Paper No. 568 – Construction of bored cast-in-situ concrete piles on chashma right bank irrigation project stage-ii
Paper No. 560 – An introduction to time series modeling and its application in water resources engineering
Paper No. 561 – Proposed revisions to the pakistan highway code for seismic design of reinforced concrete bridge piers