom inantly leaning towards RCC dams. There must be definite technical merit for the case, but some quarters are suggesting that the fill dams should also be revisited in view of peculiar regional seismo-tectonic setting. Your learned views on this particular aspect will be though provoking. I don’t want to stand any longer between the learned speaker and the audience and request him to start the lecture. Thanking you. Pakistan Paindabad 24 TECHNICAL LECTURE ON THE TOPIC OF “DISCUSSION OF LAST 50 YEARS OF DAM ENGINEERING WITH SPECULATION OF NEXT HALF CENTURY” BY DR. PETER MASON HELD AT 4:00 P.M. ON OCTOBER 28TH 2017 The Learned Speaker took us on a ride/on a journey to the splendid milestones achieved in the domain of “Dam Engineering” with the objective of Maximum exploitation of the water and power potential of the Countries of the world to meet the ever-increasing demand for food, fibre, goods and services, Covering the bygone 50-years. He traced the history of Dams right from pre -Christian era (BC) and after it especially during the bygone 50-years. Dr. Peter Mason, in his Technical Lecture, pointed out the relative merits and demerits of different types of Dams. He said over the last half century the dam engineering design has gone through a significant transformation from the conventional to state of the art one. However, considering the structures still being constructed the dam types are earth fill dams, rock fill dams, concrete dams, arch – cum-gravity and roller compacted concrete (RCC). The current trend in Pakistan is predominantly leaning towards RCC dams. There must be definite technical merit for the case, but some quarters are suggesting that the fill dams should also be revisited in view of peculiar regional seismo-tectonic setting. The event was presided by Engr. Ch. Ghulam Hussain; President -PEC who presented the welcome address. It was participated by leading Water /power resources specialists, members of the Congress as well, a delegation from “Neelum Jhelum Hydro-Power Project” etc. A lively discussion ensued after the lecture. At the end Engr. Ch. Ghulam Hussain President PEC presented Congress shield to Dr. Peter Mason. Refreshments followed. 25 Glimpses of Lecture on the Topic of “Discussion of last 50 years of Dam Engineering with speculation of next Half Century” By: Dr. Peter Mason Saturday, October 28, 2017 (From Left) Engr. Ch. Foad Hussain, Member Board of Management Neelum Jehlum Project / Director NDC Pvt. Ltd. Mr. Romeu Murario, Chief Electrical Engineer Neelum Jehlum Project and Dr. Peter Mason, Chairman Board of Management Neelum Jehlum Project/Director MWH (From Left) Engr. Ch. Foad Hussain, Member Board of Management Neelum Jehlum Project / Director NDC Pvt. Ltd. Mr. Romeu Murario, Chief Electrical Engineer Neelum Jehlum Project and Dr. Peter Mason, Chairman Board of Management Neelum Jehlum Project / Director MWH 26 From left Engr. Dr. Izhar ul Haq Vice President-PEC, Dr. Peter Mason the Learned Speaker From Right Engr. Ch. Ghulam Hussain, President-PEC and the Learned Speaker Dr. Peter Mason 27 From left Engr. Dr. Izhar ul Haq Vice President-PEC and Dr. Peter Mason the Learned Speaker, Engr. Ch. Ghulam Hussain, President-PEC, Engr. Syed Mansoob Ali Zaidi, Member Executive Council/Former Secretary-PEC Engr. Syed Mansoob Ali Zaidi, Member Executive Council/Former Secretary-PEC proceeding with the program of the event 28 Engr. Ch. Ghulam Hussain, President-PEC Presenting the Welcome Address Dr. Peter Mason the Learned Speaker, Presenting his paper on the topic of “Discussion of last 50 years of Dam Engineering with speculation of next Half Century” 29 Dr. Peter Mason the Learned Speaker, Presenting his paper on the topic of “Discussion of last 50 years of Dam Engineering with speculation of next Half Century” Questions/Answers Session Engr. Dr. Izhar ul Haq Vice President-PEC exchanging views on Dam Engineering 30 Engr. Iftikhar ul Haq, Member Executive Council, Managing Director M/s. Engineering General Consultants exchanging views on the issues discussed by the speaker (From Right) Engr. Ch. Ghulam Hussain, President-PEC Presenting Congress Shield to the Speaker Dr. Peter Mason 31 Glimpses of the Audiences (From Left) Engr. Ch. Foad Hussain, Dr. Tahir Hayat, Mr. Tahir Malik and Mr. Amjad Agha Mr. Romeu Murario and others 32 Glimpses of the Audiences 33 Glimpses of the Audiences 34 Glimpses of the Audiences 35 Glimpses of the Audiences 36 Glimpses of the Audiences 37 Glimpses of the Audiences 38 Glimpses of the Audiences 39 “SATELLITE TECH ROLE VITAL FOR SOCIO-ECONOMIC DEVELOPMENT” By Salman Abudhu Lahore: The world’s satellite industry revenues have posted average annual growth of 9-percent while total industry revenues have reached $177.3 billion. This was stated by the speakers during a technical lecture organized by the Pakistan Engineering Congress on “Satellite Technology and Applications”. The key speaker was Shakeel Zahid 1, Member of Pakistan Space and Upper Atmosphere Research Commission (SUPARCO), while introductory remarks were delivered by the Pakistan Engineering Congress President CH. Ghulam Hussain. Zahid said that space technology has huge potential for playing a key role in the socio-economic development and security of any country. De mand for space technology and its numerous applications are growing globally as well as in Pakistan. Over the years, Pakistan’s Space Programme has made significant contribution towards the socio-economic development of the country. The speakers said that all four segments of satellite industry posted growth in last one decade in the world, as satellite services revenues, the largest segment, grew by 6-percent. Regarding the availability of cheap band -width / capacity on -board in Pakistan, they said that Pa k Sat -1 satellite led to even more rapid growth in the demand on satellite capacity / services during 2002 to 2016, mainly due to exponential growth in TV / video broadcasting Industry, rapid increase in Digital Satellite News Gathering (DSNG), substantial growth in internet and government / corporate networks, rapid increase in GSM backhaul connectivity via satellite. The exponential growth in TV / video broadcasting / distribution (through cable) has also led to phenomenal growth in the supporting industr y (advertising, programme production, acting, news reporting, etc). The rapidly growing interest and demand for the bandwidth hungry new services, such as DTCH TV / Video, broadband internet, HD TV and 3D TV, present enormous business opportunities in Paki stan where at the moment no one is offering any of these services. In India, presently there are seven companies providing DTH services to 30 million users, generating yearly revenue of more than 3765 billion Indian rupees. Implementation over the next thr ee decades of the already approved Pakistan / SUPARCO Space Vision 2040 is envisaged to result in a huge increase in space related business in the country. Regarding the socio-economic development effect of space technology the speakers said that through t his technology more efficient and effective management of natural or man -made disasters (floods, earthquakes, wars, etc) can be done, besides reaching out to the masses living in remote or difficult to reach areas and providing them quality education. “We can detect and locate aviators, mariners and land based users distress and to pass on this information to the search and rescue agencies worldwide. Moreover, through this technology c rop health determination, crop yield assessment and fertility analysis ca n be made besides food security through better policy formulation, accurate, reliable and effective land use planning, monitoring and control”, the speakers said. (Courtesy The Nation 23rd July 2017) 1 Dr. Raheem Sanaullah Deputy Chief Manager Spoke on behalf of Mr. Shakeel Zahid. 40 “SPACE TECHNOLOGY ROLE VITAL FOR SOCIO-ECONOMIC DEVELOPMENT” BY Recorded Report Lahore: The world satellite industry revenues has posted average annual growth of 9 percent for the period during 2006 -2013 while total industry revenues reached $177.3 billion in 2011. This was stated by the speakers during a technical lecture organized by the Pakistan Engineering Congress on “Satellite Technology and Applications”. The key speaker was Shakeel Zahid 2, Member of SUPARCO while introductory remarks were delivered by the Pakistan Engineering Congress President Ch. Ghulam Hussain. Shakeel Zahid said that space technology has huge potential for playing a key role in the socio -economic development and security of any country. Demand for space technology and its numerous applications are growing globally as well as in Pakistan. Over the years, Pakistan’s Space Programme has made significant contribution towards the socio-economic development of the country. The speakers said that all four segments of satellite industry in the world posted growth during the last decad e, as satellite services revenues, the largest segment, grew by 6-percent. Regarding the availability of cheap bandwidth/capacity on board in Pakistan they said that Pak Set-I satellite led to even more rapid growth in the demand for satellite capacity services during 2002 to 2016, mainly due to the exponential growth in T.V. /video broadcasting industry rapid increase in Digital Satellite News Gathering (DSNG), substantial growth in Internet and government corporate networks, rapid increase in GSM backhaul connectivity via satellite. The exponential growth in T.V. video broadcasting distribution (through cable) has also led to phenomenal growth in the supporting industry (advertising, program production, acting, news reporting etc). The rapidly growing inte rest and demand for the bandwidth -hungry new services, SUCH as DTH T.V. /Video, Broadband Internet, HD T.V. and 3D T.V., present enormous business opportunities in Pakistan where in the moment no one is offering any of these services. In India, presently there are 7-companies providing DTH services to 30 million users, generating a yearly revenue of more than 376 billion Indian rupees, Implementation over the next three decades of the already approved Pakistan SUPARCO space Vision-2040 is envisaged to resul t in a huge increase in space related business in the country. Regarding the socio -economic development effect of space technology, the speakers said that through this technology more efficient and effective management of natural or man -made disasters (floods, earthquakes, wars, etc) can be done, besides reaching out to the masses living in remote or difficult to reach areas and providing them quality education. We can detect and locate aviators, mariners and 2 Dr. Raheem Sanaullah Deputy Chief Manager Spoke on behalf of Mr. Shakeel Zahid 41 land-based users in distress and to pass on this information to the search and rescue agencies worldwide. Moreover, through this technology crop health determination, crop yield assessment and fertility analysis can be made besides food security through better policy formulation, accurate, reliable and effective land use planning, monitoring and control. In view of national security this technology can be used for communication satellite systems and networks offering quick, reliable and secure means of communication to the government and security forces scattered over large distances, on the ground, in the air and at the sea. (Courtesy Business 25th July 2017) -.-.-.-.- CPEC POWER PROJECT SPONSORS TO PAY $0.15 MILLION EACH IN SECURITY COST BY Salman Siddiqui Karachi: Keeping in view the international and external security threats to the multibillion-dollar China -Pakistan Economic Corridor (CPEC) projects, the government has issued a policy note instructing power project operators to pay protection cost so that they could be ensured sustainable security by special forces. Project sponsors, have been asked to pay $150,000 each in protection cost in the very first year, the cost will continue to increase 3% per annum for the remaining project life. The power secto r regulator has issued the directive despite fierce opposition from the project operators with the argument that it is the duty of the government to ensure sustainable security of the projects. The National Electric Power Regulatory Authority (NEPRA), in a decision, announced on Thursday “independent power producers of China-Pakistan Economic Corridor projects shall pay $150,000 per annum subject to 3% indexation for each year after the first year from the commercial operation date, as required under the security protection clause of the Implementation Agreement (of the projects), directly to the relevant ministry/agency designated for the purpose during the construction period as well as during the operation period”. NEPRA has issued the policy directive in compliance with a summary sent by the Economic Coordination Committee to the regulator late last year. Earlier, the project operators were required to pay the security cost only if they demanded additional protection from the government. The cost varied in line with the scale of the demand, but it would not exceed $150,000 per year and a 3% increase per year. The total security cost to be paid by power project sponsors in the first year comes in at around $2.85 million. Total Cost: NEPRA has notified a tot al of 19 power prqects that will be developed under the CPEC programme. These will have a cumulative capacity of 9,887 megawatts and coupled with a gigantic project for the transmission of 4,000 megawatts of electricity, the total cost stands at $15.56 billion. 42 Accordingly, the total security cost to be paid by the pr oject sponsors in the first year comes in at around $2.85 million. Impact on Consumers A NEPRA official explained that small power projects had not been allowed to pass the security cost on to consumers. Of the 19 operators, 10 are small players. NEPRA on its decision said 10 out of 19 projects have zero financial impact, three projects have a financial impact of less than one paisa per unit and six projects have a financial impact of less than half paisa per unit. Further, this financial impact shal l become lesser and lesser with the annua l indexation of 3% to the amount of $150,000/annum to be contributed by the IPP. “ln future, if the overall security situation improves and government of Pakis tan considers that special security arrangements are no longer needed and the special security force/division is released from this responsibility, no payment shall be made by the power purchaser on account of special security arrangement”. “CPPAG (Central Power Purchasing Agency-Guarantee) shall submit a report every five years regarding the status and implementation of the decision in the matter”, it said. Zonergry, one of the project operators under CPEC, said in its comments to NEPRA that if the governm ent would impose security cost on the operators, then it would remove private security guards from its projects and the government would ensure sustainable security. (Courtesy Express Tribune 10 July 2017) -.-.-.-.- CDA FINDS HIGH LEVELS OF “WASTE CONTAMINATION” IN RAWAL DAM Tests reveal pollutant levels that are higher than global standards By Kashif Abbasi Islamabad: The Capital Development Authority’s (CDA) laboratory has found high concentrations of waste contamination in water samples taken fro m Rawal Lake earlier this week which may offer a clue to the mystery behind the death of a large number of fish in the reservoir. Around 14,000 Silver Cod, known locally as Sunehri, turned up dead over the past week. Following the fish deaths, official mac hinery swung into action and samples from both the water and dead fish were sent for testing to various laboratories across the province. But the report from the CDA’s Waste water Quality Laboratory, available with Dawn, reveals that Biochemical oxygen Dem and (BOD) and Chemical oxygen Demand (COD) level in the water were substantially higher than normal. BOD refers to the amount of dissolved oxygen needed by biological organisms to break down organic material in the water, while COD refers to the amount of oxidisable pollutants in the water. The latter is a good indicator of pollution levels in a water body. According to the CDA lab report, COD levels in deep water were found to be over 43 200 mg/L. while the BOD for that corresponding depth was 70 mg/L. Similar tests conducted on surface water found a COD [Eve] of 163 mg/L, and a BOD level of 54 mg/L. To put this into context, internationally, a CPD level of 200 mg/L, applies to treated industrial efficient, while the BOD levels for treated sewage are around 20 mg/L. The report, which was finalized on Monday, stated “High concentration of COD indicates that there is organic waste discharges/contamination, which is not bio – degradable. It suggested that such an aquatic environment was not tolerable for the fish, w hich was probably why they perished in such large numbers. When “the level of dissolved oxygen decrease (S) in (an) aquatic organism, fishes begin to die”, the report said, adding that he optimum BOD level for fish was around 2.5 mg/L. “Although the dam is under the administrative control of the Punjab government, we tested the water to help authorities establish the reasons for the death of thousands of fish”, CDA spokesperson Mazhar Hussain told Dawn. He said the lab test revealed there was a high COD con centration, which indicated that there was organic waste contamination in the reservoir. ICT Fishers Director Lubna Said told Dawn that the local administration had disposed of around 14,000 dead fish. “I don’t doubt CDA’s lab report, ICT is also working t o discover the reasons behind the fish deaths”, she said, adding that samples had been sent to the Punjab Forensic Science Laboratories in Lahore for this purpose. However, a recent report from the Pakistan Council of Research in Water Resources (PCRWR) had declared the water fit for human consumption, she said. Several residential and commercial structures in Banigala, Malpur and Bhara Kahu are said to be polluting the Rawal Dam’s catchment area. A survey conducted by CDA a couple of months ago revealed th ere were over 2,206 residential and commercial buildings in the Bani Gala and Malpur area, where construction is prohibited. According to CDA documents, there are 1,225 residential houses and 165 commercial buildings in Banigala hilltop and 301 residential and six commercial buildings in Malpur. The Supreme Court is currently hearing the matter of illegal constructions in the Bani Gala areas. “The current management has been making every effort to stop further unplanned construction in Islamabad. What happened in the past is a closed chapter, now all types of unauthorized construction is banned”, CDA Spokesperson Mazhar Hussain claimed. (Courtesy Dawn 19th July 2017) -.-.-.-.- 44 CHANGING UP TIES CHINA ADVISED TO RAMPING UP POWER SECTOR INVESTMENT Nawaz felicitates NEA Chairman on being chosen for Hilal-i-Pakistan award Islamabad: Prime Minister Muhammad Nawaz Sharif on Tuesday said, Chania’s National Energy Administration (NEA) could expand and diversify its investment in the power sector of Pakistan by joining the process of setting up transmission lines and coal fired power projects. In a meeting with NEA Chairman Nur Bekri, Premier Muhammad Nawaz Sharif said both the countries were working for the prosperity of the people of the region through joint economic and development efforts. Acknowledging the support of NEA, the prime minister said that completion of energy projects on fast track basis would help Pakistan in overcoming energy crisis. The Prime Minister said Pakistan was fully committed to the ti mely and effective implementation of alt projects under the China Pakistan Economic Corridor (CPEC). “Pakistan shares Chinese vision of regional and global economic integration through strengthening connectivity partners to the one Belt One Road initiative”, he said. He felicitated the NEA chairman on being chosen for the conferment of Hilal -i- Pakistan award by the President of Pakistan for his meritorious services in the energy sector of Pakistan. The award will be formally bestowed in the investiture ceremony to be held at Aiwan-i-Sadar. The Prime Minister said that completion of Sahiwal Coal based Power Plant in record time would greatly help the government of Pakistan in resolving the problem of power shortages in the country. The NEA chairman said that the administration was rigorously executing energy projects in Pakistan. Appreciating the development vision of the present government in Pakistan, he said NEA was committed to complete the ongoing energy projects in Pakistan within he stipulated time. Chinese Ambassador to Pakistan Sun Weidong was also present during the meeting. Tapping hydel resources Separately, Federal Minister for Water and Power Khawaja Muhammad Asif termed the feasibility studies being conducted by the Chinese side on Indus River ca scade a major leap towards tapping indigenous hydel resources. Asif said it is big achievement which will not only cater the electricity requirements of the country but will also provide lifetime CPEC in the long run. The Federal Minister expressed these v iews during meeting with a high -powered Chinese delegation led by the NEA chairman at the Ministry of Water and Power. Underscoring the importance of tapping hydel potential of Pakistan, the Minister said that Chinese expertise in development of hydel proj ects can be best utilized by developing mega hydel projects on Indus River. Asif said that during last visit of Premier Nawaz the conversion of study into a formal MoU for chalking out ways and means to finance and build these projects was a 45 welcome step. Thanking the Pakistan side for according such a warm welcome to his delegation. Bekri termed the two countries best neighbours, best friends and best brother. The NEA Chairman termed the meeting on Diamer Bhasha Dam successful and expressed hope that the process would continue and both the countries would further share their relevant data to proceed further in the case, APP. (Courtesy Express News 5th July 2017) -.-.-.-.- CONSTRUCTION OF 4,320 MW DASU DAM TO BEGIN SHORTLY By Out Staff Reporter Lahore In a significant development regarding hydel resources in the country, construction work on the 4,320 -megawatt Dasu Hydro-Power Project will commence within a week. As civil works contractor has been mobilized for the purpose. During his visit to the project si te on Wednesday Chairman of the Water and Power Development Authority (WAPDA) retired Lt Gen Syed Muzammil Hussain said: “Commencement of the Dasu Hydro -Power Project’s construction is going to be a good omen for development of hydropower potential in the country, as the mega – scheme is being constructed by leveraging WAPDA’s financial strength. According to a press release issued by the authority, Mr. Hussain visited the site to review progress made regarding infrastructure development and resettlement activities leading to socio-economic uplift of the population. The WAPDA chairman said that of the $4.2 billion required for completion of the first phase of the project, the World Bank’s International Development Association (IDA) was providing a credit of $8 24 million, while the rest of the amount was being arranged by the Authority from various commercial sources. Expressing satisfaction over the financial arrangement for construction of the project, he said that WAPDA ventured into the international financi al market last week to secure $350 million at a very competitive rate as it staggered draw down to suit the project’s financing requirements. The amount was raised with partial guarantee of the World Bank (IDA) and the rest with sovereign guarantee of the government. “The successful financing isa testament to the confidence reposed by the International Financial institutions in the credit worthiness of WAPDA. Apart from this (financing), WAPDA has already arranged local financing for the project worth Rs. 144 billion from a consortium of local banks”, said Mr. Hussain. The 4,320 MW Dasu Hydro -Power Project is being built by WAPDA on the Indus, upstream of Dasu town, in Kohistan district of Khyber Pakhtunkhwa. The project will be completed in two phases -each stage having a power generation capacity of 2,160 MW. (Courtesy Dawn News 6th July 2017) -.-.-.-.- 46 “EFFICIENT” RESOURCE AS ABBASI BECOMES PREMIER, GOVT. MAY PROMOTE RLNG POWER PLANTS These imported gas-based plants will replace inefficient thermal power stations. By Zafar Bhutta Islamabad: As Shahid Khaqan Abbasi becomes prime minister following his stint as petroleum minister, the government may decide to replace all inefficient thermal power stations with efficient re-gasified liquefied natural gas (RLNG) plants, to be set up as independent power Plants (IPPs), in an effort to provide low -cost sustainable electricity, sources say. The premier is pressing for stopping the consumption of furnace oil, diesel and coal in power production and banking only on the use of RLNG. A plan is being framed in the backdrop of consistently high oil import bill of the country as well as expensive electricity generation from oil. At present, 60% of electricity generated in Pakistan comes from thermal power plants, whic h are run on high -speed diesel, furnace oil or natural gas. The government believes that there is a dire need to optimize this resource based on efficiency. Current experiment with three LNG -based power plants -each having production capacity of 1,200 megaw atts with 60% efficiency rate -has demonstrated that RLNG can provide the most cost-effective power generation source for Pakistan. According to sources, a proposal is being reviewed that says inefficient power plants running below 40% efficiency should be set aside and more efficient RLNG -based power projects pf varying capacity can be set -up under the IPP mechanism. They will provide sustainable low- cost electricity for the consumers. At present, eight oil -based power plants are generating 3,383 MW of ele ctricity, but their efficiency rate is less than 40%. They include Muzaffagarh power station, Jamshoro power station, Hubco plant, AES Lalpir, AES Pak Cen, Saba Power and Kohinoor Electric. Apart from these, 14 gas -based power plants are generating 4,138 M W and are functioning at less than 34% efficiency. Of these, only one plant -Kot Addu Power Company (KAPCO)-is operating at 45% efficiency. Eleven oil -based power plants are produce electricity at an efficiency rate that ranges from 42% to 50%. During his stint as Petroleum Minister. Shahid Khaqan Abbasi had presented a plan to former Prime Minister Nawaz Sharif advocating a ban on the use of furnace oil, diesel and coal in power production. He argued that RLNG was the only cheaper source of power generation that would improve plant efficiency and save billions of dollars in oil imports. According to a fuel -efficiency comparison drawn by the petroleum ministry, the cost of consuming RLNG in the Bhikki power plant stood at 97% lower than the cost of furnace oil used in the Muzaffargarh thermal power station. Similarly, the cost of RLNG for the Bhikki plant was 83% less than the cost of high – speed diesel consumed in Saif power plant. Shahid Khaqan Abbasi suggested that 47 Pakistan could save $6-8 billion in four years by running RLNG-fired power plants on the model of Bhikki plant compared to the current furnace oil -based electricity generation. At present, hydroelectric power has a 34% share in the power generation mix, furnace oil contributes 29%, locally produced natural gas 19%, RLNG 8% and renewables and nuclear energy 5% each. In 2018, when power production is expected to go up 33,124 megawatts, the share of hydroelectric power will be 30%, furnace oil 18%, RLNG 16%, local natural gas 12%, imported coal 10%, re newable energy 8%, nuclear power 4% and local coal 2%. (Courtesy Express Tribune 10th July 2017) -.-.-.-.- ELECTRIC CAR BOOM WON’T SPELL “END OF OIL”: IEA CHIEF Istanbul: The use of electric cars is set to grow in the coming years, but this will not spell the end of demand for oil, the head of International Energy Agency (IEA) said on Tuesday. IEA Executive Director Fatih Birol told Agence France Press in an interview that the growth of electric cars was starting from a very small base and oil would still b e needed for ships, planes and trucks. Focus on the game -changing potential of electric cars has increased dramatically in the last weeks. France said it will end sales of petrol and diesel vehicles by 2040 and Volvo Cars plans to start phasing out production of conventional petrol only cars from 2019, with all new models to be electric or hybrid from that date. “Today, many people talk about electric cars-rightly so because electric car sales are increasing. Last year we have seen a record in the sa le of electric cars”, said Birol, whose inter- governmental organization seeks to ensure a reliable energy supply for its member states. But even on these record sales, the number of electric cars today has only reached two million, just 0.2 percent of the global car fleet. “It will grow but it will not bring us the end of the oil era”, he said on the sidelines pf the World Petroleum Congress in Istanbul. “Oil demand will be driven by tricks, it is going to be driven by aviation, by jets, by ships and, very importantly, the petrochemical industry”. “So it is very difficult to substitute oil in these sectors atleast in the short and medium term”, he said. The oil industry has over the last years been buffeted by the low price of crude and also pressure for a reduction of emissions in line with the Paris Agreement on fighting climate change. Meanwhile, interest in renewable energy has surged, raising questions over whether demand for oil will run out even before resources are exhausted, – AFP (Courtesy Dawn News 13th July 2017) -.-.-.-.- 48 FINANCING SUSTAINABLE DEVELOPMENT GOALS (SDGS) By Ignacio Artaza3 The international community adopted Sustainable Development Goals (SDGs) in 2015 as a new global development agenda, encompassing the economic, social and environmental dimensions of sustainable development . For all Meeting the goals require international, national and local commitment, partnerships and innovative thinking. But it also requires money. To achieve the ambitious targets, estimates suggest that $ 5 to 7 trillion per year will be needed globally. Pakistan also requires phenomenal resources given its population and development status, and funds are needed from multiple sources, government, private sector, international development partners and local philanthropy must combine and coordinate to find the funds. Pakistan has already shown strong commitment to the SDGs, adopting them as Pakistan’s National Development Goals. National and sub -national planning and financing frameworks are being aligned to the SDG agenda. New frameworks are being established to track related expenditures, while district -level frameworks are being piloted to highlight priorities, especially those related to health and education. Official Development Assistance was the cornerstone of earlier development agendas. Yet, while developed countries agreed to allocate 0.7 percent of their gross national incomes to developing countries, in reality their contributions reached merely 0.32 percent in 2016. Pakistan is amongst the top 10 ODA recipients globally, but ODA only accounts for 1.3 percent of its GNI. While ODA will remain critical to achieving the SDGs, relying on international aid will not help Pakistan achieve its ambitious objectives. Domesti c resources need to be mobilized more to finance development. This poses a major challenge. Despite recent improvements, Pakistan’s tax -to-GDP ratio is only 12.6 percent, amongst the lowest in South Asia. This narrow tax base, a large untaxed informal sect or, a partially taxed agriculture sector, and preferential treatment continue to hamper revenue mobilization. By addressing these, Pakistan can take the lead in financing its own development. Pakistan has historically maintained high fiscal deficits. Publi c debt servicing stands at 40.4 percent of revenue, constraining its capacity to finance SDG achievement. Thus, the private sector must step -up to meet this national challenge. Through public-private partnerships, the private sector can become a true partn er, complementing government efforts to provide essential infrastructure and public services, without increasing the government’s fiscal burden. With responsible and sustainable business practices, the private sector can contribute to inclusive growth. Cooperation among countries of the global south can help finance development by exchanging low -cost solutions, with mutual benefits for both lender and recipient. Through CPEC, for example, China is investing billions of dollars to address Pakistan’s infrastr uctural bottlenecks whilst promoting its own strategic and economic interests. 3 Country Director, UNDP Pakistan 49 Innovative development financing can help achieve sustainable development. In Bangladesh, microcredit has accounted for a 10 percent (2.5 million people) reduction in rural pove rty over the past two decades. Microfinance there covers 32 million recipients, extending $7.2 billion annually. In contrast, Pakistan has only 3.6 million microfinance borrowers. With a supportive policy environment and strong regulation, microfinance can be expanded to accelerate Pakistan’s progress towards achieving many SDGs. While additional resources are required, there is also a need to improve planning, budgeting and resource allocation, to target long -ignored social sec tors such as education and health, geographical areas and disadvantaged groups. Historically, Pakistan has allocated limited resources towards social sector development expenditures. Preliminary estimates from the federal and provincial budgets 2016 – 2017 reflect improved allocations. Domestic resources must be mobilized. The Planning Commission’s Multidimensional Poverty Index reveals that whilst poverty has declined overall, there are wide disparities between districts. District – level analysis through the M PI provides a tool to influence national and provincial finance commissions to increase allocations to lagging districts. In the past 20 years, outcome-based and participatory budgeting has been used globally to ensure that budgeted funds achieve their int ended results. Such instruments can achieve the transformation in governance that is necessary to achieve the SDGs. The world community has realized the need for holistic efforts to finance and adopt the SDG agenda. The Addis Ababa Action Agenda (2015) pro vides a foundation for implementing this road map, collecting more than 100 concrete measures to support financing for development, including domestic resource mobilization, private investment and improved policy and regulatory framework for effective reso urce utilization. Now is a good time for Pakistan to develop a multipronged financing approach, harnessing the potential that exists in both public and non-public sector. (Courtesy Dawn 20th July 2017) -.-.-.-.- GERMANY’S LONG GOODBY TO COAL DESPITE MERKeL’S GREEN PUSH Frankfurt: Burning coal for power looks set to remain the backbone of Germany’s energy supply for decades yet, an apparent contrast to Chancellor Angela Merkel’s ambitions for Europe’s biggest economy to be a role model in tackling clim ate change. Angela Merkel is avoiding the sensitive subject of phasing out coal, which could hit tens of thousands of jobs, in the campaign for the September 2014 election, in which she hopes to win fourth term. Although well over 20 billion euros are spen t each year to boost Germany’s green energy sector, coal, still accounts for 40 percent of energy generation, down just 10 points from 2000. To avoid disruption in the power and manufacturing sectors, coal imports and mines must keep running, say industry lobbies, despite the switch to fossil-free energy. “(Coal) makes a big contribution to German and European energy supply security and this will remain the case for a long time to come”, the chairman of the coal 50 importers’ lobby VDKI, Wolfgang Cieslik told reporters last week. He also stressed it was crucial for steel manufacturing in Germany, the seventh biggest producer in the world, that use a quarter of the country’s coal imports. Critics point to the irony in Angela Merkel’s tacit support for coal given that she criticized US President Donald Trump for ditching the Pairs climate accord after pledging to voters he would lift environmental rules and revive coal mining jobs. “Angela Merkel has no right to criticize the disastrous climate production policy of US President Donald Trump figures in this country speak for themselves”, said former Green law marker Hans-Josef Fell, referring to overseas Development Institute (ODI) figures showing the extent of public money going to coal. Utilities such as RWE, Unip er and EnBW with coal generation on their books fire back by saying rgeir output is covered by them holding carbon emissions rights certificates, while much of their historic profitability gas been eroded due to competition from renewables. Apart from the environmentalist Greens, who want coal generation to end by 2030, none of the main political parties have set phase-out target dates. Huge vested interests are stifling debate, whether it is potential job losses that alarm powerful unions or the effect on industrial companies relying on a stable power supply. Industry figures show renewables accounted for 29 percent of power output in both 2015 and 2016, up from 7 percent in 2000. But plants burning imported hard coal still make-up 17 percent and brown coa l from domestic mines 23 percent of power output. Cheap coal lets them run a full tilt when necessary while the weather dictates if wind and solar produce anything at all. Cieslik said he expected hard coal alone to retain a share of 15 percent by 2030. VDKI warns that nuclear energy, accounting for 14 percent of power, will remove even more of the round-the-clock supply when it is phased out by 2022-Reuters. (Courtesy Dawn 11th July 2017) -.-.-.-.- IMF TO LAUNCH NEW FORM OF AID – WITH NO MONEY Washington: The International Monetary Fund (IMF) announced on Wednesday it will launch a new tool to support governments in financial trouble – but one that involves no money – formalizing a step it took last week for Greece Instead of providing cheap loans to member countries, the new IMF tool will serve as a good housekeeping seal of approval for a government’s reform program. With that approval in hand governments would be more likely to be able to access other forms of financing from banks and bond markets, the IMF said in a statement. “The new instrument is designed to help countries unlock financing from official and private donors and creditors”, the IMF said. “It enables them to single commitment to reforms and catalyze financing from other sources The IMF last week revived a rarely -used mechanism under which it approved a one-year loan to Greece but withheld the disbursement of funds until the country receives significant debt relief from its euro zone partners. 51 That had a similar effect as the new tool allowin g Greece to return to markets this week to issue three billion Euros ($3.5 billion) worth of five year bonds, and removing a major roadblock in the negotiations with the Euro area. The IMF board this month approved the new non -financing Policy Coordination Instrument (PCI), which unlike traditional fund programs will not have any eligibility criteria, as long as the country is not delinquent in payments to the IMF. Rather than providing loans in exchange for strict adherence to an agreed program of economic and financial reforms -with performance targets reviewed quarterly -the IMF will focus only on to government’s policy package. But the IMF stressed that “policies supported under the instrument would be required to meet the same standard as those required u nder a standard IMF loan”. Fund staff would provide periodic reviews under the PCI, every six months or so, but the schedule would be flexible as would be duration of the program. The IMF has always provided policy advice to member countries on a variety o f topics including design of reforms for tax, pension or labour policies. It also offers a program called a Flexible Credit Line which is similar to the PCI in that it provides an IMF stamp of approval on a country’s economic policies, but also makes available a line of credit that would only be tapped if the country faces dire circumstances beyond its control, like a severe drop in commodity prices or a global financial crisis. Some economists have expressed concern, however, about the potential stigma associated with a country that goes to the IMF for financial assistance. – AFP (Courtesy Dawn 27th July 2017) -.-.-.-.- “OIL KEY TO WORLD ENERGY FOR ENERGY FOR DECADES TO COME” Istanbul: Oil and gas will remain central to the world’s supply of energy for decades to come, the Chief Executive of giant producer Saudi Aramco said on Monday”, urging market players to ensure energy security by bolstering faltering investment. Oil majo r bosses and energy ministers are meeting at the World Petroleum Congress in Istanbul, with the outlook clouded by the low price of crude oil, currently trading at around 45 dollars a barrel compared with a peak of over 145 dollars in 2008. This has driven down investment to record lows, while oil majors are also grappling with the new importance of unconventional sources like shale and renewables. The decision announced last week by Volvo to phase out production of petrol only cars from 2019 in favour of e lectric cars has also sent ripples of concern around the industry. The Chief of Saudi Arabian energy giant, Amin Naseer, said that there is “widespread agreement” that even as the world moves to greater use of renewables over fossil fuels, “petroleum will continue to be the heart of the energy mix”. He said that while “expectations for alternatives are through the roof”, history shows that energy transitions to different sources tend to be “long and complex processes”. The renewables still have major challenges, they do not compete with oil. It takes a long time for new fuels to seize market share”, he said, noting that electric 52 cars would also still need time to take off. With the global economy forecast to grow sharply as populations increase, he said it is a “mistaken assumption that alternatives will be rapidly deployed”. “Rising demand for alt sources of energy with oil and gas at the heart of the mix -will be the reality for decades to come”, he said. But he warned that the tens of billions of dollars l ost in deferred and cancelled investment since the current spate of to o low oil prices began risked harming consumers in the long-run. “Financial investors are shying away from making much needed investment”, Naseer said, warning that without higher invest ment levels” energy transition and energy security may be fatally be compromised”. “New discoveries are also on a major downward trend”, Naseer added, urging industry players to create a “compelling narrative” for increased investment. The downturn has blo wn a major hole in the budgets of key Opec and non -Opec producers, reliant on robust oil prices for healthy finances. Naseer confirmed that to counter the sliding investment trend, Saudi Aramco plans to invest some $300 billion in the coming years and was also looking at diversifying its own business. “The continuing market volatility is a powerful reminder that we must transform our own business model”, he said. Naseer said that by 2030 Saudi Arabia should be “nothing less than a powerhouse”, for solar power and Aramco would play a full part in this. He hailed the fact there have already been “huge advances” in the field of renewables, with costs predicted to fall further for wind and solar energy. – AFP (Courtesy Dawn News 16th July 2017) -.-.-.-.- PAKISTAN’S LARGEST REFINERY TO RESUME PRODUCTION THIS WEEK Byco had remained closed for two years after a fire incident. By Salman Siddiqui Karachi: Pakistan’s largest oil refinery, which had caught fire two years ago shortly after week. of inauguration and had been staying closed since then, is set to resume production later this week. Byco Petroleum Limited, in a notification to the Pakistan Stock Exchange (PSX), said on Monday “the company will resume production at its 120,000 -barrel-per-day refinery”. The refinery would start and supply products to the market by August 5, it said. Byco is a listed company at the PSX. The announcement during an intra -day bull-run helped its share price rise around 3% to Rs. 20.73 with trading in 8.26 million shares. The refinery, located at Hub, Balochistan, had caught fire just three months after its inauguration in 2015. Crude oil heater was said to be the cause of the fire. Byco Secretary Majid Muqtadar said in the notification “new crude charge heater furnace is much better in efficiency and equipped with modern safety and security 53 controls”. “Pre-commissioning and commissioning activities of the plant are in progress and utilities and offsite facilities have already been commissioned”, he said. The refinery has been reconstructed at an estimated cost of around Rs.2 billion, it was learnt. It will produce diesel, furnace oil, motor gasoline, jet fuel JP -1, kerosene oil and light diesel oil. The addition would take oil production by the company to 155,000 barrels per day. “The new refinery is an expansion of the existing facility of 35,000 barrels per day”, Byco Petroleum Vice President Commercial Asad Azhar Siddiqui told The Express Tribune. “Byco would be meeting 40% of the total petroleum product demand that stands at 26 million tons per annum in Pakistan”, he said. Asad Azhar Siddiqui said the company had been supplying petroleum products ro almost all the oil marketing companies, including state -owed Pakistan State oil and private run Shell Pakistan and Hascol. The integrated company also operates an oil marketing company (OMC) with over 260 retail outlets across the country. At present, the OMC stands at the sixth or seventh position in the country. “With the help of the largest refinery’s production, w e may also become the fifth largest oil marketing company in the next 5-6 months”, he said. The firm imports crude oil through the Single Point Mooring (SPM) facility, a floating jetty connected with storage tanks with a 15 km -long pipeline, which allows s hips to take and offload oil without coming to the shore. The facility may help the company to win the market smoothly as ports are getting congested with increased demand, especially for oil due to low prices and smart recovery of the national economy. Pakistan meets 75% of its oil needs through imports of crude and refined products. (Courtesy Tribune 1st August 2017) -.-.-.-.- PAKISTAN SET FOR 2ND HIGHEST GROWTH IN ASIA Revised predictions say GDP growth will be 5.97% over next 10 years Islamabad: Pakistan’s predicted annual growth rate over the next ten years will be nearly six percent, according to revised growth projections presented by researchers at the centre for International Development (CID) at the Harvard University. This represents a one -point g ross domestic product (GDP) increase over CID’s earlier projections which predicted the growth rate to be five percent per year till 2025. If the projections turn out to be correct Pakistan’s GDP growth rate of 5.97% will exceed China’s, which is set to grow by 4.41%. Pakistan’s neighbour India, on the other hand, is predicted to have the fastest growth rate of 7.72% annually. Led by Harvard Kennedy School, the research is titled “The Atlas of Economic Complexity” CID’s growth projection’s incorporate each country’s economic 54 complexities, capturing the diversity and sophistication of their productive capabilities visible in their exports and the ease with which they can diversify by expanding those capabilities. According to the Harvard study the unique econ omic complexities not only describe reasons behind some countries being rich or poor today, but can also predict future growth-about five times more accurately than the World Economic Forum’s Global Competitiveness Index. The CID believes that the economic pole of global growth has moved over the past few years from China to nrighbouring India and is likely to stay there over the coming decade. Except for India, Pakistan will beat all Asian economies in terms of growth including the Muslim majority or in So uth Asian economies on Indonesia (5.82%), Turkey (5.64%), Malaysia (4.80%), Sri Lanka (3.77%), Saudi Arabia (3.17%), Bangladesh (2.82%), and UAE (2.41%), and Shanghai Cooperation organization (SCO) economies of Tajikistan (3.61%), Uzbekistan (3.32%), Kazak hstan (2.69%), Kirgizstan (5.77%) and Russia (2.60%). The main reason underlying income differences between countries is technological advancement. Countries produce limited amounts of goods that many countries can make. The Study notes that economies base d on commodity output race slower growth rates as commodity prices continue to remain under pressure. According to the report, with special economic zones (SEZs) being built under the China Pakistan Economic Corridor (CPEC) project, Pakistan has an opportu nity to move away from commodity output by producing value added goods in joint ventures its exports. A multi -pronged strategy needs to be created to realize the growth potential, the report noted. With high expected FDI inflows Pakistan needs to diversif y its product portfolio and local firms need to introduce some percentage of exports to their strategic plans. Similarly, Pakistan’s agriculture sector needs to address its lack of sophistication and crop and distribution losses. The cumulative effect of e ven modest steps will help increase the GDP growth rate. ANP (Courtesy Express Tribune 5th July 2017) -.-.-.-.- PAKISTAN TO BECOME MAJOR LNG IMPORTER BY 2022 Islamabad: Pakistan says it could become one of the world’s top -five buyers of liquefied natural gas (LNG) with Petroleum Minister Shahid Abbasi predicting imports could jump more than five fold as private firms build new LNG terminal. Outlining Pakistan’s ambitious plans which, if fully implemented could shake up the global LNG market – Mr. Abbasi sa id that imports could top 20 million tonnes by 2022, up from just 4.5 million tonnes currently. Cheaper than fuel oil and cleaner burning than coal, LNG suits emerging economies seeking to bridge electricity shortfalls and support growth on light budgets. “Within five years, I don’t see any reason why we should not be byond 10 million tonnes in annual LNG imports. We will be one of the top five markets in the world”, Mr. Abbasi said. 55 That kind of jump would represent one of the fastest growth stories in the energy industry comparable to what China has done in many commodities but there are doubts whether Pakistan can achieve its ambitions given the complexity and cost of expansion projects. “It’s always possible, but seems very difficult as they will need mu ch more (regasification) capacity and down stream pipelines capacity”, said Trevor Sikorski at Energy Aspects, a London based industry market researcher. “There are infrastructural issues and financial issues”. “Still, it is one of the key LNG growth markets, and its demand will help tighten up the market that has threatened to lurch into over supply”. Mr. Abbasi said no one took Pakistan seriously after a decade of botched attempts to bring LNG to the country, but this has changed with the construction of new LNG terminals and gas plants. He said foreign suppliers are now arriving in Pakistan where energy shortages have prompted Prime Minister Nawaz Sharif to promise he’ll end the country’s frequent blackouts. “Before, we used to go out to talk to LNG suppl iers. Now they’re coming to us”, said Mr. Abbasi. “(LNG) is really what has saved the whole energy system. It has been a huge success in Pakistan and it will continue”, he said after Prime Minister Nawaz Sharif on Friday inaugurated a new Chinese built LNG power plant that uses General Electric turbines. Pakistan built its first LNG terminal in 2015 and, after some delays, a second terminal is due to come online in October, doubling annual import capacity to about 9 million tonnes. A consortium of Exxon Mob ile, Total, Mitsubishi, Qatar Petroleum and Norway’s Hoegh is expected to decide by September whether to build a third LNG terminal for about $700 million, Mr. Abbasi said. Pakistan has dropped plans to finance up to two more terminals, as private companies have said they would finance these themselves and use Pakistan’s existing gas network to sell directly to consumers. “That’s been the real success and that’s where the growth will come from”, Mr. Abbasi said, adding that about 10 million tonnes are linke d to gas connections in Pakistan, a nation of around 200 million, “In the last four years, we would have added two million additional connections. We are really ramping that up”. If Pakistan achieves its ambitious development goals, it could significantly erode market oversupply, which has helped pull down Asian LNG spot prices by more than 70 percent since 2014 to around $ 5 per million British thermal units (minbtu). Mr. Abbasi said Pakistanis in talks with Russia, Indonesia, Malaysia and Oman about government-to-government deals for up to three monthly LNG cargoes for its second terminal, which can import 600 million cubic feet of gas per day, equal to six cargoes a month. “We have a basic idea of what the market is. So if we are able to better those price s through negotiated procurement, we will go with that, otherwise, we might float some more tenders”, Mr. Abbasi said. Tenders for two of the terminal’s six cargoes have already been won by 56 tradinghouse Gunvor and Italy’s Eni, which have signed 5 year and 15 year deals. The contracts are with about $5 billion over their lifetime. Qatar supplies most of the gas for Pakistan’s first LNG terminal – Reuters. (Courtesy Dawn News 11th July 2017) -.-.-.-.- PLANET MARKS NEW HIGHS FOR HEAT, POLLUTANTS AND SEA LEVEL Washington The Earth set a series of dire records in 2016, including hottest year in modern times, highest sea level and most heat trapping gasses ever emitted, a global climate report said on Thursday. A range of key climate and weather indications show the planet is growing increasingly warm, a trend that shows no signs of slowing down. said the annual State of the Climate Report. “Last year’s record heat resulted from the combined influence of long term global warming and a strong EI Nino early in the year’, said the report. “The major indicators of climate change continued to reflect trends consistent with a warming planet”, it added, nothing that several markers -such as land and ocean temperatures, s ea level and greenhouse gas concentrations in the atmosphere – broke records set just one year earlier. The ominous news comes two months after President Donald Trump announced United States would withdraw from the 2015 Paris accord on global warming, a decision that sparked widespread international criticism. In the past billionaire Donald Trump has called climate change “a hoax” invented by the Chinese dismissing scientific evidence of human contributions to rising temperatures. But as humanity continues to rely on fossil fuels for energy unprecedented levels of greenhouse gases are polluting the atmosphere, acting like a blanket to capture heat around the Earth, the report emphasized. All the major greenhouse gases that drive warming, including carbon di oxide (C02), methane and nitrous oxide, rose to new heights, it said. Atmospheric C02 concentration reached 402.9 parts per million (ppm), surpassing 400 ppm for the first time in the modern record and in ice core records dating back as far as 800,000 years. “Climate change is one if the most pressing issues facing humanity and life on Earth”, said the peer reviewed publication, put together by nearly 500 scientists around the globe and released each year by the National oceanic and Atmospheric Administration and the American Meteorological Society. The entire 280 page report is available online. The report confirmed prior announcements that 2016 was the hottest year since contemporary records began, marking the third year in a row that global records were broken planet-wide. Both land and sea surface temperatures set new highs. Melting glaciers and polar ice caps swelled the world’s oceans, and global average sea level rose to a new record high in 2016-about 3.25 inches (82 millimetres) higher than the 1993 average. Global sea level has risen for six straight years, with the highest rates of increase seen in the western Pacific and Indian oceans. 57 In the sensitive polar regions, sea ice in both the Arctic and Antarctic hit record lows. Land temperatures warmed too -average Arctic land surface temperature was 3.6 Fahrenheit (2.0 Celsius) above the 1981 -2010 average. This represents a 6.3 Fahrenheit (3.5 Celsius) increase since records began in 1900. Some extreme weather events increased, such as unusually h igh tropical cyclone activity. A total of named tropical cyclones were observed worldwide in 2016, well above the 1981-2010 average of 82 storms. Record high annual temperatures swept Mexico and India. Over the northern and eastern Indian peninsula, a week long heat wave at the end of April saw temperatures exceed 111 Fahrenheit (44 Celsius), contributed to a water crisis for 330 million people and to 300 fatalities, the report said. Meanwhile, drought was unusually widespread. At least 12 percent of land s urfaces experienced severe drought conditions or worse each month of the year. “Drought in 2016 was among the most extensive in the post 1950 record”, said the report. Northeastern Brazil market its fifth consecutive year of drought, the longest dry spell on record in this region. Meanwhile, the weather phenomenon known as EL Nino, which warms waters around the equator in parts of the Pacific, was strong in the first half of 2016, leading to increasingly wet conditions in some places. Argentina, Paraguay, a nd Uruguay saw repeated heavy flooding, while parts of eartern Europe and central Asia were also wetter than usual. The US state of California had its first wetter than average year since 2012, breaking a drought that lasted several years. – AFP (Courtesy Dawn 11 July 2017) -.-.-.-.- RANN OF KUTCH FAULT LINE POSES EARTHQUAKE RISK TO KARACHI By Faiza Ilyas Karachi: While a serious tsunami threat from the Makran subduction zone looms over the have a devastating impact on Karachi, Badin and the Indian state of Gujarat. Pakistan coast, one must not underestimate the threat from the Rann of Kutch fault which mi ght This information was shared by Zahid Rafi, the Director, earthquake monitoring at the Pakistan Meteorological Department (PMD) in Islamabad, at a seminar-Current status of hazard Preparedness and risk mitigation for potential tsunami along the coast of Pakistan. The event was organized at the NED University of Engineering and Technology in collaboration with the National Institute of oceanography (NIO). Starting off with a welcome address, NED University Vice Chancellor Professor Sarosh H. Lodi said that it was important to discuss the tsunami threat and take protective measures given the fast-paced infrastructural developments taking place in Gwadar. He pointed out that Makran subduction zone, which extended east from the Strait of Hormuz in Iran to n ear Karachi with the length of about 900 kilometres, was the 58 source of the second deadliest tsunami in the Indian ocean in 1945, which claimed lives of hundreds of people only seven decades ago. More than 90 percent of damage to life, property and livelihood happened in the area along Pakistan’s coast, he said. “Imagine the situation if, God forbid, the Karachi port is closed down for a week in case of a disaster like tsunami. At least we should know the kind of risks involved, status of our capacity and how could we collaborate to build -up our knowledge and understand the issue better”, he said. Giving a presentation on a recent PMD study on tsunami risk assessment carried out with the assistance of Cambridge University, Mr. Zahid Rafi said that the Makr an subduction zone was the least documented zone in the world. In this region, the oceanic crust of the Arabian Plate was being subducted beneath the continental crust of the Eurasian Plate. According to Mr. Zahid Rafi, the area of the subduction zone in the least documented zone in Pakistan was more prone to earthquakes (as it had seen a number of such) as compared to the subduction zone falling under the jurisdiction of Iran. “In his memoir Portuguese explorer Vasco da Gama also talks about huge tidal waves causing devastation. While there is evidence if tsunamis affecting Pakistan and oman, there is hardly such evidence on the western side (Iran). “We can expect a big mega -thrust tsunami from the zone locked in Pakistan’s territory. But, we can’t predict its occurrence”, he observed. He also briefed the audience about the techniques and technologies used to measure the depth of the Makran subduction zone, which he said would be around 50 kilometer. To a question, he said that there were less chances o f Karachi being affected by tsunami, though its areas like Hawkesbay and Machhar Colony were vulnerable to the risk. “What worries me more is the Rann of Kutch fault that had seen two major earthquakes in 1819 and 1845. The fact that a lot of time, around 200 years, has passed (since) these events, make their chances of recurrence stronger”, he explained. Seismic data analyst Uzair Azam and physical oceanographer Ibrahim Zia, both representing the NIO, spoke about the role of oceanography in estimating net wave height and extent of inundation in case of tsunami. According to them, seafloor topography and underwater topography in both affect the tsunami’s intensity and dynamics. “Pakistan’s coast faces high wave action. Coastal areas are experiencing high erosion and many low -lying areas get inundated especially in the monsoon season or in case of an unusual event like last year’s super moon during which sea water intruded up to 20 kilometers inside Khubar Creek”, said Mr. Ibrahim Zia. (Courtesy Dawn 25th July 2017) -.-.-.-.- 59 RUSSIA’S GAZPROM AND OGDC OF PAKISTAN SIGN JOINT VENTURE DEAL Agreement meant to facilitate energy sector development By Zafar Bhatti Islamabad: In a major development, Russia and Pakistan’s energy giants entered into a joint venture deal that is expected to attract $3.4 billion in the South Asian country. Russia’s Gazprom International and Pakistan’s oil and Gas Development Company Limited (OGDCL) signed the Memorandum of Understanding in Moscow aimed at mutual cooperation, joint vent ures and use of state of the art technology that would aid exploration and development. Russia has already expressed its interest to invest $8 billion in Pakistan and a major part of it will go in the country’s ailing energy sector. A senior official of t he petroleum ministry said that the Chief Executive officer (CEO) of Gasprom International will arrive in Pakistan on Friday along with his team to discuss possibilities of investment in different projects. Pakistan is already in talks with Russia to inve st $2 billion to build the North -South pipeline that would transport LNG from Karachi to Lahore. Russia had also offered to export gas to Pakistan to meet its domestic needs Moscow is a major supplier of gas to Europe and Turkey and was working to tap Pakistan’s market as well before its tussle with Europe and the United States on Ukraine issue. The deal with OGDCL According to the statement the agreement was signed in Saint Petersburg on July 3,2017. Both companies were represented by their CEOs. Earlier, Russian delegations had visited Pakistan to negotiate and finalize the possible cooperation framework, Gazprom International will explore investment opportunities in Pakistan in coordination with ODGCL. The Russian company has agreed to introduce late st and state of the art technology for production enhancement in OGDCL operated fields in Pakistan. The duo will cooperate in the commercialization of standard or marginal fields which is likely to significantly add to OGDCL’s production and revenues. Par ties have also decided to cooperate in oil and gas infrastructure development and import of hydrocarbons to Pakistan from joint fields. In order to ensure effective implementation of the Mou, parties have agreed to form a Joint Working Group, which will hold its first meeting in mid-August 2017. Gazprom International currently operates in nearly 20 countries in four continents and participates in almost 40 projects of different scales. The key projects are implemented in Algeria, Vietnam, Bolivia, Uzbekis tan, Tajikistan, Kyrgyzstan, Bangladesh and on the North Sea shelf (British, Danish and Dutch sectors). (Courtesy Express Tribune 7th July 2017) -.-.-.-.- 60 SPECIAL ECONOMIC ZONES (SEZS) TO TURN PAKISTAN INTO ENGINE OF GROWTH Iqbal wants comprehensive strategy to lure investments Islamabad: Federal Minister of Planning, Development and Reform Ahsan Iqbal assured that China Pakistan Economic Corridor (CPEC) will not harm domestic industries and interests of the local business community. Addressing a meeting, held to review the development status of Special Economic Zones (SEZ) under CPEC, Iqbal instructed federal and provincial authorities to keep the business community in the loop about latest developments and policies, He also assured of their inclusion in the consultative process for policy formulation to protect indigenous industries. The meeting was attended by the Board of Investment (Bol) Chairman Dr, Miftah Ismail alongwith other Bol members and senior officials of the provincial governments. Chinese investment will augment our industrial capacity through state – of-the-art technology and expertise transfers, which will increase our productivity, he remarked while putting emphasis on formation of joint ventures between local and Chinese manufacturers through increased business collaboration. The Minister updated participants on the status of several energy and infrastructure – related projects, promising increased trade and industrialization in Pakistan once they are completed. Highlighting the importance of SEZs, Iqbal said that the next stage of CPEC encore passes massive production in these zones leading to higher output and exports. “Development of SEZs will play an important role in the future of CPEC by converting Pakistan into a n engine of growth”, he stated while in instructing officials to prepare comprehensive strategy papers to attract investments. He also stressed on the importance of taking advantage of the “window of opportunity” created by unprecedented foreign (Chinese) investments in the country. “A paradigm shift is taking place as the world passes through a fourth industrial revolution where automation and robotics are replacing relatively expensive manual labour”. Pakistan needs to take advantage of its cheaper lab our to overcome the technology gap while maintaining production levels, added the minister. “Provincial governments also need to take concrete steps in order to make SEZs a success”, he said, adding that the country needs a robust industrial base to ensur e sustainable economic development and creation of employment opportunities in view of the ballooning labour force. Representatives from provincial governments and federal territories including K P K (FATA) and Gilgit Baltistan gave detailed briefings on the status of SEZs in their areas during the meeting. (Courtesy Express Tribune 7th July 2017) -.-.-.-.- TENS OF THOUSANDS OF CANADIAN FLEE FOREST FIRES Montreal: Almost 40,000 Canadians have fled their homes under threat of huge wild fires, with British C olumbia facing its largest emergency evacuation ever, officials said on Monday. 61 Canada scrambled thousands of firefighters and hundreds of aircraft from across the country to tackle raging infernos in the western province, and had even drafted extra firefighters from Australia, Public Safety Minister Ralph Goo dale said. He said 39,000 people had been forced from their homes so far, noting that the emergency measures constituted “the largest evacuation in the history of British Columbia”, the worst hit region in the country. “I would note that we’re expecting at least 50 forest fire fighters to be coming in from Australia over the course of the next couple of days. And if there are additional resources needed from other parts of the world, we will access those as well”, he said. Southern and central British Columbia have been hit by scorching weather that has left the forested province on high alert for the past 10 days. Authorities had hoped to have the fires under control late last week, but they returned with a vengeance over the weekend, fanned by strong winds and increasing in number as lightning strikes sparked new blazes. Wild fires were also devastating forests in California where a lightning storm on Sunday near Yosemite National Park started a blaze dubbed the “Detwiller Fire” which razed 7,100 acres, according to Cal Fire. Around 50 alerts were issued in towns and villages in British Columbia, forcing residents to flee their homes with no guarantee they can return any time soon. On Saturday, the 11,000 residents of Williams Lake were forced to abandon their homes and spend hours stuck in traffic Jamms on the only evacuation route still open from their town, surrounded by flames in the middle of the night. A dozen towns set -up emergency centres to accommodate those fleeing the fires, providing camp beds and food. But towns such as Kamloops and Prince George were starting to be overwhelmed by the sheer number of people arriving every day. Around 3,000 firefi ghters from all over Canada, together with 200 helicopters and fire-fighting planes, were battling more than 150 blazes in British Columbia, several of which were raging out of control, A fire -fighting helicopter crashed in the region on Saturday, and its pilot-who was alone on board-was being treated in a hospital. Since Apri l 1,657 fires have destroyed some 730 square miles of forest in the province. Some of the worst fires, such as the blaze near the town of Asheroft, cover tens of thousands of Fires a re also threatening areas further rest in the Rocky Mountains, home to some of the country’s most important national parks like the nature reserve in Banff. A part of that park -which receives almost four million tourists each year -was closed on Monday as a new fire menaced the surrounding area. The Parks Canada authority also closed parts of the neighbouring Kootenay National Park. The fires come at the height of tourist season and just as Canada is expecting a flood of visitors to celebrate its 150ih anniversary, when it will grant free access to its national parks. – AFP (Courtesy Dawn 19th July 2017) -.-.-.-.- 62 THE HIGH COST OF UNRELIABLE POWER By Benjamin Zycher The climate obsessions of the Obama administration yielded a substantial myopia with respect to the other central goals of energy policy, the cost and reliability of the electric power system in particular. One obvious result of that single -minded focus was a concerted effort to ignore several unavoidable trade -offs, as the PUSH proceeded for expansion of wind and solar (“renewable”) electricity generation, rationalized as “cleaner” than such conventional generation as coal and natural gas. More about tha t purported cleanliness below. For now, we should recognize the importance of a new draft study from the Department of Energy, which examines the effect of increasing reliance upon wind and solar power on the reliability of the nation’s power system. Shunt ed aside by the Obama administration, this topic is crucial because of the intermittent nature of wind and sunlight -unlike the energy from coal, natural gas or nuclear fuel. These are available upon demand and thus can be scheduled (“dispatched”), while wi nd and solar power are available only when they are available, and thus require substantial backup generation capacity in order to avoid power outages. Such backup power is very expensive -my own estimate of those backup costs is $368 per megawatt hour -and there is an unavoidable trade -off between those extra costs and the massive costs of potential blackouts. The Energy Department’s two central preliminary findings can be summarized as follows: • Many retirements of large, reliable base load plants over the past 15 years have been driven by competition from inexpensive natural gas, from a slowing of demand growth for electric power, and from the anticipated costs of increasingly stringent environmental regulations. • But since 2007 the growth of wind and solar power, driven heavily by large federal, state and local subsidies and by guaranteed market shares (“renewable portfolio standards”), has exacerbated the problem of large base load plant retirements. In short: The subsides and guaranteed market shares for renewables have distorted the market. Large, efficient base load plants fired by clean coal and nuclear technologies are difficult or impossible to ramp up and down as wind or sunlight conditions decline or rise. As a result, the “capacity factors” the proportion of the time that they are producing power -of the base load plants fall, the effect of which is to increase average production costs. The outcome described in the Energy Department study is straight -forward: The plants cannot operate efficiently, t heir owners cannot cover their costs, and their early retirements are reducing the reliability of the electric power system, an effect that is both costly and unavailable and dangerous in terms of the potential for blackouts. Notwithstanding ubiquitous as sertions to the contrary, wind and solar power are expensive and unreliable. They are expensive because the energy content of wind and sunlight is un -concentrated, that is why they are dependent upon massive subsidies and guaranteed market shares, when tho se are threatened with policy reforms, investment in those sectors collapses to zero. Moreover, the production 63 subsides for renewables -the production tax credit for wind power in particular -allow the wind power producers to underprice their electricity wit hout incurring financial losses. Coal and nuclear base load plants, which cannot ramp up and down easily or at all, must match those artificially low prices, which under some conditions actually are negative. The longer -term effect of this large distortion is less investment un – reliable base load capacity, and thus a power system that it is less reliable. Moreover, there is nothing “Clean” about renewables. There is the heavy metal pollution created by the production process for wind turbines. There are the noise and flicker effects. There is the large problem of solar panel waste. There is the wildlife destruction caused by the production of renewable power. There is the land use both massive and unsightly, made necessary by the un -concentrated nature of renewable energy. And above all: there is the increase – yes, increase – in the emissions of conventional effluents caused by the up -and-down cycling of the conventional backup generation units needed to avoid blackouts caused by the unreliability of wind and solar energy. The Energy Department reliability study is because it exposes the central problem with wind and solar subsides swept for so long under the rug. Such policy support is forcing the shutdown of large number of reliable base load power plants producing inexpensive conventional electricity, in favour of unreliable wind farms and solar power facilities, a growing distortion mandated in pursuit of a climate agenda even though the net effect on global temperatures of the assumed reduction on greenhouse gas emissions would be effectively unmeasurable by the year 2100. Can this possibly make sense? (Courtesy The Washington Times 14th July 2017) -.-.-.-.- EARLY WARNING WATER CRISIS MAY SOON HIT MAJOR PAKISTAN CITIES Experts stress the need for an effective groundwater management By Sehrish Wasif Islamabad: Rapid depletion of ground water may soon create worsening water crisis in Pakistan’s major crisis, causing a drought -like situation, said chief of the Pakistan Council of Research in Water Resour ces (PCRWR) Muhammad Ashraf on Thursday. Stressing the need for target steps to avert such as crisis, he said:”Such measures need to be taken on a war footing otherwise, a large section of Pakistan’s population, especially those living in Karachi, Quetta, Lahore and Islamabad, will face severe water shortages”, Muhammad Ashraf told The Express Tribune after the concluding session of a sub-regional meeting of experts on ground water management here. The meeting was organized by PCRWR in collaboration with t he United Nations Educational, Scientific and Cultural organization (UNESCO) and ECO Science Foundation (ECOSF) to discuss the alarming water situation not only in Pakistan but elsewhere in the region and its potential impacts. “Water management is a trans – disciplinary issue and can be solved by involving all stakeholders and also by educating the end users. Secretary of the Ministry of Science and Technology, Fazal Abbas Maken. 64 The meeting focused on the UNESCO Tehran Cluster, mainly covering Afghanistan , Iran, Pakistan and Turkmenistan. Experts attending the meeting will try to outline strategies for sustainable ground water management in the region, particularly in Pakistan. “In Pakistan, the water quality as well as its quantity are major issues, esp ecially in major cities such as Karachi, Quetta, Lahore and even in Islamabad”, said Muhammad Ashraf, adding that rapid population growth, urbanization, deforestation and lack of awareness about the importance of water are major causes for the emergence of this crisis. Experts expressed concern over the alarming water situation in the region and agreed that if even if a single town in any of these countries was facing an acute water shortage, it was a major threat to the entire region. Dr. Shahbaz Khan, th e Regional Director of UNESCO’s Jakarta office, stressed the need for a plan for development, devising new policies and regulations for net recharge management, for enhancing water productivity by doubling crop yields and halving input of ground water, making Pakistan a regional agricultural power. Vibeke Jensen, the Director of UNESCO Islamabad, said that an effective ground water management in the regional context was crucial for Agenda 2030. Fazal Abbas Maken, Secretary of the Ministry of Science and T echnology, said that availability, accessibility and affordability of clean water on sustainable basis were essential for the region. “Water Management is a trans -disciplinary issue and can be solved and also by educating the end users”, he added. (Courtesy Tribune 4th July 2017) -.-.-.-.- 65 WELCOME TO NEW MEMBERS The Executive Council of the Pakistan Engineering Congress 74th Session approved Membership of the following new members into the Congress fold. The Engineering News congratulates all of them and welcomes them to Pakistan Engineering Congress Members admitted on 74/5th Meeting of Executive Council held on 29th July 2017 1 Engr. Malik Muhammad Rizwan 30 Engr. Maham Aziz 2 Engr. Muhammad Dawood ul Hassan 31 Engr. Khuzaima Aslam Khan 3 Engr. Hamza Nazir Malik 32 Engr. Mubashar Hussain Arshad 4 Engr. Muhammad Islam 33 Engr. Khalid Mahmood Bhatti 5 Engr. Muhammad Qaba Qusain 34 Engr. Muhammad Ashiq 6 Engr. Zeeshan Ali 35 Engr. Syed Ali Basit Mashhadi 7 Engr. Sham Sunder 36 Engr. Muhammad Jawad 8 Engr. Imran Khalid Niazi 37 Engr. Muhammad Talha Ghafoor 9 Engr. Zameer Ahmad Danish 38 Engr. Abdul Majid Khan 10 Engr. Ambreen Iqbal 39 Engr. Tahir Hafeez 11 Engr. Syed Zain ul Abdeen Bukhari 40 Engr. Saad Kibria 12 Engr. Muhammad Omer Yasin 41 Engr. Assad Hussain Gorsi 13 Engr. Ali Raza 42 Engr. Waqas Mushtaq 14 Engr. Hafiz Muhammad Arslan Rahman 43 Engr. Muhammad Asghar 15 Engr. Wahid Ullah 44 Engr. Aamir Shahzad 16 Engr. Ali Arshad 45 Engr. Muhammad Umair 17 Engr. Azeem Ahmad 46 Engr. Hassan Sarfraz 18 Engr. Zeeshan Arshad 47 Engr. Hassaan Ahmad 19 Engr. Khurram Shahid Minhas 48 Engr. Muhammad Kamran 20 Engr. Hassan Raza Dar 49 Engr. Amina Irfan 21 Engr. Bilal Rabbani 50 Engr. Muhammad Naveid Afzal 22 Engr. Muhammad Idrees 51 Engr. Ali Hussnain 23 Engr. Anwar ul Hassan Khan 52 Engr. Abdullah Bin Ahmad 24 Engr. Umer Khalid 53 Engr. Muhammad Ammar 25 Engr. Daud Junaid 54 Engr. Muhammad Rizwan 26 Engr. Adil Majeed 55 Engr. Muhammad Umar 27 Engr. Muhammad Huzaifa 56 Engr. Muhammad Ali Ijaz 28 Engr. Asad Ali 56 Engr. Muhammad Sajid Hanif 29 Engr. Junaid Naseem 66 Members admitted on 74/5th Meeting of Executive Council held on 4th November 2017 1 Engr. Seemab Tariq 34 Engr. Waqar Ishaq 2 Engr. Ayesha Muneeb 35 Engr. Tahir Riaz Sindhu 3 Engr. Samia Ijaz 36 Engr. Mona Mujeeb Jilani 4 Engr. Syed Faisal Anwar 37 Engr. Afshan Shareen 5 Engr. Ali Raza 38 Engr. Muhammad Junaid Ramzan 6 Engr. Mehak Jahangir 39 Engr. Fariha Iqbal 7 Engr. Usman Mushtaq 40 Engr. Rida Nasir 8 Engr. Adnan Asad 41 Engr. Muhammad Haris Wahid 9 Engr. Mariam Qaiser 42 Engr. Rizwana Batool 10 Engr. Muhammad Zeeshan 43 Engr. Muhammad Shahrukh Pasha 11 Engr. Tayyaba Khurhsid 44 Engr. Urooj Beenish 12 Engr. Zain ul Abidin 45 Engr. Hafza Ayesha Siddiqa 13 Engr. Shariq Qadeer Qureshi 46 Engr. Aneela Sajid 14 Engr. Adnan Ahmad 47 Engr. Malik Muhammad Sohaib Aslam 15 Engr. Haider Ali Abbasi 48 Engr. Ans Ahmed 16 Engr. Mujahid Abbas 49 Engr. Muhammad Abubakar 17 Engr. Ahsan Raza 50 Engr. Saima Munir 18 Engr. Suleman Khan 51 Engr. Muhammad Ammar Saeed 19 Engr. Muhammad Zia Ullah Khan 52 Engr. Zartasha Naeem Khan 20 Engr. Ali Raza 53 Engr. Kanwal Bai 21 Engr. Ehsan Ullah Khan 54 Engr. Nazish Aslam 22 Engr. Neelam Mughees 55 Engr. Ayesha Zafar 23 Engr. Muhammad Salman Khan 56 Engr. Hira Iqbal 24 Engr. Muzaffar Noor 57 Engr. Muhammad Akbar 25 Engr. Muzna Manzoor 58 Engr. Adeel Hakeem 26 Engr. Muhammad Rehan 59 Engr. Syed Salman Ahmad Zaidi 27 Engr. Sabrina Malik 60 Engr. Khalil Ahmad 28 Engr. Habiba Ghafoor 61 Engr. Sania Arif 29 Engr. Muhammad Asfandyar Khan 62 Engr. Hafiz Yasir Ilyas 30 Engr. Umair Siddiq 63 Engr. Amna Parvaiz 31 Engr. Aqsa Zulfiqar 64 Engr. Muhammad Ishaq 32 Engr. Muhammad Ahmad 65 Engr. Malik Bilal Ahmad Sikandar 33 Engr. Ilyas Wadood 66 Engr. Abbas Haider 67 67 Engr. Muhammad Talha Ejaz 74 Engr. Syed Azfar Hussain 68 Engr. Abbas Ali 75 Engr. Rooman Haseeb 69 Engr. Asim Niaz 76 Engr. Faisal Rasool Bhatti 70 Engr. Nasir Rafique 77 Engr. Abdul Rauf 71 Engr. Mujahid Hamood-ur-Rasul 78 Engr. Zunair Ibrahim Malik 72 Engr. Nabeel Aftab 79 Engr. Huzzair Ibrahim Malik 73 Engr. Syed Azfar Hussain OBITUARIES Fateha for the Departed Souls • Engr. Mian Muhammad Ashraf Former General Manager Tarbela passed away on 17th July 2017. • Engr. Haji Mohammad Rafique Habib, Chairman Habib Rafique (Pvt) Ltd. passed away on July 27, 2017 and was buried in Lahore on July 28, 2017. • Engr. Rafique Ahsan Qureshi, Former G. M (WAPDA) / Consultant World Bank passed away at Lahore. a College Add 68 Treatment of Waste Water in Lahore By Abdul Qadeer Khan1 Abstract: According to resolution passed by The general Assembly of United Nations on 28 th of July 2010 “Safe and clean drinking water and sanitation is a human right essential to the full enjoyment of life and all other human rights”. There i s commitment of National and Provincial Governments of Pakistan to provide access to safe and sustainable drinking water supply to entire population within a certain frame of time. Provision of facilities of access to safe drinking water and collection and disposal of waste water not only uplifts the living standard of people of the area but also improves hygienic and health condition of residents. With the passage of time it is revealed that provision of safe drinking water cannot be maintained on long ter m basis until it is ensured that disposal of waste water is according to international practices with proper treatment. In this regard National Environmental Quality Standards (NEQS) exist which will be followed. At the same time it is also admitted that treatment of waste water in Pakistan is a neglected sector, absence of which is creating serious environmental issues and problems. 1. Lahore WASA Current System: Lahore WASA, the 2nd largest Water utility of Pakistan, operating in the area of more than 350 -Sq.Km. through 5826 -Km Water Supply and about 4000 -Km Sewerage Network with the Sanctioned Budget Strength of 8,770. The underground sewerage system in the city was introduced around 1936 in shape of brick sewers with construction of disposal works at Main Outfall which lead the sewage to the River Ravi and / or irrigate farm land. The development of sewerage system in the city lagged behind due to rapid increase in population. The River Ravi flows to the west and south. The city is protected from the river by an earthen bund. Natural drainage is towards the river but the gradients are flat. Main drainage channels serve each of the major catchments. They carry sewage as well as s torm water. Storm drainage regulating stations have been constructed on the major drainage channels near protection bund. Currently the waste water is being disposed of directly or indirectly into River Ravi without any treatment. 2. Legal Requirements for Treatment of Waste Water: Pakistan Environmental Protection Act clarifies the need and necessity of the treatment of waste water before disposing into water bodies (River Ravi). Section 2 (xxviii)of the Act defines the “municipal waste” includes sewage, refu se, garbage, waste from abattoirs, sludge and human excreta and the like; Section 2 (xl) describes “sewage” means liquid or semi -solid wastes and sludge from sanitary conveniences, kitchens, laundries, washing and similar activities and from any sewerage system or sewage disposal works; Section 11 of Act having the title “Prohibition of certain discharges or emissions” 1 Managing Director, WASA Lahore (FROM 13.03.2017 TO 24.05.2017) 69 regulates the disposal of waste water. This Section is: (1) Subject to the provisions of this Act and the rules and regulations no person shall discharge or emit or allow the discharge or emission of any effluent or waste or air pollutant or noise in an amount, concentration or level which is in excess of the National Environmental Quality Standards or, where applicable, the standards established under sub-clause (I) of clause (g) of sub-section (1) of section 6. 3. Consequences of untreated Disposal of Waste Water: The water supply system of Lahore is 100% based on ground water and no alternative source like surface water is in use. Water is extracted from more than 517 deep tubewells. Since last two decades the abstraction from the aquifer of Lahore has been increased to many folds and water table is lowering @ one meter per annum on an average. This created a cone of depression in the centre of the city. Water table in the periphery is higher than this resulting in movement of ground water from periphery towards city. N 0 2 km Scale Mozang Water table contours above mean sea level (meters) in Nov. 1998 70 Currently, no Waste Water Treatment Plant (WWTP) has been constructed in Lahore and all the waste water is being discharg ed directly or indirectly into River Ravi. River Ravi is presently a sewage carrying drain and all the seepage from it is nothing but sewage. Flow of sewage from the River Ravi is slowly polluting the ground water reservoir of Lahore and its vicinity. This has been confirmed and proved in many tubewells between Bund Road and Multan Road. First of all this was noticed / detected at newly installed tubewell in Karim Park in the year -2009 after four months of start of its operation. Later on during the eight y ears this has been detected at many tubewells in the belt along the Bund Road. These are: i. Karim Park (Closed) ii. T no.5 iii. D Block Gulshan-e-Ravi iv. Akram park Sanda v. A Block Gulshan-e-Ravi (Light Smell) vi. E Block Gulshan-e-Ravi (Light Smell) 71 IDENTIFICATION OF ISSUES • Rapid Urbanization • High population Growth • Wasteful Use of Clean Water • Total dependence on Ground Water Excessive Pumping Ground Water Depletion Unrealistically High Water Demand Extraction of Water from Deeper Aquifer with Arsenic Impregnated Lithology • Disposal of Untreated Wastewater to River Ravi • Injection of Untreated Industrial Wastewater to Aquifer • Leeching of Toxic M aterial to Ground Water Saline Water Intrusion Biological and Chemical Contamination of Ground Water with Increasing Arsenic Concentration Water Scarcity and Health Issues 4. Study Conducted by PINSTECH: A study was conducted by Pakistan Institute of Nuclear Science and Technology for the ground water of Lahore namely “ASESSMENT OF GROUNDWATER POTENTIAL USING ISOTOPIC, GEOCHEMICAL AND NUMERICAL MODELING TECHNIQUES (a case study of Lahore aquifer). During t he study Pinstech team 72 injected Oxygen isotope 18O and observed the movement. They found that upto the Lahore Branch Canal the recharging source is river Ravi. The recharged / penetrated water is slowly moving toward the city centre. If this trend is not stopped it will pollute the large part of the aquifer under Lahore. Transient transport simulation: During this exercise the team injected isotope in the waste water of river and found it in the water of nearby tubewell. -8.5 -7.5 -6.5 0 5 km Scale Bund Road Mozang Model Town Railway Line Ferozepur Road Identification of Recharge Mechanism in deep Groundwater of Lahore Aquifer by  18 O Concentrations in 2006 Rain Recharge Mixed Recharge River Recharge 73 Particles introduced at one of the waste disposal site are captured by the screens of pumping wells 5. Feasibilities / Studies Already Conducted: 5.1 Feasibility Study conducted by French Consultant Egis International: ECNEC approved the construction of waste water Treatment Plant amounting to Rs.8917 million. This contains a French loan amounting to Rs. 7518 million. For this project the feasibility study was carried out by French Consultants Egis International. Consultancy services were commenced on 20.01.2011. The recommendation was use of Activated Sludge Process (ASP). Later on this project could not be materialized due to dispute on technology by the then WASA Lahore management. 5.2 Feasibility Study conducted by M/s NESPAK: M/S NESPAK carried out feasibility study for Mehmood Booti, Shadbagh and South West on the basis of Waste Stabilization Ponds technology during the period 2011 to 2013. 5.3 Feasibility Study conducted by M/s Meinhardt: M/S Meinhardt, a Singapore based consulting firm carried out this study for construction of Waste Water Treatment Plants from Mehmood Booti site to South West Lahore i n 2014. They proposed the technology Activated Sludge Process (ASP). 6. Master Plan for Construction of Waste Water Treatment Plants: Lahore WASA , on the basis of these studies proposed the following 07 (seven) waste water treatment plants: 74 S.N Treatment Plant Source Locations Design Capacity (Cusec) 2025 2045 1 North East 1 (Mehmood Booti) Mehmood Booti DS, Shalimar Escape Channel Ring Road near Bhamma 125 165 2 North East 2 (Shadbagh) Khokhar Road DS and Shad bagh DS Ring Road near Khokar 165 215 3 North West (Shahdara) Farukhabad and Shahdara Near Farrukhad 100 130 4 South West (Babu Sabu) Lower Chota Ravi Drain, Bhati Gate DS, Main outfall DS 1,2,3 Near Babu Sabu 475 600 5 South (Mohlanwal) South Lahore all Private Housing schemes. Near Babu Sabu 180 295 6 South East (Ferozepur Road) Localities along Ferozepur Road Cantonment Boards Near Hudira Ferozepur Road. 90 370 7 East Lahore (Tajpura, Alfaisal Town, Paragon, Jallo,etc.) Near Barki Road 90 135 TOTAL 1225 1910 Sr. No.1 to 4 are placed in Priority -I, whereas Sr. No.5 to 7 are proposed under Priority-II / Phase-II. 7. Signing of MOUs: On the occasion of First International Seminar on Business Opportunities in province Punjab (ISBOP) held on 05.011.2015 to 07.11.2015 MOUs were signed with two Turkish firms (namely Kalyon and STFA) for Construction of Waste Water Treatment Plants in Lahore. Later on MOUs were also signed with Chinese Synohydro and Chengdu municipality. 8. Visits for Capacity Building: In the light of MOU s signed two members from Lahore WASA and two from Faisalabad WASA visited Istanbul Turkey and physically checked the function of waste water treatment plants from 03.07.2016 to 07.10.016. 9. Submission of Un-solicited Proposal: After signing of the MOUs Kalyon and STFA made a JV to execute the project. Later on STFA left the JV and was replaced by Albayrak and Metito Utilities. Their Un – solicited proposal is ready and expected to be submitted soon. 10. Hiring of Services of Transaction Advisor: The Concept Paper for hiring the services of Transaction Advisor was presented to the Steering Committee of PPP Projects. The Steering Committee directed to submit 75 PC-II for hiring the services of Transaction Advisor. PC -II has been submitted and is under the process of sc rutiny. After approval of PC -II the Transaction Advisor will be hired for the following three sites: S.N Treatment Plant Source Locations Design Capacity (Cusec) 2025 2045 1 North East 1 (Mehmood Booti) Mehmood Booti DS, Shalimar Escape Channel Ring Road near Bhamma 125 165 2 North East 2 (Shadbagh) Khokhar Road DS and Shad bagh DS Ring Road near Khokar 165 215 3 South West (Babu Sabu) Lower Chota Ravi Drain, Bhati Gate DS, Main outfall DS 1,2,3 Near Babu Sabu 475 600 11. Current Pollution Level: Parameter Units Sampling Location Mixing of Chotta Ravi PS and Outfall DS Multan Road Disposal Station Babu Sabu Drainage PS Gulshan -e- Ravi Disposal Station Faecal Coli Forms (MPN/ 100ml) 2.4 x 106 1.7 x 106 3.4 x 106 7.0 x 106 Total Suspended Solids (TSS) (mg/L) 230 204 185 194 Biochemical Oxygen Demand (BOD5) (mg/L) 247 259 166 194 Chemical Oxygen Demand (COD) (mg/L) 449 465 299 358 76 12. Proposed Treatment Indicators: Sr. No. Design Parameter Units Value 1 Biological Oxygen Demand (BOD) Influent mg/l 250 Effluent mg/l <30 2 Chemical Oxygen Demand (COD) Influent mg/l 450 Effluent mg/l <100 3 Total Suspended Solids (TSS) Influent mg/l 250 Effluent mg/l <25 4 Fecal Coliforms (Restricted Irrigation) Influent MPN/100ml 5x105 Effluent MPN/100ml <10,000 5 pH Value Effluent 6.0-9.0 6 Oil & Grease Effluent mg/l <5 13. Proposed Implementation Plan: i. In the Phase -I four (04) Waste Water Treatment Plants will be installed and River Ravi from Shadbagh to Mohlanwal will be made free of waste water. ii. Unsolicited Proposal will examine and all observations will be conveyed to JV. Reply of JV is expected in a fortnight. iii. For hiring the services of Transaction Advisor PC -II process has been started has been approved in the PDWP Meeting held on 09.06.2017. Amended PC - II in the light of the recommendations on PDWP Meetin g and will be completed in two months. iv. To save the time in process of hiring of Transaction Advisor, the EOI have been sent for publication in the newspapers for opening on 11.07.2017. After short listing of firms technical and financial proposals will be invited. Services of Transaction Advisor w ill be hired to analyze the unsolicited proposal and further process include bidding and finalization of the transaction. v. During evaluation of bids, the JV will get extra five (05) Technical scores due to submission of “Un-solicited Proposal ”. In case, if any other bidder becomes the highest ranked bidder the JV will have the first right of refusal. vi. For the Mehmood Booti and Shadbagh sites solicited bid will be invited. vii. It is expected that execution at site will be started in the next calendar year. viii. 25 year concession agreement will be made between WASA Lahore least cost/ highest ranked bidder. 77 78 ENVIRONMENTAL CONCERNS FOR SUSTAINABLE USE OF GROUNDWATER FOR FOOD SECURITY IN PUNJAB by Ghulam Zakir Hassan1 and Faiz Raza Hassan2 Abstract: Pakistan is the 8th largest food producing country where irrigated agriculture contributes more than 90% of Pakistan’s food production. Agriculture is the largest single sector which contributes 22% of GDP, employs about 45% of the overall labor force and generates over 60% of foreign exchange. Groundwater consists of 96% of planet’s unfrozen freshwater and globally 60% of it is used for agriculture, 20% for domestic and 20% for industry. Pakistan is 4th largest user of groundwater after India, USA and Ch ina where more than 90% drinking, almost 100% industrial and more than 40% irrigation water requirements are met from groundwater. Global warming, temporal/areal variations in rainfall patterns, uncertainty in river flows, glacier melting are the major cha llenges to water resources of Pakistan. Pakistan has also suffered from the climatic changes like other parts of the world. Extreme events like floods and droughts have disturbed the hydrologic -cycle posing severe impacts on water resources. Groundwater resources are being rapidly expiated at an alarming and unsustainable rate in many areas of the world. A recent NASA study concluded that 21 of the largest 37 aquifers in the world have exceeded sustainability tipping points and are being over depleted. In Punjab province about 1.2 million farmer tube wells are pumping groundwater to meet 40 to 50 % of crop water requirements at farm -gate which has put the aquifer under stress especially in sweet groundwater zones consequently putting this natural gift beyond the limits of human utilization. To meet the ever increasing demand of food and fiber, cropping intensity has increased from 67% to 150% or even more in some areas which is a major driver for dependence on groundwater. About 3000 piezometers have been installed in the province to monitor the groundwater levels twice in a year and groundwater quality is being monitored from farmer tube wells. Research studies have indicated that activities like increasing cropping intensities, unplanned over pumpage, lack of awareness, use of chemicals in agriculture/food production, industrialization, urbanization, acidic rains due to air pollution, domestic waste, solid waste landfills, etc. are the major threats to sustainable use of gr oundwater which are deteriorating its quality and quantity at very alarming rates. Abnormal lowering of water table in sweet groundwater areas, inter-mixing of saline and fresh groundwater, increase in cost of groundwater pumping due to increase in depth t o water level, threats to agriculture due to secondary salinization etc. are the major consequences of ill - planning and over exploitation of groundwater reservoir. In this paper findings of various studies have been outlined to identify the critical areas and to suggest some management options for the replenishment of this fast depleting natural resource in Punjab. In urban 1 , Director, Irrigation Research Institute (IRI), Government of the Punjab, Irrigation Department, Library Road, Lahore 54000, Pakistan. Correspondence author: zakirjg@gmail.com 2 Assistant Director, Irrigation Research Institute (IRI), Government of the Punjab, Irrigation Department, Library Road, Lahore 54000, Pakistan 79 areas, like Lahore City, threat is very severe where annual average depletion rate of water level is 2.5 ft. At the same time it has b een found that during flood 2014, average groundwater table rose up to 2.5 ft. Potential sites for artificial recharge of aquifer have been identified and possibility of aquifer recharging through flood water has been explored. Impacts of these global clim atic changes on groundwater have been evaluated and some options for sustainable use of groundwater have been suggested. 1. Background As the world's largest distributed store of fresh water, ground water plays a central part in sustaining ecosystems and enab ling human adaptation to climate variability and change. The strategic importance of ground water for global water and food security will probably intensify under climate change as more frequent and intense climate extremes (droughts and floods) increase v ariability in precipitation, soil moisture and surface water. Here we critically review recent research assessing the impacts of climate on ground water through natural and human -induced processes as well as through groundwater -driven feedbacks on the clim ate system. Furthermore, we examine the possible opportunities and challenges of using and sustaining groundwater resources in climate adaptation strategies, and highlight the lack of groundwater observations, which, at present, limits our understanding of the dynamic relationship between ground water and climate. An assured supply of water has, therefore, been the prime concern of all societies. In our own time the increasing stress on capacities of water systems has led to a growing realization that it is only through a scientific approach to their management that we can hope to sustain the quality and regular availability of this basic human requirement. The need for appropriate integrated studies in developing countries is the most important in view of a n increasing population, widespread aridity and scarcity of fiscal resources and vagaries of hydro-meteorological conditions. Groundwater, surface water and land comprise a complex interlocked system and they must be considered and managed resultantly towa rds making the most optimal use of this precious resource. Groundwater resources are now being increasingly tapped to meet societal needs on account of their possible availability in the vicinity of the consumer. However, it is important to recognize that although groundwater has ubiquitous occurrence and vast magnitude, its potential as a perennial source is subject to wide spatio -temporal variations. With the advent of remote sensing and sophisticated data processing techniques, the speed and scale of inv estigations of visible resources such as land and surface water have greatly improved. Since last many years, rapid increase in population and urban sprawling has resulted in over extraction of groundwater especially in the urban areas to meet with human demands due to which underground water table is depleting at alarming rates. Urban sprawl is to be the fastest growing threat to local environment and quality of life. As urban areas expand, environmental problems like losing green space, groundwater recharge area, and degradation of natural ecosystem and deterioration of water resources are increased. The un -planned pumpage of groundwater is also causing salt-water intrusion into fresh groundwater due to which sweet groundwater resource is becoming scare. This needs formulation of long term policy framework and comprehensive planning to guard against fast depleting ground water resources. According to the 1981 census, Lahore has population of 2.7 million which increased to 6.4 million in1998 (Faiza & Tabsum 2009). Now the estimated population of 80 Lahore is more than 10 million and it is ranked in the most populated urban areas in the World (Wikipedia). It has been reported that more than 480 WASA tube wells are extracting about 478.67 Million gallon of groun dwater per day and is supplied through 7700 km pipelines distributed in the city (Hussain and Sultan 2013) . This situation has resulted in tremendous depletion of groundwater levels. The only source to recharge Lahore aquifer is Ravi River, the smallest e astern river of the Indus River System (IRS) which remains nearly dry except during monsoon season. However, Ravi River along Lahore is used for the discharge of untreated domestic and industrial waste water and effluents. There are over dozen disposal sta tions and surface water drains that discharge untreated waste water into the River. It was observed that untreated waste water is being discharged into the Ravi River (EPD 2008, Ejaz & et al 2011) and it is causing deterioration of groundwater quality alon g the river which may impact the overall quality of aquifer due to salt intrusion. According to survey it was estimated that levels of impurities in the water in drains enter into Ravi River are in excess of National Environmental Quality Standards set by the Pakistan Environment Protection Council and enforced by the Environment Protection Agency, Punjab (EPD 2008). As indicated in vision 2025 that in near future serious water scarcity situation may occur in Lahore city and it may suffer badly if necessary measures are not taken from today for the management of water resources and improvement of groundwater quality along Ravi River. A proper detailed investigation/research using groundwater flow and solute transport modeling approach in this regard is requi red to recommend the ways and means to replenish the groundwater reservoir to cater for the ever increasing stress on groundwater reservoir. Over exploitation of groundwater possess serious consequences on our infrastructural network in addition to other s ocio environmental concerns. Land subsidence is the lowering of the land -surface elevation from changes that take place underground. Common causes of land subsidence from human activity are pumping water, oil, and gas from underground reservoirs; dissoluti on of limestone aquifers (sinkholes); collapse of underground mines; drainage of organic soils; and initial wetting of dry soils (hydro compaction). In areas where climate change results in less precipitation and reduced surface -water supplies, communities will pump more ground water. Also, increased demands on ground -water supplies cause more land subsidence in areas already subsiding and new subsidence in areas where subsidence has not yet occurred. In Punjab province about 40 to 50 % of crop water requi rements at farm -gate and about more than 90% of drinking water demands are being met from groundwater by means of tubwells. Groundwater levels are depleting in certain locations (about 1.2 million tubewells) taking this natural gift beyond the limits of hu man utilization. In urban areas, this threat is very severe for example in Lahore City, the annual average rate of fall is 2.5 ft. Its quality is also deteriorating at many places due to one or the other reasons. Human activities like increasing urbanizati on, use of chemicals in agriculture/food production, industrialization, acidic rains due to air pollution, domestic waste, solid waste landfills, increasing cropping intensities, unplanned over pumpage etc. are the major threats to groundwater which are de teriorating its quality and quantity at very alarming rates. Growth of farmers Tubewells as shown in figure 1. 81 Figure 1: Growth of farmers Tubewells 2. Climate Changes in Pakistan Pakistan is highly vulnerable to climate change as its economy is heavily reliant on climate-sensitive sectors like agriculture and forestry, and its low - lying densely populated deltas are threatened by a potential risk of flooding. Climate change leads to changes in precipitation and evapotranspiration rates, which show a direct effect on the quantity and quality of both surface and subsurface water. Increase in temperature increases the capacity of the atmosphere to hold water and thus precipitation rate may increase. However, its effect on climate is spatio -temporal, being controlled by local or regional factors such as topography, vegetation, wind velocity etc. Studies based on the ensemble outputs of several Global Circulation Models (GCMs) projected that the average temperature over Pakistan will increase in the range from 1.3-1.5 °C by 2020s, 2.5-2.8 °C by 2050s (Planning Commission Govt. of Pakistan, 2010 ). The summer of 2010 caused a temperature of above 50 °C in twelve cities of Pakistan. Similarly, distribution of rainfall in Pakistan varies widely, mostly depending upon the monsoon winds and the western disturbances, but the rainfall does not occur throughout the year. Punjab and Sindh provinces receive 50 - 75% of rainfall during monsoon season (Salma, S et al., 2012). Gasoline, fertilizer, paint thinner, antibiotics – if it's used or abused by humans and dissolves in water or soaks through soil, it may show up in Wisconsin's groundwater. New concerns are coming to the attention of local citizen s and state government. These emerging issues include the potential for pharmaceuticals, pathogens and viruses to contaminate public or private wells. 2.1. Impact of Climate Changes on Groundwater The impact of climate change on groundwater includes, long term decline in groundwater storage, increased frequency and severity of groundwater droughts, 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 Number of Tubewells Year Growth of Tubewells (1981-2013) Total Elect Diesel 82 saline water intrusion into fresh water aquifers, secondary salinity, land subsidence etc. The direct impact of climate change on groundwater resources depends upon the change in the volume and distribution of groundwater recharge. If drier, warmer summers lead to the seasonal deficits in the moisture content of soils extending into the autumn, the winter groundwater recharge season may be shortened. This could be compensated, at least to some extent, by an increase in winter rainfall. However, aquifers are recharged more effectively by prolonged steady rain which continues into the spring rather than shor t periods of intense rainfall. The impacts of climate change could increase the cost of providing water supplies already rising as a result of deteriorating groundwater quality. Groundwater, of course, cannot be considered in isolation - impacts of climate change is necessarily related to groundwater, such as changing land use and population density, will have a knock -on effect on groundwater, for example through changes in water demand. In Punjab province about 40 -50% crop water requirements are being met from groundwater through about 1.2 million tubewells installed by the farmers. Groundwater quality in the Punjab province is deteriorating with the passage of time and sweet water is becoming rare and out of reach of the common farmers who are dependent on groundwater for their livelihood (Hassan et al, 2014) . In Punjab province, about 1.2 million tubewells are extracting groundwater without any scientific planning. Consequently, groundwater management is confronted with multitude of tiny users in Pakistan. Electricity or diesel are the major sources of energy for groundwater pumpage to boost up the food production. About 47% farmers are running their tubewells with tractors or diesel engines. The Indus Basin Irrigation System (IBIS) is the largest integrate d irrigation system in the World. Historically IBIS has been fed through run of river supplies derived from River Indus and its five major tributaries. For supplying water to Pakistan’s irrigation network, the Indus Basin Project (IBP) was designed and con structed to replace the waters of Eastern Rivers. Any reduction in these waters will put Pakistan’s agriculture, food security and economy at great risk. Tremendous increase in population demands for more food and fibre for which we need the extra water, s imilarly climatic changes have made the availability and reliability of surface water a question mark. Resultantly pressure on groundwater is increasing and water levels are dropping abruptly taking this resource beyond the bound of rural poor farmers. Ene rgy costs of pumping deeper groundwater are increasing manifolds. In many areas the unplanned and over pumping has caused intrusion of saline water into fresh groundwater. This has led to a very complex situation and the problem needs to be tackled in food security- groundwater-energy-climate change nexus. Hassan et al, (2013) during a study found that pollution in surface water bodies is affecting the groundwater quality in the underlying aquifer in Lahore city. They recommended to allow/arrange minimum fl ow in the River at least to meet the requirements of dilution of pollutants and to treat the wastewater before throwing it into the river. Domestic and industrial effluents contain organic and inorganic pollutants, which deeply percolate to groundwater. Fl ow in Ravi River especially during the winter is remarkably insufficient to dilute and wash off wastewater pollution (Hassan et al, 2016). 83 2.2. Groundwater Resources and Climate Change According to USGS, 96.5 % of Earth's water is oceans and 2.5% freshwater and other 0.9 % saline. Only a little more than 1.2% of all freshwater is surface water which serves most of life's needs. About 70% of fresh water is locked up in ice and another 20.9% is found in lakes. Rivers make up 0.49% of surface freshwater. Although rivers account for only a small amount of freshwater, this is where humans get a large portion of their water from. About 60% of groundwater withdrawn world wide is used for agriculture; the rest is almost equally divided between the domestic and industrial. In many nations, more than half of the groundwater withdrawn is for domestic water supplies and globally it provides 25% to 40% of the world’s drinking water (Vrba, J., and J. van der Gun. 2004). Developing countries – despite their larger population s have much less contribution in anthropogenic emissions. Developing countries, especially Least Developed Countries (LDCs) and Small Island Developing States (SIDS), who are already facing difficulties in alleviating poverty as a result of their economic situation, are particularly vulnerable to the adverse effects of climate change. These countries have insufficient social, technological and financial resources to adapt the situation (UNFCCC, 2007). The effects of global warming and climatic change requir e multi- disciplinary research, especially when considering hydrology and global water resources.The Intergovernmental Panel on Climate Change (IPCC) estimated that temperature of the Earth is continuously rising and it has increased 0.6 ± 0.2 oC since 1861 and predicted an increase of 2 to 4 oC over the next 100 years. Global sea levels have risen between 10 and 25 cm since the late 19th century (IPCC 2007). Pakistan, as a part of South Asia has also observed warming in spite of less discharge of greenhouse gasses as compared to industrialized developed countries (Pant and Kummar, 1997). Climate change has local, regional and globally impacts, some examples of major projected impacts are increased water related stresses such as droughts, sea level rise, dec reased freshwater availability, increased floods, decreased agricultural productivity, food production and security etc. (IPCC 2007). Climate change actually accounts for about 20% of the global increase in water scarcity. Climate variability and change ca n affect the quantity and quality of various components in the global hydrologic cycle. It includes atmospheric water vapour content, precipitation and evapotranspiration patterns, snow cover and melting of ice and glaciers, soil temperature and moisture, and surface runoff and stream flow with increasing temperatures (Bates et al, 2008 ). However, the extra precipitation will be unequally distributed around the globe. Some parts of the world may see significant reductions in precipitation or major alteratio ns in the timing of wet and dry seasons. Information on the local or regional impacts of climate change on hydrological processes and water resources is becoming more important. Water resources, both in terms of quantity and quality, are critically influ enced by human activity, including intensive agriculture and use of agro -chemicals, land-use pattern, construction and management of reservoirs, industrial development, pollutant emissions, water and wastewater treatment. Water use is linked between changes in population and food consumption. Global water use is probably increasing due to population and economic development but also changing societal views on the value of water. Predictions include higher incidences of severe weather events, a higher likeli hood of flooding, 84 and more droughts. The impact would be particularly severe in the tropical areas, which mainly consist of developing countries, including Pakistan. Pakistan is the 4 th country out of 15 nations with the largest estimated annual groundwater extractions (J. van der Gun. 2013). According to United Nations World Water Development Report, 2.5 billion people worldwide depend solely on aquifers, which include 273 transboundary aquifer systems, as their primary water resource to meet their daily needs. Groundwater contributes flow to rivers, lakes and wetlands. Water reserves of the 21 out of 37 largest aquifer of the world have been declined. The most noticeable impacts of climate change could be fluctuations in surface water levels and quality. The greatest concern for water managers and Government is the potential decrease in level and quality of groundwater supplies. The rise in groundwater use associated with predicted population growth would pose a higher threat to the aquifer than climate c hange (Loaiciga 2003 ). The unscientific abstraction of groundwater resources has extent of the interface and seawater intrusion into the aquifer (Sherif and Singh, 1999; Ghosh Bobba, 2002 ). Irrigation generates about 40% of total agricultural output (Fischer et al., 2006). Groundwater levels have been measured using water level indicator from the piezometers biannually (pre -monsoon and post -monsoon). The observed data have been analyzed to visualize the aquifer behavior in the Punjab province. (IRI, 2009) and (IRI, 2013) conducted a field survey and investigation study by installation of sixty exploratory boreholes at various critical sites in Punjab to explorer the groundwater quality and soil stratification to observe the impact of surface drains and othe r potential threats for groundwater. Wherein it was observed that surface water bodies especially drains are playing a vital role in contamination of groundwater. A study was conducted for groundwater investigation in Faisalabad area using Groundwater Model (MODFLOW) where tile drainage and surface drainage networks are functional and groundwater is brackish for which one of the causes is heavy industrial pollution in the area (IRI, 2012). Total recharge of aquifer during flood season 2014 in Chaj Doab has been estimated as 1.20 MAF (million acre -feet). Recharge potential in Chaj doab during October 2010 and June 2012 were found out as 4.32 and 4.675 MAF respectively (IRI, 2016). 3. Water and Food Security 3.1. Groundwater Scenario in Pakistan Pakistan is the 4 th largest user of groundwater after India, USA and China where groundwater is also used for domestic and industrial purposes . Irrigation System in Indus Basin (IBIS) was designed during the 19 th century to meet the designed cropping intensity of 60 - 70%. Presently, the cropping intensity in the IBIS is around 160% to meet the food requirement of increased population. Due to insufficient supply of surface water, groundwater has been used more than 40% for agriculture in Pakistan. There were about 0.55 Million tubewells in the country in 2000 which have reached about 1 million tubewells in Punjab. High extraction of the groundwater by tubewells has resulted negative effects including a decrease of groundwater levels which is positive in areas where fields are w aterlogged or salinized due to capillary rise from shallow groundwater (IWASRI 1991). Climate changes show both negative and positive impact on the use of groundwater for agriculture and domestic purposes. In the areas, where low rainfall and drought periods exist, the intensity of groundwater extraction has enhanced resulting 85 declining of water levels. In the areas where high rainfall exist and flooding occur, less extraction of groundwater and more recharge of aquifer takes place. Low Land and Water Productivity as shown in figure 2. Figure 2: Low Land and Water Productivity Excessive use of groundwater is critical for food production and environmental sustainability. Research study carried out in Lower Bari Doab Canal (LBDC) has indicated that by increase of depth to water table from 40 ft to 70ft the cost of pumping per acre-feet has increased 125%. Our food basket, the Punjab province is under severe threat due to excessive energy requirements for pumping the groundwater from deeper and deeper aquifers. Due to lowering of water table deeper and deeper, pumping cost has also increased in the critical areas of Punjab as shown in Figure 3. Figure 3: Increase in Cost of Ground Water Pumping with Decline in Water Table About 40 to 50 % agriculture water requirement is met from groundwater and almost 100% of the water supply in urban areas is dependent on groundwater. Due to unplanned discharge of groundwater; the levels are continuously falling down. For 86 example in Lahore city (provincial capital) the groundwater levels are falling at an alarming rate of 2.5 ft/year (2009-13). Groundwater levels in the rural irrigated areas districts like Vehari, Multan, Khanewal, Chiniot etc. are declining continuously due to high pumpage by farmers and public tubewells. It has been predicted that an average drop in gro undwater level by 1 m would increase carbon emissions by over 1%, because for the withdrawal of the same amount of water by diesel operating tubewells, there will be increased fuel consumption (IRI, 2015) . Continuous depletion of groundwater has been shown in Figurers 8 and 9 for an area in Southern Punjab. Average rise in water-table in Rechna doab during flood 2014 has been observed is 2.57 ft/season. Total recharge of aquifer during flood season 2014 in Rechna Doab is 1.90 MAF (IRI, 2015). GW contribution NOW can be more than 50% in irrigation sector. The groundwater annual abstraction increased from about 4 MAF in 1959 to about 50 MAF in 2000. Growing Role of Groundwater in Irrigation Sector in Pakistan as shown in figure 4. Figure 4: Growing Role of Groundwater in Irrigation Sector in Pakistan 3.2. Air pollution is water pollution Particles clouding the air from car exhaust, smokestacks and dust from city streets or farm fields can contribute to groundwater contamination. These particles of hydrocarbons, pesticides and heavy metals settle on the ground, are washed into the soil by rain, and eventually trickle into aquifers. Although a rain shower may disperse the particles from the air, the rains can carry the pollutants down int o the ground as the water hits land. 3.3. Fertilizer and manure storage and application Protecting water quality and farm profits is a balancing act that the UW -Extension's Nutrient and Pest Management Program is trying to perfect. To produce good yields, farmers need to apply nitrogen, phosphorus and other nutrients to their crops. If farmers don't account for the nutrients contained in the manure they spread on their fields, crops may be over-fertilized. Excess nitrate plants can't use will leach into the groundwater and excess phosphorus will runoff into lakes, streams and wetlands. Proper measuring of nitrogen and phosphorus in manure saves farmers the cost of purchasing extra commercial fertilizer – and also protects groundwater. Farmers also must be careful about where and when they spread manure. Spring snowmelt or 87 excessive rainfall can lead to fish kills and contamination of drinking water wells due to bacteria in manure t hat has run off from farm fields. As subdivisions replace farm fields in rural areas, lawn replace crops. Over -use of commercial lawn fertilizer is an additional source of nitrate to groundwater. Fertilizer consumption in Punjab as shown in figure 5. Figure 5: Fertilizers consumption in Punjab 3.4. Use and misuse of pesticides All types of pesticides, (insecticides, herbicides and fungicides) have been used in Wisconsin agriculture for a long time. These pesticides can reach groundwater when spilled at storage, mixing and loading sites, or when over -applied to fields. "Empty" pesticide containers not properly disposed of are another source of trouble. Just a little spill of most pesticides can have a big impact on groundwater quality. For example, three parts per billion of atrazine (an herbicide used widely for riding corn crops of weeds) in groundwater is enough to increase the risk of cancer for those who drink the water. Area treated with Pesticides as shown in figure 6. Figure 6: Area Treated with Pesticides 0 1000 2000 3000 4000 80-1979 90-1989 2000-1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013-14 FERTILZER USED (THOUSAND TON) YEARS Nitrogenous Total Fertilizers 0 5000 10000 15000 20000 25000 30000 1996-97 1997-98 1998-99 1999-2000 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 Pesticides (Thousand sparay) Years 88 Protecting groundwater from pesticide contamination while maintaining farm profitability isn't easy – too much pesticide and the environment suffers; too little and crop yield goes down. Integ rated pest management, or IPM, is a pest control strategy that uses all appropriate control methods (chemical and nonchemical) to keep pest populations below economically damaging levels while minimizing harm to the environment. Here's how it works: farmer s "scout" their fields for weeds and pests. After identifying what is present, the farmer purchases and applies the minimum amount of herbicides and insecticides only in the areas where weeds and bugs are a problem. Farmers using IPM find they spend less o n pesticides. It's a bargain for the environment, too. 3.5. Wastewater Wastewater, generated by municipalities, industries and farms may be treated or stored in ponds or lagoons. Many small communities operate lagoon systems for treating sanitary sewage through bacterial degradation of organic material in the wastewater. A manure lagoon on a dairy farm can hold waste until conditions are right for field application. Lagoons are sealed with compacted clay or plastic liners. Nevertheless, burrowing animals or soil movement can cause leaks. Routine inspections and maintenance are necessary to keep lagoons operating properly and to prevent contamination of groundwater. Some industries dispose of their wastewater by applying it to farm fields or to land specifically o perated as a disposal system. Most municipalities and some industries also apply sludge produced in their treatment systems to cropland as a nutrient and soil conditioner. The waste is applied according to how much water, solids and nutrients soil and crops can absorb. If the system isn't managed properly, and too much waste and water are applied to the land, or if the operator fails to adjust the amount applied to account f or rainfall, groundwater and wells can be contaminated or the material may run off to surface waters. In the Rechna Doab, analysis of 2500 shallow water samples (6 to 18 cm below ground surface) shows that about 50% of the total samples contain salinity of 750 ppm, about 40% up to 1500 ppm and the rest goes up to 3000 ppm. In general, a vertical gradient exists within the GW aquifer that must be taken into account in GW studies, the water depth occurred at a depth of more than 10 meters, and in the center o f the Doab at more than 30 meters (Qureshi, et al. 2002). The effective conjunctive water use may help the farmers to increase the cultivated area under crops in the Rechna Doab. It is recommended that the technical conjunctive water use strategies must be identified and implemented on the farmers’ fields in orde r to help them in increasing their income whilst promoting sustainable conjunctive use and management of surface and groundwater. Careful monitoring of institutional reforms is required to assess the adequacy of reform, the impacts of new arrangements on w ater resource infrastructure, productivity and the environment (Jehangir et al. 2002). 3.6. Storm water When development occurs, recharge to groundwater can be short -circuited. Rainfall, instead of infiltrating, runs off pavement and collects in lakes rivers an d streams. Stream levels become more variable or "flashy" floods and channel erosion are more common, and groundwater recharge decreases. Because storm water from roofs, driveways, parking lots and streets contains contaminants such as gasoline, metals, 89 and bacteria it must be cleaned up or pretreated before it is put back in the ground using engineered storm water infiltration devices. 3.7. Sources of natural contamination Minerals found naturally in soils and rocks dissolve in groundwater, giving it a particular taste, odor or color. Some elements, such as calcium and magnesium, are beneficial to health. Radium, radon gas, uranium, arsenic, barium, fluoride, lead, zinc, iron, manganese and sulfur are undesirable ingredients found in Wisconsin groundwater. The l evels of the contaminants depend on their concentrations in the aquifer and the amount of time the water has been in contact with them. Radioactive contaminants expose those drinking the water to risk of cancer. Public water systems are required to test groundwater for radioactivity. Most natural contaminants aren't harmful, the problem is aesthetic rather than safety. Iron and manganese are found throughout the state. They stain plumbing and laundry, and can give drinking water an unpleasant taste and odor. 3.8. Future effects Due to climate changes, Punjab Province has experienced flood events during the past several decades. Flood 2014 resulted in significant infrastructural damages, population displacement and loss of lives in the province of Punjab. However floods and local rainfall have significant positive impacts on shallow groundwater. Depth to ground water table during flood 2014 has reduced. Groundwater levels at selected points have been observed pre and post flood 2014, to see the impact of flood wate r on groundwater level fluctuations. Flood water contributes significantly towards recharging the aquifer average. Average rise in water -table in Rechna doab during flood 2014 has been observed is 2.57 ft/season. Total recharge of aquifer during flood seas on 2014 in Rechna Doab is 1.90 MAF ( IRI, 2015). Average water level raised in Rechna Doab in some areas is shown in Figure 7. Figure 7: Average water level rise in various areas in Rechna doab during flood 2014 3.9. Droughts and Heat Waves Droughts in the Southwest and heat waves (periods of abnormally hot weather lasting days to weeks) everywhere are projected to become more intense, and cold waves less intense everywhere. 90 Summer temperatures are projected to continue rising, and a r eduction of soil moisture, which exacerbates heat waves, is projected for much of the western and central U.S. in summer. By the end of this century, what have been once -in-20-year extreme heat days (one -day events) are projected to occur every two or thre e years over most of the nation. About 40 to 50 % agriculture water requirement is met from groundwater and almost 100% of the water supply in urban areas is dependent on groundwater. Due to unplanned discharge of groundwater; the levels are continuously falling down. For example in Lahore city (provincial capital) the groundwater levels are falling at an alarming rate of 2.5 ft/year as depicted in Figure 8 (2009-13). Figure 8: Groundwater depletion in Urban Areas (Lahore city) Groundwater levels in the rural irrigated areas districts like Vehari, Multan, Khanewal, Chiniot etc. are declining continuously due to high pumpage by farmers and public tubewells. It has been predicted that an average drop in groundwater level by 1 m wou ld increase carbon emissions by over 1%, because for the withdrawal of the same amount of water by diesel operating tubewells, there will be increased fuel consumption (IRI, 2015) . Continuous depletion of groundwater has been shown in Figurers 8 and 9 for an area in Southern Punjab. 91 4. Conclusions From the analysis of data collected it has been observed that unplanned excessive pumpage, lack of awareness and capacity of stakeholders, lack of regulatory framework and spatial/temporal uncertainty in surface water due to climatic changes (droughts and floods) are the major challenges for groundwater management in Punjab. In Chaj Doab the watertable are showing rising trends with an average rate of 0.9 ft/year and quality is deteriorating with the passage of time. In the Rechna Doab area it has been obse rved the average depleting rate is 1 -2ft/year and over exploitation in certain areas is causing intermixing of fresh and saline water leading to overall groundwater quality. Groundwater in Bari doab is under the worst conditions where water table has gone below 50-60 ft in certain areas and cost of pumpage has increased more than 100 times. In urban areas due to increase in population and reduction in recharge to infrastructural development groundwater in under tremendous pressure. For example in Lahore cit y (provincial capital) groundwater has fallen even more than 100 ft below the natural surface and average annual rate of groundwater depletion is 2.54 ft. Direct energy intensity has risen 80% (from 1 to 1.8 MJ per kg of crop produced) in Punjab between 19 95-2010. Use of groundwater in irrigated agriculture consumes 30 times more energy as compared to surface water. It has been observed that flood water plays a significant role in recharging the aquifer. For example during flood 2014, 2.57 ft rise in water table has been observed in Rechna doab. • Groundwater-Energy and Food Security are linked together and impose serious impacts on each other • Sharp increases in the energy price lead to sharp declines in food production, or rapid increases in world food prices. • These sharp increase s in energy price are unlikely to help stop or reverse the ongoing degradation of groundwater ecosystems • Threat of salinity and waterlogging owing to miss -management of groundwater will lead to reduction in food production and will consume more energy for reclamation. • Demand for water, food and energy is expected to rise by 30 -50% in the next two decades • About 47% farmers are running their tubewells with tractors or diesel engines • Use of groundwater in irrigated agriculture consumes 30 times more energy as compared to surface water • Energy costs increase as the GW levels fall down 5. Recommendations ➢ Treatment of industrial and municipal effluents before throwing into the Rivers/water bodies ➢ Before drainage we should think about groundwater ➢ Production of all pollutants should be reduced or minimized at source through scientific research and tools. ➢ To maintain minimum flow in Ravi River for dilution of pollutants 92 ➢ Drainage effluents should be minimized at source ➢ Solid waste management should use geo-synthetic materials ➢ Farmers must be educated to use less toxic and in limited/required quantity fertilizers, pesticides, weedicides etc. ➢ Formulation of long term policy framework/ legal framework and comprehensive master planning ➢ Rainfall should be kept separate from industrial and domestic effluents and be harvested to recharge the aquifer ➢ Training, capacity building and awareness raising among the stakeholders 6. References 1. Bates, B., Kundzewicz, Z. W., Wu, S. & Palutikof, J.P., (2 008). Climate change and water. Technical Paper VI of the Intergovernmental Panel on Climate Change. Geneva, Intergovernmental Panel on Climate Change Secretariat. 210 pp. 2. EPD, Environment Protection Department. (2008) . Environmental Monitoring of Ravi Riv er, Study carried out under Annual Development Scheme, Monitoring of Surface Water Bodies in Punjab. November 2008. EPA Laboratories, Environmental Protection Department, Government of the Punjab, National Hockey Stadium, Lahore. 3. Faiza. M., & Tabsum J. (20 09). Temporal Population Growth of Lahore, Journal of Scientific Research, Vol.XXXIXNo.I, June 2009 ISSN 0555-7674. 4. Fischer, G., F.N. Tubiello, H. van Velthuizen, D. Wiberg, (2006) . Climate change impacts on irrigation water requirements. Global and re gional effects of mitigation, 1990 –2080. Tech. Forecasting Soc. Ch., 74, doi:10.1016/j.techfore.2006.05.021. 5. Ghosh, B. A. (2002). Numerical modelling of salt -water intrusion due to human activities and sea -level change in the Godavari Delta, India. Hydrol ogical Sciences Journal, Vol. 47(S), August 2002, pp. 67-80. 6. Hassan, G. Z., Hassan, F. R., Akhtar, S. (2014) . Environment Threats to Groundwater in Lahore Area., Pakistan Engineering Congress, Lahore Pakistan; World Environment Day: 68-97. 7. Hassan, G. Z., Hassan, F. R., Akhtar, S., (2016) . Environmental Issues and concerns of Groundwater in Lahore. Proceedings of the Pakistan Academy of Sciences.; Life and Environmental Science 53(3) 163 -178 (2016), ISSN 2518 - 4261 (print), ISSN 2518-427X (Online): 163-178. 8. Hassan, G. Z., Shabir, G., Hassan, F. R., Akhtar, S., (2013) . Impact of Pollution in Ravi River on Groundwater underlying the Lahore City. Proceedings 72nd Annual Session of Pakistan Engineering Congress, Lahore, Pakistan. Paper 749: 355-380. 9. Hussain. F., Sultan. A., (2013). Existing Situation of Sewerage in Lahore City and its Impact on Ravi River, The Urban Gazette, Lahore, Pakistan. 93 10. Intergovernmental Panel on Climate Change (IPCC), Fourth Assessment Report: Climate Change, (2007). (Synthesis Report), adopted at IPCC Plenary XXVII, Valencia, Spain, 12 -17 November 2007, at IPCC 4AR Synthesis Report [hereinafter IPCC 4AR Synthesis Report. 11. Irrigation Research Institute (IRI), (2012) , “Groundwater Investigation for Sustainable Water Supply to FDA City Housing Scheme, Faisalabad” Government of the Punjab, Irrigation Department, Irrigation Research Institute, Research Report No IRR-Phy/577. 12. Irrigation Research Institute (IRI), (2013) . Research Studies on Artificial Recharges of Aquifer in Punjab. Government of th e Punjab, Irrigation Department, Irrigation Research Institute, Lahore, Pakista: Research Report No IRR-Phy/579. 13. Irrigation Research Institute (IRI), (2015) . Groundwater Behavior in Rechna Doab, Punjab, Pakistan. Groundwater Management Cell, Irrigation Dep artment, Irrigation Research Institute, Lahore, Pakistan: Research Report No IRR - GWMC/101. 14. Irrigation Research Institute (IRI), (2016) . Challenges and Opportunities for Sustainable use of Groundwater in Chaj Doab, Punjab, Pakistan. Groundwater Management Cell, Irrigation Department, Irrigation Research Institute, Lahore, Pakistan: Research Report No IRR-GWMC/102. 15. Lashari, B., McKay, J. and Villholth, K. (2007). Institutional and Legal Groundwater Management Framework:Lessons Learnt From South Australia For P akistan. International Journal of Environmental and Development , 4 (1) (2007). 16. Loaiciga, H. A., (2003) . Climate change and ground water, Annals of the Association of American Geographers, Vol. 93 (1), pp. 30–41. 17. Pant G. B, Kumar K. Rupa, (1997) . Climate of South Asia’, John Wiley and Sons Publishers, England 18. Planning Commission Govt of Pakistan, (2010) . Task Force on Climate Change, Final Report. 19. Qureshi, A. S. Hussain, A. ; Makin, I. (2002) . Integrated database development for river basin management: An ex ample from Rechna Doab. Working paper 53. Lahore, Pakistan: International Water Management Institute (IWMI). 20. Salma, S., S. Rehman, M. A. Shah, (2012). Rainfall Trends in Different Climate Zones of Pakistan. Pakistan Journal of Meteorology Vol. 9, Issue 17: Jul 2012. 21. Sherif, M. M., Singh, V. P., (1999) . Effect of climate change on sea water intrusion in coastal aquifers. J. Hydrol. Process. 1999, 13, 1277–1287. 22. UNFCCC, (2007) . Climate Change: Impacts, Vulnerability and Adaptation in Developing Countries, p. 6 Vrba, J., J. van der Gun., (2004). The World’s Groundwater Resources. http://www.un-igrac.org/dynamics/modules/SFIL0100/view.php?fil_Id=126. a Library Add b 94 WORLD ENVIRONMENT DAY – 2016 KEY RECOMMENDATIONS on the topic of “Join the Race to make the World a Better Place” On Saturday, the 4th June, 2016 Pakistan Engineering Congress celebrated World Environment Day on the theme of “Join the Race to make the World a Better Place ” on Saturday, the 4 th June, 2016. Welcome Address was presented by Engr. Ch. Ghulam Hussain, President Pakistan Engineering Congress. Thirteen (13) papers were presented by Environmental specialists. It was a very well attended event and was widely covered by News & Electronic Media. The Papers are being printed in a book form and will be distributed free of cost. Given below are the recommendations made by the Speakers:- Paper: Illegal Trade in Wildlife, How Pakistan is affected Author: Dr. Abdul Aleem Chaudhry Recommendations The context and the extent of illegal wildlife trade is so large that it would rather be impractical to fully stamp it out. Efforts can however be made to reduce its extent as much as possible. The following recommendations are made: • Review and improve legislation, and streamline inter -provincial and inter - departmental coordination; • Strengthen the capacity of relevant law enforcement agencies through provision of enforcement facilities (vehicles, POL, equipment and training (technical skills which enable to identify, rescue and release of confiscated wildlife)); • Improve surveillance of wildlife trafficking by establishing Wildlife Information Desks at Karachi, Lahore, Peshawar and Islamabad Airports in close collaboration with concerned Prov incial Wildlife Departments, Pakistan Customs, and Civil Aviation Authority; • Take steps to comply with Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) regulations by supporting program development, workshops and the creation of regulations; • Launch an awareness program to enhance the knowledge of the decision makers and the general public on the importance of conservation and threats posed by illegal wildlife trade; • The Ministry of Climate Change and Pakistan Telecommunication Authority may be approached to ban/block websites and social media pages which offer wildlife for sale illegally; legal action may also be taken against such individuals / companies, organizations; • Conduct studies based on the wildlife seizure data available with provincial wildlife departments to determine spatial variation/synergies in the wildlife crimes and illegal trade hotspots. 95 • Conduct Genetical studies to validate the medicinal u sage of wildlife in ointments, if confirmed would support development of a strategy to control over the herbal medicinal use of wildlife derivatives. -.-.-.- Paper: Analyzing High -Altitude Temperature Series Using Man -Kendall and Sen’s Slope Tests to Asse ss Trends in Climate for Upper Indus Basin Author: Mian Waqar Ali, Mr. Asim Rauf Khan Recommendations: The application of MK and Sen’s Slope tests revealed the month wise and year wise trends in temperatures for selected fourteen stations in the UIB (upper Indus Basin). Some significant trends were reported by the tests both in month wise as well as year wise analysis. In month wise analysis some stations showed significant trends for the months of February, March, July, August and September. For February and March, the trends were rising while for July, August and September, all the significant trends were falling. There were three stations which showed significant falling trend in temperature in the year wise analysis. From the results, it is evident that winter is getting warmer while summer is getting cooler. Similarly, spring is also getting warmer. The most important result of the analysis was the significant falling trends in temperatures in the latter part of the summer i.e., July to September. This is the period when melt waters from glaciers are the prime contributors towards total river runoff in the Indus. -.-.-.- Paper: Turning deserts into farmlands Author: Dr. Naveed Alam Recommendations: The scientific outcome of this research will promote long -term conservation of this species in arid and semi-arid environments, which it turns green without any external source of water, where it restores salt -affected lands, and where it provides an additional and sustainable source of water to crops. If we plant this species alongside the irrigated areas, this will result into reduced irrigation cost. The commercialization aspect of this research will be patented; scientific output will be published in peer -reviewed journals of high impact and presented at international conferences and forums. We are interested to develop our further understanding on this unique topic, which will provide a sustainable solution of groundwater use in deserts and salt -affected lands, and, therefore, this research is an essential requirement to achieve this goal to sustain and secure supply chains of our future food. -.-.-.- 96 Paper: Climate Change and Poverty Alleviation Author: Prof. Shahida Saleem Recommendations: ➢ In order to protect people from the devastating effects of climate change, carbon efficient new technologies and renewable energies must be used. Old equipment should be made more energy efficient. ➢ Advanced countries must help the less developed countrie s to move towards low-carbon and environment friendly societies, as they have the knowledge and technology to mitigate climate change. ➢ For lowering the level of greenhouse gases in the atmosphere more trees should be planted and deforestation must be discouraged. ➢ Reducing the impact of climate change on poverty requires strengthening the social protection system to make programs scalable and targeted to those in need. ➢ Devastating effects of disasters should be minimized by effective disaster preparedness and its management. ➢ Unless governments move now to reduce emissions, no one will be safe from the effects of climate change. -.-.-.- Paper: Pollution load Assessment of Open Water Channels in Islamabad City in relation to Urbanization Pressure Author: Ms. Mehwish Haq Nawaz, Dr. Audil Rashid, Dr. Muhammad Anwar Baig Recommendations: Findings of the present study focused on water samples collected from five residential sectors of Islamabad city showed considerable variations in the physico - chemical para meters such as temperature, pH, TSS, Hardness, EC, COD and concentration of sodium, chlorides, lead and zinc. These variations appeared to be influenced by population rise over the past few years and their subsequent effect on pollution load in open water channels. The temperature of water samples ranged from 14.5°C to 20.5°C, which was within WHO limits. This was probably due to the presence of vegetation at the sampling sites that were characteristically observed in all sectors of Islamabad. Although wide and narrow ranges have been reported such as 15 to 35°C range was observed in Gomti river (Singh et al., 2005) and from 11 to 13°C in Pinios river (Loukas, 2010) but at the same time, significant effect of stream shade resulting from unmanaged native forest sites has also been cited as the cause of significantly lower temperature mean values (Miserendino et al., 2011). Further we emphasized on pH of water samples which is considered an important parameter for testing water quality and interpreting aqueous chemistry (Baig et al., 2009). The pH of the water samples from all study sites was within WHO limits except in sector F –11 where the pH value of the water sample were slightly acidic (6.07). This indicates that urban domestic waste generated in residentia l sectors of Islamabad located along open water 97 channel is not disturbing the background pH values. However, in sector F _11, effluent discharged from the fabric painting industrial unit may have caused acidity in water. It is, therefore, reasonable to believe that effluents discharge, if present in any area, would have definite effect on pH of adjacent water bodies . Reports have shown contrasting pH results when compared to neighboring localities such as in Patancheru industrial area where all samples, exce pt one have neutral to basic and alkaline values (Krishna et al., 2009). The EC of water samples were found (0.72 –1.04 mS cm -1) to be higher than WHO permissible level, the high level of EC was due to significant amount of dissolved salts, high salinity and mineral contents in all the sampling sites, same result of EC due to significant amount of dissolved salts, high salinity an d mineral contents has been repoted in water samples (Arain et al., 2009; Kazi et al., 2009). It also corresponds to the highest concentration of dominant ions, which are the result of exchange and solubilization in the aquifer (Sanchezperez and Tremoliere s, 2003). The range of TDS and conductivity in water samples was found in the range of 430 to 565 mg L –1 and 0.72 to 1.04 mS cm -1 respectively. Kazi et al. (2009) reported the range of TDS and conductivity in lake water 3580 to 4440 mg L –1 and 5.01 to 6.22 mS cm-1, respectively. The EC and TDS showed range of 0.055 to 0.337 mS cm -1 and 35.3 to 219 mg L –1, respectively in Jinshui River (Bu et al., 2009). Chlorides concentration was observed in a range of 320.51 to 454.28 mg L –1. This high level of major anio n Cl in water samples was observed with the increase of EC. Same results of Cl concentration has been shown previously (Zacheus and Martikainen, 1997; Kazi et al., 2009). The calculated COD values for all the water samples exceeded the Pak -EPA limits. Parameter COD is widely used for deteriorating waste concentration and is applied primarily to pollutant mixtures such as domestic sewage, agricultural and industrial waste. The concentration of Na ranged from 90.2 to 151.65 mg L –1, and Mastoi et al. (2008) reported Na concentration 460 to 590 mg L –1 in Mancher lake Jamshoro. But in Kallar Kahar lake sodium was observed from 250.1 to 650.1 mg L –1 (Raza et al., 2009). Pb and Zn probably the most harmful because of their non – biodegradable nature and sorption. D omestic, industrial and agricultural activities are partly responsible for higher concentration of heavy metals in water resources (Ma et al., 2009). Lead concentration in water samples showed alarming results in sector G–10, H–10 and I –9 by exceeding the permissible limits of Pak -EPA. Mastoi et al. (2008) reported a low concentration of lead (0.004 –0.0096 mg L –1) in the drain of Sehwan. But alarming results were found by Nazif et al. (2006) in Bara River of Nowshera, lead concentration ranged from 0.43 to 0.63 mg L–1. With the increase of population, temperature, TSS, COD, hardness, Pb and Zn gradually increased, showed pollution load. Present study estimated positive correlation of temperature, TSS, COD, hardness, Pb and Zn with population. Increased value of COD represented high pollution load due to domestic and industrial waste water discharge. Alarming increase in Pb and Zn was calculated with the increase in population. All the sources of water pollution, i.e. industrial and domestic wastes not only co ntribute toxic chemicals to water but they also result in an increase of parameters like COD, TSS, TDS and thus deteriorate the water quality and make it unfit for drinking and other purposes. A lack of improper sewage disposal and of solid waste disposal system is threatening water resources in urban areas. The lack of organized collection of solid waste in the study area is the problem that leads to indiscriminate dumping of refuse. Thus waste disposal can 98 create serious pollution of water resources, espe cially where there is no control of waste disposal in or near water. In a study area, a lack of adequate sanitation facilities continues to threaten water resources in urban areas. Sharp increases in population and economic development in the study area me an that human activity has become an important geological agent that affects surface water and ground water both directly and indirectly leading to imbalance in the chemical composition of water. Water of sector E_11 was loaded with the pollution of EC, COD and Cl concentration. This pollution load gave the evidence of water quality deterioration. pH, EC, COD and Cl threaten the water quality by loading pollution in water of F _11. Load of pollution in G _10 water was determined in terms of EC, COD, Cl and le ad concentration. Water of H _10 was unfit for any use, contaminated by EC, COD, Cl and lead concentration. Water of I _9 was highly polluted and showed alarming conditions of water quality having the pollution load of TSS, hardness, EC, COD, Cl and lead con centration. TSS, T –Hardness, EC, COD, Cl and Pb were found to be very high in sector I–9 (Table. 4). It is the main contributing source of pollution in the open water channel. Major cause of water pollution in I –9 is industrialization. Most of the industri es in Pakistan are located in or around the major cities. They dispose their waste effluent directly into the nearby drains, rivers, streams, ponds, ditches and open or agricultural lands (Ullah et al., 2009). Even in the capital city Islamabad there is no proper management of industrial effluents (Mian et al., 1998). In all the sectors population was higher in G –10 and pollution load was higher than the other sectors except sector I –9 which was covered by industrial area. Protecting the water resources in the study area will be a formidable challenge. To control the damage being done to the sources, several steps will be required: First, consumption of water must be decreased until it reaches the sustainable level permitted by the available resources. Achie ving this goal will require more efficient water use by industry, agriculture and area’s domestic population. Second, discharge of wastes into the surface water must be drastically reduced so that the ecosystem’s natural ability to degrade wastes will not be exceeded. Achieving this goal will require modernization of all the industrial and domestic processes that use water, thereby improving the recovery and recycling of waste water encouraging the use of high efficiency toilets to minimize the amount of se wage that is created. Third, additional water treatment facilities must be available and old facilities must be upgraded to increase the capacity. To create more sustainable means of production, there must be a shift in attitudes towards proactive waste ma nagement practices that represent a move away from control measures towards preventive measures in city. -.-.-.- Paper: Hydraulic Modeling for Flood Hazard Assessment and Mitigation Measures - A Case Study Author: M. Mohsin Munir , Engr. Rizwan Maqsood, Engr. Javed Munir, Engr. Tariq Altaf Recommendations: Following measures are recommended in order to minimize sediment entry into the Booni Gol. 1. Provision of check dams/sediment traps at suitable location in upstream catchment reach may reduce debri flow in the nullah. The tentative locations 99 of proposed check dams have been marked using stream network generated from ASTER data. 2. Minimization in exposed soils may cause reduction in debri flow. Exposed soils can be covered which may include top -soiling in conjunction with one or more of the following; seeding, mulching, hydro -seeding, sodding, erosion control blankets, turf reinforcement matting (TRM), riprap, gabion mat, aggregate cover and paving etc. 3. Debri may be controlled in the catchment area by surface roughening (slope texturing). 4. Existing drainage systems must be maintained in a way so that they remain active all -round the season. This may cause reduction in erosion in the catchment. 5. Use of bio -engineering methods may cause reduction in debri flow. T his can be achieved by introducing foilage that decreases impact erosion of rain drops, and increases infiltration of rain into the soil resulting in anchoring of the soil with root systems. As the plants grow, the strength of the bio - engineered erosion co ntrol system strengthens. Typically bio -engineering is used to prevent erosion where there are environmental or aesthetic enhancement requirements; however, if properly selected and implemented, it will provide a simple and cost effective measure for contr olling long -term erosion problems. 6. The debri flow in the catchment may be reduced by the use of Compost blankets (Bio Chemical Material). Compost blankets enhance the soil fertility and improve the vegetation. This will directly reduce the soil erosion. -.-.-.- Paper: Experimentation Study to Investigate the Effect of Green Roof Construction on Indoor Temperature in Local Climatic Conditions Author: Mr. Imran Tariq Recommendations: This research work clearly demonstrates the significance of green roof system in prevailing energy crisis. Green roof system has kept the overall inside temperature peak well below the ambient temperature also green roof has reduced the surface temperature, from where it can be concluded that by constructing green roof system , cooling and heating loads of the building can be reduced significantly. Furthermore, green roof was also helpful in reducing overall surface temperature. The reduced surface temperature will ultimately be helpful in reducing the urban heat island effect if executed at vast scale. Further research should also be carried out to study the effect of intensive and semi -extensive green roofs on indoor and surface temperatures in local environmental conditions. -.-.-.- 100 Paper: Artificial Recharge and IWRM at Community Level – The Balozai Project in Balochistan Author: Dr. Abdul Majid Recommendations: The project activities that have been completed and our experience with the communities have highlighted the importance of taking the communities along all stages of concept clearance, project formulation, project development, project execution, and operat ion and maintenance. In this particular case the community coming from a backward of Balochistan was sensitized fully after a long process of dialogues on the project concept and the benefits that were likely to accrue from the project implementation. As a result the community fully participated in all activities and is sharing the cost of irrigations technology components in cash. This artificial recharge approach is the first of its kind not only in Balochistan but in Pakistan as well. The Water Programm e of IUCN now has made elaborate plans to monitor the impact of the project on the local communities and undertake a number of outreach workshops at the project site in which farmers from other areas with similar problems, policy makers, and water managers would be invited to participate and see the project components. The ultimate aim is to achieve the ends of effective dissemination of the technologies. Initial results during 11 days (15,715 minutes) of test runs in the project area have been very encouraging. A total of about 431,995 gallons was released from the dam in 4 days (5,855 minutes) and allowed to recharge the aquifer. During this period the recharge wells never overflowed which indicates that all water was recharged and shows the water level behavior as recorded from the observation well. It can be seen that the water table started rising in the observation well after 1,335 minutes and continued to rise by 126 cm till 5,755 minutes. The system was closed after 5,855 minutes of running. However, the water table remained stable at the same level for 1500 minutes after closing. The water table started falling after 8,355 minutes. The trend was observed till 15,755 minutes when the overall gain in water level was recorded at 20 cm. It must be rememb ered that during all this period the Karez continued to flow with increasing discharges. It is concluded that the observation well, which is about 100 meters away from the recharge system, recorded the impact after 1335 minutes and thus the average travel speed of groundwater flow was 7.5 cm/minute. Similarly the water table dropped by 106 cm in 7350 minutes or 1.44 cm/minute. It can be seen from the Karez impact figure that flow at daylight point (1280 meters away from system) started showing increase aft er 2725 minutes of system operation when 199,240 gallons of water had been recharged. The discharge increased by 16 gallons/minute after 7,175 minutes of system operation by which time 1,320 minutes had elapsed since the system had been closed. The following recommendations are made: 1. Because of successful demonstration of the technology and its positive results, replication of the technology of artificial recharge be done for all delay action dams in the province so that they become effective once again fo r the purpose they were designed and constructed at huge cost to the provincial exchequer. 101 2. Beneficiary communities can easily share the cost of the artificial recharge system, as it is very cheap. However, technical and financial support can be provided by the government. The project is too young at this stage to carry out an in -depth analysis of impact on poverty. It is recommended that this monitoring be done at least after one year of system running. -.-.-.- Paper: Water Availability and Tragedy of Commons Author: Ms. Ruth Naymat Gill Recommendations: It has been heard many times that in order to solve a problem you need to realize that there is one. Awareness about any issue that is present in the society is the first step towards solving it. Water shapes our environment, affects our society and is the backbone of our economy. Any issues related to water directly affect peoples’ lives in all the three pillars of sustainability. Tragedy of commons is a common issue globally; however, ground water explo itation in Lahore presents a classic example the theory, especially considering the fact that Pakistan is among the top water stressed countries. In order to counter this situation a massive awareness and mobilization campaign is required to make people ac knowledge the problem and take measures to save water and counter water availability issues. Community participation is very crucial for a successful program to carter shared problems like water mismanagement. Communities are major stakeholder of our ground water resources and they should be a part of water governance and policy as without the active participation of members of community, no mutually beneficial strategy can be developed. In order to achieve this, it is required that people are informed of the cause and its implications on their life so that they get to be actively involved in it and contribute their part effectively. -.-.-.- Paper: Climate Change and Poverty Alleviation Author: Prof. Shahida Saleem Recommendations: Climate change is likely to damage more harshly the poor countries of the world than the rich countries which are actually responsible for global warming. Almost all the poor countries of the world are in low latitude with hot and dry climates and are projected to suffer gr eater damages due to global warming than the rich countries which happen to be in the mid to high latitude which are currently cool. High latitude countries of Europe and America are expected to have more rainfall while many sub -tropical and semi -arid regi ons will likely experience less precipitation. Since the low latitude regions are home to the world’s poor, they will suffer most due to climate change and it will be more difficult to eradicate poverty from these regions. The rich countries have a high ad aptive capacity that helps mitigate the outcomes of climate change. Even the most devastating events with substantial impacts have left their infrastructure largely intact. The less developed countries, on the other hand, do 102 not have the necessary infrastr ucture and technology to mitigate the impacts of climate change. Hence the world faces the double irony; countries which contribute least to global warming are both the most impacted and the least able to adapt. The most disturbing finding is that the deve loping countries have also started contributing to greenhouse gas emissions and this could have serious damaging effects on the newly emerging economies. Climate change, therefore, is a major threat to the economies of low and middle income countries along with the challenges of low agricultural productivity, depletion of natural resources, water scarcity and natural disasters. Without mitigating these challenges and adapting to climate change the dream of poverty alleviation cannot be fulfilled. -.-.-.- Paper: Development of Alternative Water Resources in Pakistan: A Review of Rainwater Harvesting Practices Author: Dr. Engr. Abdullah Yasar Recommendations: Major developing countries are water -scared which are distinguished by low rainfall, droughts, dry spells and food insecurity. Rainwater harvesting techniques are easy and simple to establish and operate. Though there are certain factors that can alter the local climatic conditions, rainwater can be a persistent water source. Rainwater harvesting has very few negative environmental impacts. So it is concluded that rain water harvesting offer the best achievable substitute and complementary supplier of water in a condition where presented water supplies are exhausting and be unsuccessful to accomplish the needs of an increasing population. -.-.-.- Paper: Impact of Global Climatic Changes on Sustainable Use of Groundwater in Punjab Author: Ghulam Zakir Hassan Sial, Ghulam Shabir, Saleem Akhtar Recommendations: The climate change poses many positive and negative impacts on groundwater resources; one of the important consequences is bringing about changes in the quality and quantity of the groundwater resources. The recent global warming caused by the increased emissions of GHGs to the atmosphere by anthro pogenic processes, has its effect on continental surface water, oceans, ocean productivity, vegetation, etc. In addition, it has a significant effect on the energy cycle and groundwater. We perceive the immediate climate change effects in terms of floods, drought conditions, glacial melts, etc. The effect of climate change is significantly more on the semiarid, arid and coastal aquifers of the world. In Pakistan, the vulnerability is extremely high because of overexploitation of the groundwater and accompanied land subsidence in urbanized areas. Groundwater is one of the most utilized resources in Pakistan for drinking and irrigation purposes. Due climate change, demand of groundwater has increased for irrigation. More pumpage caused lowering of water table due to which cost of installation and operation of tubewells has increased. The effects of climate change on groundwater resources in our country should be assessed under new environmental condition for better planning 103 and management of this vital resource. -.-.-.- Paper: Environment and Eastern Rivers – Views and Options Author: Engr. Usman-e-Ghani Recommendations: The Indus Waters Treaty 1960 is a unique Treaty as it has divided the rivers between the two countries. Such treaties in general accounts for sharing of the waters. Because of such a mode of sharing, the Eastern Tributaries of the Indus River System have lost the flows even to the extent of the minimum quantum required for sustainability of the ecosystems associated with these river s. Hence, for an effective redressal of the issue, a resort to the various international agreements and the conventions is required to be made which amply recognize the importance of sustainability of the ecosystems and subsequently the whole of global env ironments. The whole of the global environment is being considered as one and single entity for the purpose. If parts of the whole are allowed to sustain damage then a stage may come where the losses may reach to the point of no return; a point where the neglect caused could only be taken as criminal – or else a deceit – to our generations to come. In order to revive and subsequently sustain the ecosystems associated with the Eastern Tributaries of the Indus River System, all these measures are too importan t to be considered and initiated. Side by side, the true implementation of the Indus Waters Treaty 1960, in letter and spirit is also emphasized. Hence, if summarized, perhaps the most rational course of action under the context of environmental sustainability of Eastern Tributaries of the Indus River System, or the important levels, which are required to be pursued in view of various multilateral instruments/approaches readily available at hand, may be seen as shown in the boxes hereunder: IMPORTANT LEVELS – I ▪ Complete implementation of Indus Waters Treaty 1960. ▪ Referral to various conventions on Climate Change, like those under UNECE, UNFCCC, etc. ▪ Resort to various groundwater agreements and conventions on international aquifers. IMPORTANT LEVELS – II ▪ Public awareness campaign (electronic, print and social media and seminars, etc.). ▪ Community participation. ▪ Groundwater resource development projects for the areas under impact (the innovations, conservation, crop pattern changes, etc.). -.-.-.- 104 Paper: Improving Harvested Rain Water Quality of NUST Lakes by Three Stage Portable Water Filter Author: Dr. Muhammad Anwar Baig, Ms. Mehwish Haq Nawaz Recommendations: This study was carried out to find the effectiveness of three stage portable water filter for harvested rain water of lakes. Findings of the present study focused on water samples collected from NUST lakes for improving quality of water showed considerable variation in the physico – chemical and biological parameters of w ater before and after the treatment and especially in dry and wet season. These variations were due to the used coagulation, filtration and chlorination during the treatment process. The temperature of water samples ranged from 21.5 – 22.2°C before treatment which improved 20.8 – 21.5 °C and was within the permissible limit of Pak – EPA. This decrease in temperature was due to the use of mud pitchers for water treatment. Turbidity of l ake water ranged from 1.2 – 2.7 NTU after treatment. It was due to the coagulation, which can successfully remove a large amount of organic compounds, including some dissolved organic material, which is referred to as Natural Organic Matter (NOM) or Dissol ved Organic Carbon (DOC). Coagulation in water treatment involves the addition of chemicals to alter the physical state of dissolved and suspended solids and facilitate their removal by sedimentation (Kimura et al., 2013). As chemical products, coagulants react with the suspended and colloidal particles in the water, causing them to bind together and thus allowing for their removal in the subsequent treatment processes (Jiang and Wang, 2009). The aggregation mechanisms through which particles and colloids a re removed include a combination of charge neutralization, entrapment, adsorption and complexation with coagulant ions into insoluble masses (Ghernaout and Ghernaout, 2012). The larger particles, or floc, are heavy and quickly settle to the bottom of the water system. It can also remove suspended particles, including inorganic precipitates, such as iron. Similarly, water was cleared from colour (35 – 147 TPC) and odour as well because a large amount of DOC Dissolved Organic Carbon) can give water an unpleas ant taste and odour, as well as colour. While coagulation can remove particles and some dissolved matter as TDS were decreased from (125 – 407) to (88 – 315) in the study but the water may still contain pathogens after the coagulation. In an internationa l report published in 1998, it was found that coagulation can only remove between 32 and 87 percent of bacteria. Usually, the pathogens that are removed from the water are removed because they are attached to the dissolved substances that are removed by co agulation. As an integral part of the conventional water treatment scheme, coagulation treatment has been employed to decrease turbidity and colour and to remove pathogens Verma et al., 2012). Coagulation can remove efficiently the hydrophobic and high mol ar mass fractions of NOM (Mao et al., 2013). Moreover, coagulation/flocculation processes have been intensively used for decolorizing wastewater (Verma et al., 2012). Coagulation is often applied to augment biological phosphorous removal in activated slud ge processes (Nguyen et al., 2010). In a current study alum coagulation was proved to be efficient for removing odour, colour and turbidity and decreasing the TDS, hardness and alkalinity of water. Similarly, Christopher et al., 2009 optimized coagulation using aluminium sulfate for the removal of dissolved organic carbon when water quality was pH ranged (6.4 – 8), turbidity was (1.7 – 7.3), colour was in 105 range of (16 – 54) and alkalinity was from 7 – 100. Chao et al., 2007 found that conventional water treatment system was efficient to make the water safe which was having turbidity (4.6 – 8.5), temperature (16.1 – 28.7), pH (7.98 – 8.62), alkalinity (183 – 191). The second step in a water treatment system is filtration, which removes particulate matter from water by forcing the water to pass through porous media. As coagulation does not remove all of the viruses and bacteria in the water, it cannot produce safe drinking water. It is, however, an important primary step in the water treatment process, because coagulation removes many of the particles, such as dissolved organic carbon, that make water difficult to disinfect. Because coagulation removes some of the dissolved substances, less chlorine must be added to disinfect the water. Less chlorination was do ne in treatment process after coagulation and filtration, which removed bacterial contamination from 136×10 3 cfu/ml. Disinfectants could oxidize organic matter, produce disinfection by-products and increase the AOC concentration. Therefore, much attention must be paid to the removal of organic matter before disinfection in order to limit DBP (disinfection by-products) formation and preserve the bio-stability. Moreover, high organic matter concentration results in high chlorine consumption and increased DBP formation (Christopher et al., 2009). The improving efficiency of lakes water by three stage portable water filter was successfully determined by before and after treatment analysis of water. In summer (dry) season water pollution was higher as compared to winter (wet) season. But three stage portable water filter was found efficient to improve the quality of NUST lakes. So rain water harvesting should be in practice to overcome the water shortage in areas like Islamabad, where water shortage becomes the pr ominent problem in summers. And there should be another path for the sewerage water to pass, to avoid the degradation of lakes water quality. And three stage portable water filter should be used which is the combination of (coagulation, filtration and chlo rination) to overcome the shortage of safe water. -.-.-.- 106 Impact of infrastructure development and Pakistan economy – need for prioritization By Agha Adeel Afzal Infrastructure is generally defined to include sectors of transport (road/ rail/ water and airways), water and sanitation, power, telecommunications and irrigation. Studies in this area remain mostly focused on effect of infrastructure development on economic indicators of growth , however, development ultimately must be measured in terms of improvement in quality of life of people. At macro level, better infrastructure increases the productivity of capital both public and private whereas at micro level, it is taken as cause of reduced cost of production thereby increasing profitability, levels of output, labor and income and consequently employment. It also influences service quality in International trade making the work force as well as whole of the economy more efficient. Pakistan, for most of its contemporary history, has heavily focused on the role of transportation and energy infrastructure, and largely ignored the roles of other theories of economic development. Effects of careless planning? These effects can be positive or negative Examples of negative effects ▪ Under investment in sewerage and comparatively over investment in water supply sector can lead to harmful contamination of water reserves. ▪ Over irrigation may lead to negative growth. ▪ Prolonged dependence on biomass fuel in some countries has led to increased erosion and loss of soil fertility. ▪ Poor management of solid waste may cause problems in urban drainage. ▪ Unplanned development and debris accumulation inside channels reserved for flood water escape played havoc by inundating large parcels of land bringing loss of precious lives and properties. Practical Example in Pakistan? Case of construction of High rise buildings in Karachi ▪ “Building plans are being approved without developing civic infrastructure and conducting EIAs. This is a dangerous trend being witnessed in the city,” 107 Director General of the Sindh Environmental Protection Agency (SEPA) had recently told the audience of a seminar. ▪ The Mayor requested the Sindh Chief Minister to stop builders from constructing giant structures across the city. He was of the view that not o nly sewage and water mains were in pathetic condition, but the rest of the city`s infrastructure was in similar condition. ▪ Sindh High Court has imposed a ban on the construction of multi -storey and high-rise buildings till the water shortage in the Karachi city is overcome and new resources of potable water are put in place. ▪ Sindh Building Control Authority (SBCA) has imposed a ban on the construction of multi-storied/high-rise buildings beyond ground plus two storey in the metropolis on May 23, 2017. ▪ Builders are not happy with the situation and according to their version this ban has negatively influenced foreign investments in the country and preventing investments worth Rs 200 billion. Solution Carefully planned investments in water supply and sanitation and power sectors often results in a win -win situation. We need to fully understand interdependence of sectors. Some Important challenges for planners? Climate Change Challenge ▪ Economic growth in Pakistan has averaged 2.6 percent since 1960. In recent years, the rate of growth has been negatively affected first by the 2008 global economic crisis and subsequently by the 2010 floods. The economy has shown resilience despite the heavy cost of the struggle against extremism and terrorism. ▪ Pakistan’s vulnerability to climate risk has been amply demonstrated in recent years by the 1999 to 2002 drought, 2007 storm surges generated by Cyclone Yemyin, and the 2010 floods that affected one-fifth of the country and an estimated 21 million people. In response, Pakistan’s 2013 National Climate Change Plan (NCCP) identifies adaptation as “the focus of this policy”. A Framework for Action on Climate Change to support implementation of the NCCP is under preparation. Social Challenge ▪ Poverty rates remains high in Pakistan , where 32.5 percent of the population lives below the poverty line. Factors such as a rise in the number of internally displaced individuals, greater inequality, slow improvement in access to drinking water, and spending cuts in social programs. ▪ Pakistan’s youth, between the ages of 15 -24, are lagging behind their counterparts in much of South Asia. Primary education enrolment rates are 108 high, but only 34 percent of students enter secondary school and 5.4 percent into post -secondary institutions. An estima ted 55 percent of individuals 15 years and older are literate. ▪ The health sector faces significant challenges. On a positive note, under -five mortality and infant rates have declined along with maternal mortality ratio, however mortality rates are still hi gh and life expectancy for Pakistanis in 2012 was 65.7 years. 70 children out of 1,000 die before reaching the age of five. ▪ Medical attention is generally lacking in Pakistan, where there are 0.8 physicians per 1,000 people. Environmental Challenges Pakistan faces a number of significant environmental challenges, particularly due to the degradation of natural resources and pollution (especially in urban areas). ▪ A high rate of deforestation has left the country with only 4.8 percent forest cover. ▪ Waterlogging is a significant problem in the low-lying areas of Sindh. ▪ Coastal mangrove systems are degraded by reduced freshwater inflows, higher sediment loads, influx of invasive species, and pollution. ▪ Weak enforcement of environmental regulations contribut es to these concerns. Overall, it is estimated that environmental degradation costs Pakistan the equivalent of 6 percent of GDP per year. ▪ Climate hazards in Pakistan include flooding along the Indus River, particularly in July and August due to heavy monso on rains. Low -lying plains of Sindh and Baluchistan get affected by cyclones. ▪ Due to Climate change mean annual temperatures in Pakistan increased by 0.57°C in the 20th century; and this warming trend has accelerated in recent years. Concurrently, mean annual precipitation levels increased by 25 percent between 1901 and 2000 for all of Pakistan. However, rainfall in the southern arid plains and along the coast has decreased by 10 to 15 percent since 1960, while wetter areas in the north have received more p recipitation than the national mean. Global warming has caused sea levels to rise by about 1.2mm per year in recent decades projected to continue into the future. Water scarcity ▪ Mainly as a result of rapid population growth, surface and ground water availability per head is low and decreasing in Pakistan. Agriculture production is directly affected by decreasing and more erratic water supply, salt water intrusion and rising temperatures. Climate change impacts on water will mainly be felt as precipitation b ecomes more erratic. Also volume of water generated by glacial melt is altered. As a result, both floods and droughts are expected to become more frequent and intense. A continued decline in surface and ground water availability in southern Pakistan will h ave negative consequences for agriculture production, urban water supplies, and wetland and mangrove ecosystems. 109 ▪ More erratic water supply, which could affect hydropower production and the cooling facilities of thermal plants. Extreme events could increase sedimentation of reservoirs and thus reduce the capacity of hydropower dams. As well, sea level rise and increased cyclonic activity could put coastal energy infrastructure at risk. Climate change could also increase the demand for energy by, for example, increasing the need for air conditioning and water pumps. ▪ Much of the country’s population and economic assets are concentrated on the coast, which is increasingly affected by sea level rise, salt water intrusion and possibly by higher cyclonic activity. Multiple industries in this region are at risk, including energy, manufacturing, agriculture, fisheries and tourism. Forests and other ecosystems are also sensitive to climate change, as is human health, which could among other things be affected by expand ing vector-borne diseases and heat stress. However, there is currently little detailed knowledge about the exact nature and possible extent of these impacts due to the general absence of comprehensive vulnerability assessments in Pakistan. Energy Challenge ▪ At present, Pakistan is short of up to 5000 Megawatts of electricity, 30% of the population have no access to electricity, while 80% have no access to piped gas. The resulting load management practices are estimated to incur a cost of $5.8 billion to the different sectors of the economy and the loss of 400,000 jobs. Shortage in energy supply is a key constraint, along with issues of inefficient use of energy, finance, institutional coordination, and industrial vision, which has made a number of productive activities uncompetitive in domestic and international markets leading to shutting down of SMEs and relocation of industrial plants to other countries. ▪ Pakistan, as of June 2013, currently possessed a capacity to produce 22,812 MW to fully meet the nation’s needs of 19,000 MW but problems with distributing that power through the electrical grid and power generation itself has reduced the supply to only 14,000 MW. Within the CPEC budget, $11 billion is dedicated to the construction of ports, railways, and roads with the remaining amount to be dedicated for the construction of power plants. ▪ In essence, the budget for CPEC allocates 25% of its resources to projects based on transportation infrastructure and 75% of the budget on projects aimed at power generation. Under current plans for CPEC, there are a total number of 24 power projects either planned, under construction, or completed. This is a cause of concern as Pakistan will now have an even greater excess power generation capacity with little mention regarding improvements to the electrical grid system. As of now, it is reported that Chinese companies will build the nation’s first high voltage line, a 4000 MW transmission line, from the district of Matiari in Sindh to the city of Lahore in Punjab. ▪ Severe shortage of electricity in the country has increased the current market demand for solar panels from 350 megawatts (MW) per year in 2013 to approximately 1500 MW in 2017. 110 Infrastructure Development Priorities and Alternatives? Key suggestions ▪ Policy makers should be free of political compulsions and development should strictly be in public interest. ▪ Instead of complete reliance on traditional project feasibility techniques such as cost benefit ratio, internal rate of returns etc. needs of peop le should be assessed through surveys by honest and dedicated teams of professionals and social workers for all sectors of growth with a system of rating. ▪ Once identification of projects is complete a 3 -5 year prioritized ‘Rolling Plan’ should be prepared. ▪ Resource allocation should not ignore any sector of growth. ▪ Institutions for “Infrastructure Development Fund” to raise funds through bond issues, Government transfers and external donor support should be strengthened. ▪ Before preparation of PC -Is, tec hnology options should be fully examined along-with carrying out the preliminary design after feasibility study. ▪ National Climate Change Plan should be comprehensive to cover both short term and long term objectives. ▪ Women empowerment schemes need to be encouraged in poverty alleviation programs. ▪ At present Tax to GDP ratio is only 10% in Pakistan and needs to be increased manifold. ▪ The increasing urban population requires a strategy to improve competitiveness by expansion of urban city markets, promotion of cluster development, improvement in urban governance, skill development and autonomous local government. ▪ In most developing economic contribution by Small and Medium Enterprises (SMEs) in terms of employment is more as compared to the developed countries whereas in Pakistan only 7% bank loans are for SMEs. There is need to examine the dynamics, contributions, constraints and opportunities for SMEs in Pakistan. ▪ Development of IT Sector is direly needed for earning foreign exchange through Software exports. ▪ Development of housing facilities and investment opportunities for oversees Pakistanis for increased home remittances. 111 ▪ Mix of Energy projects should be in favor of lesser cost projects (hydro energy projects). Renewable energy projects should also get p riority especially solar projects being getting cheaper with time. Also transmission line projects need to be taken up on priority for evacuation of power. ▪ Where feasible participatory projects involving social mobilization should be undertaken. ▪ Goal, criteria, sub -criteria and alternatives should form basis of prioritization within renewable energy projects of wind energy, solar photovoltaic, solar thermal and biomass energy. Besides ranking and prioritizing of these technologies, results of the proposed d ecision model can also be used for the development of long -term renewable energy policy and energy roadmap for the country. References: - The contributions of Infrastructure to Economic Development - World Bank discussion paper No 213 by Christine Kessides. - Identifying Priority Adaptation Actions in Pakistan: A Situation Analysis Jo-Ellen Parry, Marius Keller and Deborah Murphy, IISD July 2013 published by The International Institute for Sustainable Development (IISD) Canada . 112 PROGRESS, RISKS AND PROBLEMS IN THE DEVELOPMENT OF SMALL HYDROPOWER IN PUNJAB PAKISTAN by Dr Engr Mazhar Hussain Mahu1 ABSTRACT Punjab’s irrigation system can be effectively harnessed to generate cheap hydel electricity. The Punjab Power Development Board (PPDB) was created for the promotion of hydropower generation in the Punjab province. About 600 potential sites at different river falls, canals and barrages, with medium and low head and high discharge, having a total capacity of more than 800 MW have been identified. Feasibility studies for 10 hydel projects of cumulative 204 MW capacity have been conducted while 11projects are i n progress with total capacity of 118MW. The 135 MW Taunsa Hydro power project is at advance stage being developed in private sector on BOOT model as per Punjab Power Generation Policy 2009. Yet, nothing physical on ground has been started towards developm ent of small hydroelectric power projects in private sector besides sincere and concerted efforts. The development of hydropower is considered a key factor for future progress. Small hydro development has been taking place steadily since a long time. The s etting of low head hydroelectric schemes on large irrigation canals offer a good scope to utilize the falls. The present paper highlights the experience and progress of development of hydel projects in Punjab and pin points the risks and problems for its development by the Government with its own resources and also through private investment. Punjab government needs to take stock of the situation, executing the identified projects speedily to meet its political agenda of improving the socio - economic conditions. 1 INTRODUCTION Energy is one of the key factors for the development of national economics in Pakistan. Energy sources are divided into two main types; conventional energy (biomass, petroleum products, and electricity); and non -conventional energy (so lar, wind, hydro, etc.). Punjab consumes 67% of the total electricity generation in Pakistan. Energy is an important need of Punjab’s economy. The sector has a direct impact on GDP growth and per capita income. All economic sectors are directly dependent u pon the availability of energy in the form of power or fuel. Punjab Irrigation Canal System is the world’s largest contiguous 14,820 km long canal system. Punjab has over 600 low hydropower sites mostly under 50MW with a cumulative generation potential of over 600 MW on canals and barrages. Others big size hydropower projects are also available, especially 135 MW Taunsa Hydropower Project. The theoretical power of a hydro source is the product of the weight of water passing the unit time and the vertical he ight through which it falls, under average flow conditions. Turbines and generator both have efficiencies of over 90%. Therefore a modern hydroelectric station can convert over 80% of energy inherent in water into electricity. In Pakistan, most of hydel energy is from large scale schemes of more than about 10 1 Director Hydropower, Punjab Power Development Board (PPDB), Energy department, Government of the Punjab 113 MW. However, many of these large hydel schemes were developed in a number of years ago, and the potential for identifying new large hydel schemes is now more limited, not only because there are fewer c ommercially attractive sites still available, but also because of environmental constraints. Table No 1: Status of hydel projects resource with PPDB (Private mode) Source Available Hydro Potential (MW) in Punjab Proposed Capacity of Projects (MW) undertaken by PPDB Canals 375 77 Rivers 325 192 Streams 35 35 Total 835 304 The Table -1 above indicates the status of small hydel power resource in Punjab. As a whole 36% proposed capacity of hydel projects have been under taken by PPDB till now. The small hydel projects of less than about 10 -15MW now offer a greater opportunity for providing reliable, flexible and cost competitive power source with minimal environmental impacts. Small hydro power generation is now a well - established technology. Small hydro power schemes are designed to offer power generation with high levels of a vailability over a long operating life. Civil engineering works (weirs, channels) can last for many years with suitable maintenance, and the mechanical and electrical lifetime of a hydro power plant can be up to 50 years. Small hydro schemes are character ized by relatively high initial capital outlay. However, these high initial costs are offset by the long life time of the scheme, its high reliability and availability, low running costs and the absence of annual fuel costs. Capital costs can often be redu ced by making use of existing engineering structures or by refurbishing existing plant and equipment. The cost of generating power from small hydro schemes depends on the characteristics of the site, and in particular the height of the hydraulic head, such that the scheme’s economic viability decreases as the head decreases. In certain locations, however, even very small hydro schemes can be developed to provide an economic source of power. 2 SALIENT FEATURES OF THE PUNJAB POWER POLICY (2009) Punjab Power Generation Policy 2006 (Revised 2009) provides adequate framework for the development of power sector in public and private sector. Punjab Power Development Board (PPDB) provides one window facility in this sector. Punjab Power Development Company -a Governm ent sector corporate entity is also established to implement power projects in public as well as public -private- partnership mode. Investors are invited to participate in the development of power generation projects based on any type of technology. • The Policy is applicable for the development of all types of technologies such as Hydel, Coal, Biomass, Solar and Wind, etc. • Projects may be developed on raw sites and where feasibility study is not available. • Concessions in duties/tax regime announced by Government of Pakistan are applicable for projects developed under the Policy. 114 • Standard format of Power Purchase Agreement (PPA), Implementation Agreement (IA) and Water Usage Agreement (WUA) are available. • Capacity payment charges (CPP) up to 90% for hydel projects. • Water use charges @Rs.0.42/Kwh are payable on the actual energy generated. • Dispersal of power is allowed in 3 modes: (i) Sale to utility company (WAPDA/DISCO), (ii) Sale to local area by establishing distribution network, (iii) Sale to dedicated industry (Self Utilization) • Use of Government land is allowed in two modes: (i) Lease. (ii) Equivalent Equity participation. • Projects may be developed in private Sector/JV mode. • Mode of investment for Hydropower project is normally “Build, Own, Operate and Transfer basis (BOOT) with concession period of 30 Years. 3 PROJECT PROCESSING FEATURES The Punjab Power Generation Policy, 2006 envisages entertaining un -solicited and solicited proposals. Punjab Power Generation Policy 2009 allows development of projects in raw site and solicited modes. The raw site projects are green field projects for which feasibility studies are conducted by the Sponsors at their own risk and cost after award of the pr oject. The solicited projects are the ones which are offered for investment after conduct of feasibility study. 3.1 UN-SOLICITED (RAW SITES) • The proposal for which feasibility studies are not available could be developed for Power Generation and are classified as unsolicited proposal/raw sites. • The process includes invitation of expression of interest through press, registration and pre-qualification. The highest ranking sponsor is issued Letter of Interest (LOI) authorized to carry out feasibility studies within 9-12 months. • Tariff will be negotiated between sponsor and power purchaser and approved by NEPRA. • Letter of Support (LOS) will be issued for a period of twelve months to execute agreement (IA, PPA and WUA) and to achieve financial close. 3.2 SOLICITED PROPOSAL • Proposals will be solicited from investors for project for which feasibility is available. • Process of selection involves invitation of competitive bidding through electronic and print media. • Competitive bidding process will involve pre-qualification, issuance of RFP, bidding, evaluation and award. • Lowest bidder in terms of tariff is selected, who will get tariff approved from NEPRA. • Letter of Support (LOS) will be issued for a period of twelve months to execute agreement (IA, PPA and WUA) and to achieve financial close. 4 FISCAL AND FINANCIAL INCENTIVES 115 Power generation companies are allowed to import plants and equipment @ 5% duty. Other incentives include income tax exemption for life; full repatriation of profit plus investment; international arbitration awards enforceable under law; hydrological risks borne by the government; an attractive ROE, guaranteed net taxes as per Government of Pakistan Power Generation Policy - 2015. The power will be purchased by the National Transmiss ion & Dispatch Company (NTDC) and/or respective distribution company. For evacuation of power, the transmission line from the company’s outgoing gantry will be constructed by the concerned power purchaser. 5 SMALL HYDRO POWER DEVELOPMENT IN PUNJAB Punjab’s canal system has potential of 800 MW small hydel projects with total number of sites as 600. The sites identified varies in capacity and they are located in the varied geographical regions of the Punjab province. Since hydel projects are at differing capacities and varied hydrology, the hydel sites also have a varied range of unit energy generation costs. 5.1 PROJECTS WITH FEASIBILITY STUDIES COMPLETED IN PRIVATE INVESTMENT Under private investment, the projects are divided in to three categories. a. Hydal projects on rivers falls b. Hydal projects on natural streams falls c. Hydal projects on canal falls Following three (3) hydropower projects on river falls sites at barrages are at different stages of development: • 135 MW Taunsa Hydropower Project on River Indus at Taunsa Barrage on right side, District Muzaffargarh • 20 MW Marala Hydropower Project on River Chenab at Marala Barrage on right side, District Sialkot • 18MW Rasul HPP, Rasul Barrage, District Mandi Baha-Ud-Din Following two (2) hydropower proj ects on natural streams sites are at different stages of development: • 10MW Murree Hydropower Project on Jhelum Tributary, District Rawalpindi • 25MW Soan Hydropower Project on River Soan Tributary, District Following fifteen (15) hydropower projects on canals falls are at different stages of development: • 25MW C.J. Link Tail Canal Fall, (RD. 316+622), District Khushab • 1.8MW Jhang Branch Canal (RD. 0+000 to 69+000), District Hafizabad • 4.6MW Lower Bari Doab Canal, RD. 260+000, District Sahiwal • 3.6MW Upper Gugera Branch Canal, RD. 216 +100 to RD. 220 + 750, District Nankana • 10.49MW B.S. Link-I Canal HPP, RD. 106+250, District Kasur • 7.5MW Lower Chenab Canal (LCC) HPP, RD. 0 + 000, District Gujranwala • 5.2MW Lower Jhelum Feeder Canal HPP, RD. 8+626, District Man di Baha - Ud-Din • 1.8MW LBDC HPP, RD. 489 + 000, District Sahiwal 116 • 2.8MW Khokhra HPP, Gujrat Branch Canal, RD 0+000 to 2+000, District Gujrat • 1.8MW Pakpattan Canal HPP, RD. 306+000, District Pakpattan • 1.8MW Lower Bari Doab Canal (LBDC) HPP, RD. 602+000, District Khanewal • 2.0MW BRBD Link Canal HPP, RD. 0+000, District Sialkot • 2.54MW BRBD Link Canal HPP, RD. 509+712, District Kasur • 7.10MW D.G. Khan Link – III Canal HPP, RD. 0+000 to RD. 14+000, District DG Khan The up to date status of each project is elaborated in the following sections; 5.1.1 135MW TAUNSA HYDROPOWER PROJECT The 135 MW Taunsa HPP being the largest hydropower project in Punjab taken up by Punjab Energy Department, is under the advanced stage of the development, for which six (6) eminent Chin ese’s power development companies have been pre - qualified for Bidding. The project is environment friendly and clean energy. Feasibility Studies and physical Hydraulic Model testing of the proposed plant have been carried out by CWE China and updated by th e Consultant i.e. M/s NESPAK. Photo No.1 shows layout plan and Photo No.2 depicts isometric view of 135 MW Taunsa Hydropower Project. National Electric Power Regulatory Authority (NEPRA) has approved the Request for Proposal (RFP) for invitation of Bids. T he Expression of Interest (EOI) was invited for Prequalification of Sponsors in November, 2016. Resultantly, six (6) Chinese Sponsors have been prequalified and provided with NEPRA’s approved RFP for bidding purpose on the basis of lowest levelized Tariff under NEPRA’s Tariff Regulations CBTR -2014 with a bench mark tariff. NEPRA’s approved RFP was issued to the Sponsors for reverse bidding on the following benchmark Tariff: • Rs. 10.4658/KWh (10.3622 cents/KWh) on Foreign Financing • Rs. 12.2938/KWh (12.1721 cents/KWh) on Local Financing • Pro rata of above two on mixed Financing The prequalified Sponsors are: (1) China Three Gorges South Asia Investment Ltd. (CSAIL), (2) Power China Resources Ltd. (PCR -Sino Hydro), (3) China National Electric Engineering Co., Ltd. (CNEEC), (4) China Gezhuba Group Company Limited (CGGC), (5) Harbin Electric International Company Ltd. (HEIC) and (6) China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co., Ltd. (GHCB) / SINOTECH. The last date for Bid submission was 26th April 2017. M/s FICHTNER GmbH & Co. KG was appointed as the Consultant for Bids evaluation. The technical and financial bids have been opened and are being evaluated. The Bid Evaluation Report shall be submitted to NEPRA by end -September for declaring the Successful Sponsor. 117 Photo No 1: Layout plan of 135 MW Taunsa Hydropower Project Photo No 2: Isometric view of 135 MW Taunsa Hydropower Project The salient features of the project are as under: • Project Type Hydroelectric / Run of the River • Installed Capacity 135 MW • Bulb Turbines 9 x 15 MW • Rated Head 5.8 m • Design Discharge 3155.5 m3/sec • Mean Annual Energy 650.89 GWh • Plant Factor 54.04% 118 • Project Investment Cost US $ 450 Million • EIRR 19.25% • FIRR 18.72% • Benefit to Cost Ratio 1.72 5.1.2 20 MW Marala Hydropower Project The 20 MW Marala Hydropower Project lies on River Chenab at Marala Barrage on right side, District Sialkot. Feasibility Tariff is approved by NEPRA. Gazette Notification by Ministry of Water Power is awaited. Documentation for tripartite Letter of support (LOS) is in process. 5.1.3 18MW Rasul Barrage Hydropower Project The 18MW Rasul HPP lies on right side of Rasul Barrage in District Mandi Baha -Ud- Din. The Panel of Experts ( POEs) has approved the Feasibility Study Report as per Policy. The interconnection study has been approved by the distribution company, GEPCO. The NOC from environmental department has also been taken. The sponsor is now preparing petition for getting generation license from NERPA. 5.1.4 10MW Murree Hydropower Project The 10MW Murree Hydropower Project lies on Jhelum Tributary, adjoining the area of Kohala Bridge in District Rawalpindi. The Feasibility study is in progress. 5.1.5 25MW Soan Hydropower Project The 25MW Soan Hydropower Project lies on River Soan and its adjoining Tributaries in District Attock. The Feasibility study is in progress. 5.1.6 25MW C.J. Link Tail Canal Fall Hydropower Project The 25MW C.J. Link hydel project lies at Tail Canal Fall , (RD. 316+622), in District Khushab. The LOI was issued with 44MW Capacity initially. The project capacity is reduced to 25MW after effects of Mangla raising. The Generation License is withheld by NEPRA. Sponsor has submitted the revised Feasibility Study Report to NEPRA, as per NEPRA's direction of incorporating effects of post Mangla Raising. 5.1.7 1.8MW Jhang Branch Canal Hydropower Project The 1.8MW hydel project lies on Jhang Branch Canal between RD. 0+000 to 69+000 in District Hafizabad. The Upfront Tariff has been approved by NEPRA. The Gazette Notification by Ministry of Water and Power is awaited. Documentation for tripartite Letter of support (LOS) is in process. 5.1.8 4.6MW Lower Bari Doab Canal Hydropower Project The 4.6MW hydel project lies at RD. 260+000 on Lower Bari Doab Canal in District Sahiwal. The Upfront Tariff has been approved by NEPRA. The Gazette Notification by Ministry of Water and Power is awaited. Documentation for tripartite Letter of support (LOS) is in process. 5.1.9 3.6MW Upper Gugera Branch Canal Hydropower Project The 3.6MW hydel project lies at RD. 216 + 100 to RD. 220 + 750 on Upper Gugera Branch Canal in District Nankana. The Feasibility Study has been approved. Generation License is granted by NEPRA on 31.07.2017. Consen t for Power Acquisition has also been given by LESCO and the same is awaited from CPPA (G), which is a pre -requisite for processing of upfront Tariff petition. Land Acquisition 119 process has been initiated. 5.1.10 10.49W B.S. Link-I Canal Hydropower Project The 10.49W hydel project lies at RD. 106+250 on B.S. Link -I Canal HPP in District Kasur. Feasibility Study has been approved. Sponsor has submitted application for Generation License in NEPRA. Consent for Power Acquisition has also been given by LESCO and the same is awaited from CPPA (G), which is a pre -requisite for processing of upfront Tariff petition. 5.1.11 7.5MW Lower Chenab Canal (LCC) Hydropower Project The 7.5MW hydel project lies at RD. 0 + 000 on Lower Chenab Canal (LCC) in District Gujranwala. Feasibility Study has been approved. Sponsor has submitted application of GL to NEPRA. The Consent for Power Acquisition is awaited from GEPCO and CPPA (G) is awaited, which is a pre -requisite for processing of upfront Tariff petition. 5.1.12 5.2MW Lower Jhelum Feeder Canal Hydropower Project The 5.2MW hydel project lies at RD. RD. 8+626, on Lower Jhelum Feeder Canal in District Mandi Baha -Ud-Din. Feasibility Study has been approved. GL has been issued by NEPRA on 23.08.2017. Consent for Power Acquisition has been received from GEPCO but from CPPA (G), it is awaited, which is a pre -requisite for processing of upfront Tariff petition. The Sponsor has initiated land acquisition process. 5.1.13 1.8MW LBDC Hydropower Project The 1.8MW hydel project lies at RD. 489 + 000 on Lower Bari Doab Canal (LBDC) in District Sahiwal. The revised draft of FSR was conditionally approved by POE on 08.03.2017 subject to submission of approvals of IEE and Interconnection Study (IS) from EPA and MEPCO respectively. 5.1.14 2.8MW Khokhra Hydropower Project The 2.8MW Khokhra hydel project lies at RD 0+000 to 2+000 on Gujrat Branch Canal in District Gujrat. The feasibility study has been approved. The application of GL is submitted to NEPRA. Consent for Power Acquisition has been given by GEPCO but from CPPA (G), it is awaited, which is a pre -requisite for processing of upfront Tariff petition. 5.1.15 1.8MW Pakpattan Canal Hydropower Project The 1.8MW hydel project lies at RD. 306+000 on Pakpattan Canal in District Pakpattan. The Feasibility study is in progress. 5.1.16 1.8MW Lower Bari Doab Canal (LBDC) Hydropower Project The 1.8MW hydel project lies at RD. 602+000 on Lower Bari Doab Canal (LBDC) in District Khanewal. The Feasibility study is in progress. 5.1.17 2.0MW BRBD Link Canal Hydropower Project The 2.0MW hydel project lies at RD. 0+000 on BRBD Link Canal in District Sialkot. The Feasibility study is in progress. 5.1.17 2.54MW BRBD Link Canal Hydropower Project The 2.54MW hydel project lies at RD. 509+712 on BRBD Link Canal in District 120 Kasur. The feasibility study has been conditionally approved by POE subject to approval of IEE and Interconnection Study (IS) from EPA and LESCO. Sponsor has obtained both approvals and now preparing petition for getting GL from NEPRA. 5.1.18 7.10MW D.G. Khan Link – III Can al HPP, RD. 0+000 to RD. 14+000, District DG Khan The 7.10MW hydel project lies at RD. 0+000 to RD. 14+000 on D.G. Khan Link – III Canal in District DG Khan. The Feasibility study is in progress. 6 PROJECTS IMPLEMENTED IN PUBLIC SECTOR Following four projects are being executed in Public sector to serve as model or pilot projects by Punjab Energy Department. These 4 SHP Projects of 20 MW capacity are being undertaken in Punjab under the ADB REDSIP. (i) 7.64MW Marala Hydropower project (ii) 5.38MW Chianwali Hydropower project (iii) 4.04MW Deg outfall Hydropower project (iv) 2.82MW Pakpatten Hydropower project The back ground details about all above four projects are referred in my Pakistan Engineering Congress papers as refereed at serial no 1, 2 and 3 at the end. The details of Technical Parameters of hydel projects under Public mode are given in Table-2. Table No 2: Details of Technical Parameters of hydel projects under Public mode The up to date status of these four projects is as under: 6.1 Marala Hydropower project The achieved physical progress of Marala HPP is 99%. The transmission line is completed by GEPCO as sub -contractor. It is a 3 - circuits and 1.68 km long. The Commercial Operation date (COD) is expected before December 2017 if special 121 closure of Upper Chenab Canal is given by Irrigation Department. The dry testing of E&M equipment has been completed. The details of progress of different activities is depicted in Table-3. Pictorial view of different activities is shown in Photos no. 3 to 5. Table No 3: Details of different activities at Marala HPP Photo No 3: Downstream View of Marala Hydropower Project 122 Photo No 4: View of Machine Hall of Marala Hydropower Project Photo No.5: Downstream view of spillway of Marala Hydropower Project 6.2 Chianwali Hydropower project The achieved physical progress of Chianwali HPP is 80%. Erection of Poles is in progress by GEPCO, for 2- circuits, 2.11 km long transmission line. The Commercial Operation date (COD) is expected in March 2018. The details of progress of different activities is depicted in Table -4. Pictorial view of different activities is shown in Photos no. 6 to 8. The dry testing of E&M equipment is completed. 123 Table No 4: Details of different activities at Chianwali HPP Photo No 6: View of Power House of Chianwali Hydropower Project 124 Photo No 7: View of Machine Hall of Chianwali Hydropower Project Photo No 8: View of Machine Hall of Chianwali Hydropower Project 6.3 Deg outfall Hydropower project The Deg Outfall HPP is nearly completed. The work was suspended due to settled spillway on February 17, 2017. After annual closure 2017, the canal water was diverted towards the spillway / Powerhouse of the project through a bypass arrangement. The canal water reached the Deg project site on 02-02-2017. On 17-2- 125 2017, an abnormal pattern of water flow was observed at the spillway structure and the structure along with Service Bridge was settled. Resultantly, the EPC/ turnkey contractor requested for immediat e closure of UCC. Accordingly this request was placed before the Irrigation Department and they started reducing the canal flows from its source, i.e., Marala Head works, 127 Km from this site. The contractor mobilized his resources at site to counter this situation. The water was diverted through the original canal route. The water flow of Mangtawala Feeder was restored through its original course. The project is still under construction phase and the site as well as all the machinery and equipment are sti ll in the care and custody of the Contractor. Keeping in view the sad incident of DHPP, Contractor has also diverted the canal water to the old course of UCC at CHPP because of its same design as that of DHPP and no water is passing through the spillway of CHPP. Contractor has submitted two options for reconstruction of Spillway (a) at its original location and (b) in the prism of U.C.C. The Contractor has been asked to give his preferred option. In a meeting with Consultants, the Contractor has now indica ted option (b) as his first preference and has promised to provide a conceptual proposal in couple of days. Final design will be reviewed by the Project Management Consultants after consultation with Irrigation Research Institute (IRI). The achieved physic al progress of Deg Outfall HPP is 90%. But due to collapse of spillway, the progress is reduced to 80%. The erection of poles is completed by GEPCO, for 2 - circuits, 2.11 km long transmission line. The Commercial Operation date (COD) is expected in March 2 018. The dry testing of E&M equipment is completed. The details of progress of different activities is depicted in Table -5. Pictorial view of different activities is shown in Photos no. 9 to 11. Table No 5: Details of different activities at Deg Outfall HPP 126 Photo No 9: View of Power House and Spillway of Deg Outfall Hydropower Project Photo No 10: Downstream View of Power House of Deg Outfall Hydropower Project 127 Photo No 11: View of Machine Hall of Deg Outfall Hydropower Project 6.4 2.82MW Pakpatten Hydropower project The achieved physical progress of Pakpatten HPP is 100%. The Commercial Operation Date (COD) has been achieved in March 2017. The details of progress of different activities is depicted in Table -6. Pictorial view of completed P akpatten HPP is shown in Photos no. 12 to 17. Table No 6: Details of different activities at Pakpatten HPP 128 Photo no. 12: Exterior View of completed 2.82 MW Pakpattan HPP Photo # 13: View of Tail race of 2.82MWPakpatten HPP 129 Photo # 14: View of Machine Hall of 2.82MW Pakpatten HPP Photo # 15: View of Control Panels of 2.82MW Pakpatten HPP 130 Photo # 16: View of Over Head Crane of 2.82MW Pakpatten HPP Photo # 17: View of SCADA System of 2.82MW Pakpatten HPP 7 RISKS • Development of small hydel projects in IPP mode in Punjab are first time being taken up in hand and encouraged to local as well foreign investors. • The projects are being developed on barrages and canals. Hydrological risk at barrages is higher in comparison to perennial canals. 131 • Main risk is the arrangement of debt as banks are afraid of circular debt and decline to provide debt for development of hy del projects. Therefore, projects did not mature. • Competency of Consultants and Contractor to design, construct such projects is also compromised one. 8 PROBLEMS • Tariff determination has been approved by the Regulator for the three (3) Hydropower Projects and submitted the same to Ministry of Water & Power (MoWP). These three projects are (a) 20MW Lucky Hydropower Project on Marala Barrage dated April 06, 2016, (b) 1.8MW Alka Hydropower Project on Jhang Branch Canal dated May 09, 2016, (c) 4.6 MW Ravi Hydro power Project on LBDC dated February 14, 2017 • Issuance of Gazette Notifications of NEPRA ’s determination is held up with MoWP and the Sponsors are facing difficulty for achievement of Financial Close. • For option of upfront hydel power Tariff by the IPPs of small hydropower projects up to 25 MW, the Sponsors are required to produce Power Acquisition Request (PAR) from respective DISCOs and / or CPPA (G) as a pre-requisite. The Sponsors are experiencing difficulty for obtaining such consent. Certain projects are indicated as reference; (a) 10.49 MW HPP at Balloki Sulemanki Link-I, (b) 3.6 MW HPP on Upper Gugera Branch Canal, (d) 7.55 MW HPP on Lower Chenab Canal, (e) 2.8 MW HPP on Gujrat Branch Canal. • In Punjab, the hydel sites have a head in the range of one to three meters. For this there is no need of installing conventional machines units. 9 CONCLUSIONS AND RECOMMENDATIONS • Till now Punjab has utilized 36% hydel reso urces out of 800 MW. It is dire need to develop remaining hydel resource s without further los s of time being cheap and clean hydel energy. • Four hydel projects (4) on different canals in Punjab with total capacity of 20MW are developed by the Punjab government through foreign funding. Taunsa Hydropower Project having 135 MW capacity is being also d eveloped on river Indus at Taunsa barrage on its right side through private sector on BOOT bases. Bankable feasibility studies have been prepared for some small hydel projects too. Private sector has to be invited to develop these solicited projects on bui ld-own-operate-transfer (BOOT) basis. It is important to promote hydel generation and utilize hydel resources in Punjab fully that the hydel projects can be allocated on minimum levelised tariff through competitive bidding, in accordance with the provisions of the policy. • It is important to promote small hydro power in Punjab through a program of technology demonstration projects, market enablement, resource assessment and work to address non -technical issues, such as environmental issues and planning. • The best way to promote energy security and help nations develop, while protecting the environment and improving public health is to promote clean and affordable energy hydro technologies. A diversified approach is required that include conventional, advance and renewable energy and energy efficiency technologies. 132 • To develop a hydropower project, it is vitally important to conduct proper and quality feasibility study by selecting quality Consultants. • Private Sponsors feel that the procedural requirements are lengthy and hectic. Getting “No Objection Certificates”, (NOCs) from parent Government’s Departments involves too much time, delays are not in days, not in weeks, but in many months, even take a year, even more. Ultimately international as well as local in vestors lose their interest. The Governments as well as the Sponsors are indifferent to the opportunity cost the nation has to pay heavily in case of long delays in implementation of these hydel projects. 10 REFERENCES 1. “Water Power from Canals Falls in Punjab Pakistan”, Engineering News, Vol. 46 Issue no.3 July – Sep 2015, page 44 to 58, Pakistan Engineering Congress, Pakistan. 2. “Development of low head hydropower projects on canals in Punjab Pakistan (1912-2012), Pakistan Engineering Congress, Paper no. 719, page 251-266. 3. “Lessons from hydropower failures in Pakistan ”, page 66 to 71, Engineering News, Vol. 47 Issue no.1 -4, January 2016 –December 2016, Pakistan Engineering Congress, Pakistan. 133 Technical Lecture SATELLITE TECHNOLOGY AND APPLICATIONS by Engr. Raheem Sanaullah Choudhry held on July 22, 2017 Technical Lecture by Engr. Raheem Sanaullah Choudhry was held on 22 nd July, 2017 by Pakistan Engineering Congress at Mashhadi Hall, (4th Floor), PEC Building, 97-A/D-1, Liberty Market, Gulberg III Lahore. He has distinguished educational and professional career with More than twenty-one (21) years of experience in the field of Electronics, Telecommunications and Space technology. He has made invaluable contributions towards the development and progress of Pakistan's National Space Programme. Outline ➢ Overview  Orbits  Satellite  Launch Vehicle  Ground Segment ➢ Satellite Applications ➢ Satellite Development ➢ Satellite core Technologies development & trends ➢ Satellite Technology transformation trends “Whereas those who have the capability to control the air, control the land and sea beneath it, so in the future it is likely that those who have the capability to control space will likewise control the earth’s surface” Gen Thomas D. White Chief of Staff, USAF, 1957 134 SATELLITES – OVERVIEW Basic Orbit Types Numerous Satellites Surrounding the Earth 135 Major Elements of any Space Programme ▪ Spacecraft/ Satellite ▪ Satellite Launch Vehicle ▪ Satellite Launch Facility ▪ Mission Control Center ▪ Ground Control Station(s) ▪ User Earth Stations/ Terminals Satellites vs. Probes ▪ Satellites Earth-bound Spacecrafts ▪ Probes Outer Space Exploration Spacecrafts Satellite Payload and Satellite Platform ▪ Satellite Payload The equipment meant to undertake the actual mission is collectively termed as “payload”, such as communication, navigation, weather, earth observation payloads etc. ▪ Satellite Platform All the on-board equipment meant to support the payload is collectively termed as “platform”. This includes power, control, data handling, command and telemetry, structure, thermal control subsystems. LV Interface Adaptor Payload Platform 136 Major Satellite Types ▪ Communication Intelsat 23 ▪ Earth Observation Astrium Pleiodes ▪ Remote Sensing ESA’s Envisat LV Interface Adaptor 137 ▪ Weather ESA’s Me/Op-A ▪ Navigation GPS-IIR (M) ▪ Scientific ESA’s Plank 138 ▪ Experimental DLR’s TET-1 ▪ Manned Missions International Space Station (ISS) ▪ Military • Communication UK’s SkyNET-5 139 • Intelligence/ Reconnaissance/ Surveillance US’s Milstar • Killer (Anti-satellite) Probes Mission Missions that deal with study of matter and phenomena occurring in solar systems, galaxies and stars etc. ▪ Solar Probes ▪ Comets and Asteroids ▪ Origin and future of Universe ▪ SETI: Search for ET Intelligence ▪ Planetary Missions LAUNCH VEHICLE- OVERVIEW Satellite Launch Vehicles 140 LAUNCH VEHICLE- OVERVIEW Satellite Launch Vehicle Configuration Launch Vehicle Payload Adaptors 141 Satellite Launch Facility China’s Xichang Satellite Control & Operations Centre Satellite Control Centre (SSC Communications Operations Control Centre (COCC) 142 GROUND SEGMENT - OVERVIEW Ground Control Station PakSat-1R PakSat-1R Satellite Control Facility – Lahore Satellite Control Facility – Karachi Ground User Earth Stations/ Terminals User Earth Stations/ Terminals SATELLITE APPLICATIONS – INTRODUCTION Key Civilian Applications 1. Communication and Broadcasting 2. Remote Sensing and Earth Observation 143 3. Navigation 4. Weather Forecasting/ Global Climatic Change 5. Space Exploration 6. Mineral Prospection 7. Search and Rescue 1. Civilian Applications – Communication & Broadcasting ▪ Telecommunication ▪ Video Broadcasting (DVB/ DTH/ HDTV) ▪ Broadband Internet ▪ Satellite News Gathering (SNG) ▪ Backhaul Connectivity ▪ Tele-Medicine ▪ Tele-Education ▪ E-Commerce ▪ Emergency Communication ▪ Rural/ Remote Area Communication Telecommunication Broadband Internet Video Broadcasting 144 Tele-education Emergency Communication 2. Civilian Applications – Remote Sensing/ Earth Observation ▪ Environmental Studies ▪ Hydrology ▪ Bio/ Nature Conservation ▪ Forestry ▪ Agricultural Engineering ▪ Physical Planning/ Land Surveying ▪ Disaster Management Global NO2 Monitoring Physical Planning Crop Monitoring Balakot (Earthquake 2005) Mansehra (Before and After Flood of 2010 145 3. Civilian Applications – Navigation Aviation Navigation Surveying Location Finding 4. Civilian Applications – Weather Forecasting Weather Satellite Image 5. Civilian Applications – Space Exploration 146 Outer Space Exploration 6. Civilian Applications – Mineral Prospection Mineral Exploration and Identification 7. Civilian Applications – Search and Rescue (SAR) COSPAS-SARSAT System: 33000+ People Rescued since 1982 147 Key Military Applications ▪ Early Warning ▪ Reconnaissance/ Surveillance ▪ Navigation ▪ Communications ▪ Damage Assessment ▪ Mission Planning and Assistance ▪ Electronic Intelligence SBIRS (Space Based Infrared System) ▪ Consolidated system intended to meet the United States' infrared space surveillance needs ▪ Scanning and tracking infrared sensors ▪ Designed to provide key capabilities in the areas ▪ Missile warning ▪ Missile defense ▪ Battle space characterization ▪ Satellites in Geosynchronous orbit (GEO), sensors hosted on satellites in highly elliptical orbit (HEO), ▪ Ground-based data processing and control 148 Electronic Intelligence (ELINT) 149 SATELLITE CORE TECHNOLIGIES – DEVELOPMENT & TRENDS Core Technologies RF and Microwave Engineering ▪ Antennas ▪ Filters, IMUX, OMUX ▪ High Power Amplifiers ▪ Waveguides ▪ Switches Parabolic Antenna Horn Antenna RF Switch Waveguides Amplifier (TWTA) Filters Core Technologies Electrical and Electronic Engineering ▪ Digital Electronics ▪ Analog Electronics ▪ Control Electronics ▪ Power Electronics Digital Electronics Battery 150 Solar Array Power Electronics Core Technologies Mechanical Engineering ▪ Satellite Structure ▪ Unit Housings ▪ Deployment Mechanisms ▪ Drive Mechanisms Momentum and Reaction Wheels Satellite Structure Unit Housing SA Drive Mechanism SA Deployment Mechanism Antenna Deployment Mechanism 151 Core Technologies Thermal Control ▪ Multi-Layer Insulation (MLI) ▪ Optical Solar Reflector (OSR) ▪ Heat Pipes ▪ Heaters ▪ Lubricants, Paints MLI Heat Pipes Core Technologies Space Propulsion ▪ Rocket Motors/ Engines ▪ Thrusters ▪ Valves ▪ Propellant Tanks and Pipes Propellant Tank Thruster Rocket Motor 152 SATELLITE CORE TECHNOLOGIES – DEVELOPMENT & TRENDS Core Technologies Optics/ Optoelectronics ▪ Telescope (PAN, MS, HS) ▪ Detector (CCD) ▪ Read Electronics ▪ Data Storage and Processing ▪ Data Transmission Software Engineering ▪ Mission Control ▪ Flight Dynamics ▪ Dynamic Satellite Simulation ▪ Satellite Control Software ▪ Real Time Operating System ▪ Command and Data Handling ▪ Attitude and Orbit Control ▪ Thermal Control ▪ Onboard Computer ▪ Failure Detection, Isolation and Recovery (FDIR) Mission Control Software Flight Dynamics Software Simulation and Test Facilities Launch Environment ▪ Vibration ▪ Shock ▪ Acceleration ▪ Acoustic Noise Space Environment ▪ Compact Antenna Test Range (CATR) ▪ Thermal Vacuum (TVAC) 153 ▪ Zero Gravity Simulation ▪ Space Radiation Simulation ▪ Sun Simulator ▪ Earth Horizon Simulator ▪ Star Constellation Simulator TVAC Vibration SA Deployment in Zero g CATR SATELLITE TEHNOLOGY TRANSFORMATION TRENDS Trends in Satellite Technology ▪ Shift from large to small Satellites ▪ Micro and Pico Satellites forming Constellation ▪ Student Satellite Project to develop awareness ▪ Use of Commercial Off The Shelf (COTS) Components in Space Technology ▪ Modularity and Re-configurability in Satellite design ▪ Highly Adaptable Satellites (HYLAS)

Filename: Engineering-News-Journal-Vol48-No3-4.pdf
File Type: pdf
File Size: 15 MB
Categories: Volume 0048 No 03-04
Downloads: 8