1 PAPER NO. 259 NEED FOR UPDATION OF PROCUREMENT AND CONTRACT ADMINISTRATION By Engr. Abdul Qayyum 2 Engr. Abdul Qayyum Paper No. 259 NEED FOR UPDATION OF PROCUREMENT AND CONTRACT ADMINISTRATION ABSTRACT Standardization, strictly keeping in view updated strategi c tactics, both in Technical and administrative matters are desired for the satisfactory execution of many types of national/commercial projects. Major projects, whether they are predominantly building, civil engineering, chemical engineering, electrical engineering, mechanical engineer or any combination, are frequently complex. With re sulting increased complexity of contract conditions, it is becoming increasingly important for them to be based upon a standardized form of contract with which the contracting parties and financial institutions are familiar. In the majority of cases, the contracting parties will react favourably to such a standardized form of contract; which should lessen the likelihood of unsatisfactory performance, increased costs and disputes. If the contract is based on standard, updated and relevant conditions of contract, tende rers should not need to ma ke financial provision for unfamiliar/ irrelevant / restrictive contract conditions .The widespread use of relevant standard conditions also facilitate the trai ning of personnel in contract management, reducing the need for them having to work with every-changing contract conditions. Author has been working as c onsulting claim/contract e ngineer since 2000 in the administration of big WAPDA C ontracts. During the dealing it is seriously felt that in WAPDA, as generality, updated relevant st andardization is not being exercised and resultantly poor performance, i.e. overrun of time/cost in almost all Vision 2025 projects is clearly seen. Unnecessary restri ctions in part II of the C onditions of Contract are big hindrance in participation by European Contractors in Pakistan. This paper is an attempt to desc ribe the state of art “Procurement and Contract Administration” techniques so that the overrun of time/cost is minimized and the contracting parties may react favourably with each other to achieve the targets, possibly, in accordance with the tendered schedules. I hope that the paper will be well received by the concerned authorities and the practicing engineers in Pakistan. 3 Engr. Abdul Qayyum Paper No. 259 1. Introduction. a) To conceive the exact legal enforcement/requirements /rights and obligations of the parties in the procurement contracts, it seems necessary to first explain the terms used therein. The word ‘procurement’ means cause to do some things through reasoning/arguments. ‘Contract’ means a written agreement intended to be enforced by law, while administration means the organization and running of a business or system. Thus the subject as a whole means two or more parties: comprising normally a Client /Employer, Consultant and Contractor or a Client/|Employer with or /Without management Consultant and a Contractor to be proceeded willingly to deliver/create/build something, like different construction works, plants including any combin ation of civil, mechanical and/or electrical works, following some rules/conditions/rights and obligations asked for, and/or- by, th e parties in an established/justified way. b) Types of Contracts. Presently four types of contracts, as follows, are being practiced in the world. i) Construction Projects ii) Plant and Design –Build Projects iii) Engineering Procurement and Construction /Turnkey Projects. iv) Short Form of Contracts. Each form of these contracts has its own specific conditions depending upon its requirement for execu tion, quantity of works and resolution of disputes. Likewise every contract has a unique sequence of Principal Events/Payment/Disputes during its diffe rent phases of c onstruction, Figs (1&2 Page 33&34) c) Conditions of Contract for different Projects i. Conditions of Contract for Construction, which are recommended for building or engineering works designed by the Employer or by his representative, the Engineer. Under the usual arrangements for this type of contract, the Contractor constr ucts the works in accordance with a design provided by the Employer. However, the works may include some elements of Contractor-designed civil, mechanical and /or electrical construction works. ii. Conditions of Contract for Plant and Design-Build, which are recommended for the provision of electrical and/or mechanical plant, and for the design and execution of building or engineering works. Under th e usual arrangements for this type of contract, the Contractor designs and provides, in 4 Engr. Abdul Qayyum Paper No. 259 accordance with the Employer’s requirements, plant and/or other works; which may include any combination of civil, mechanical and/or electrical construction works. iii. Conditions of Contract for EPC/Turnkey Projects, which may be suitable for the provision on a turnkey basis of a process or power plant, of a factor y or similar facility, or of an infrastructure project or other type of development, where (i) a higher degree of certainty of fi nal price and time is required, and (ii) the Contractor takes to tal responsibility for the design and execution of the project, w ith little involvement of the Employer. Under the usual arrang ements for turnkey projects, the Contractor carries out all the Engineering, Procurement and Construction (EPC), following the employer’s requirements as prepared by the Employer or his representative; providing a fully equipped facility, ready for operation (at the “turn of the key’). iv. Short Form of Contract, which is recommended for building or engineering works of relatively small capital value. Depending on the type of work and the circumstances, this form may also be suitable for contracts of greater value, particularly for relatively simple or repetitive work or work of short duration. Under the usual arrangement of this type of cont ract, the Contractor constructs the work in accordance with a design provided by the Employer or by his representative (if any), but this form may also be suitable for a contract which includes, or wholly comprises, contractor-designed civil, mechanical and/or electrical construction works. 5 Engr. Abdul Qayyum Paper No. 259 Fig-1 Typical sequence of Principal Events during Contracts for Construction 1- The time for Completion is to be stated (in the Appendix to Tenders) as a number of days, to which is added any extensions of time under Sub-Clause 8.4 2- In order to indicate the sequence of events, the above diagram is based upon the example of the Contractor failing to comply with Sub-Clause 8.2 3- The Defects Notification Period is to be stated (in the Appendix to Tender) as a number of days, to which is added any extensions under Sub-Clause 11.3 Issue of Tender Submission of the bids Issue of the Letter of Acceptance 8.1 Commencement Date Base Date 28d <28d Tender Period 4.2 Issue of Performance Security 8.2 Time for Completion1 9.1 Tests on Completion3 Delay attributable to the Contractor2 10.1 Issue of Taking-Over Certificate Defects Notification Period3 11.9 Issue of the Performance Certificate 11 Notifying of Defects Remedying Of Defects 4.2 Return of the Performance Security <21d 6 Engr. Abdul Qayyum Paper No. 259 Typical sequence of Payment Events envi saged in Clause 14 (Contract Price and Payments) Fig. 2 Typical sequence of Dispute Events envisaged in Clause 20 (Claim, Dispute & Arbitration) Each of the Monthly (or Otherwise) Interim payments The final payment 14.3 Contractor submits Statement to the Engineer 14.6 Engineer issues Interim Payment Certificate <56d <28d Engineer verifies Statement, Contractor Submits information 14.7 Employer makes the Payment to the Contractor 14.11 Contractor submits draft final statement to the Engineer 14.11 Contractor issues Final Statement and the 14.12 discharge <28d 14.13 Engineer issues Final Payment Certificate <56d 14.7 Employer makes payment 8.1 Commencement Date 20.2 Parties appoint DAB 20.4 Party refers a dispute to the DAB Parties present Submissions to the DAB 20.4 A Party may issue a “notice of dissatisfaction” 20.6 A Party may initiate arbitration Amicable Settlement <28d <84d <28d DAB gives Its decision <56d Arbitrator/s Appointed 7 Engr. Abdul Qayyum Paper No. 259 2. Procurement. Procurements under projects financed by World Bank and Asian Development Bank shall be carried out in accordance with the Guidelines for procurements issued by the respective Bank for utilization of loans (hereinafter called WB/ADB Guidelines for Procur ement). The Executing Agencies, like WAPDA, should use some standard bidi ng documents for its procurement got vetted from the respective Bank i.e. They should be adapted as necessary to the circumstances of a particular project of the Borrower. Even if some Executing Agency do not intend to be financed by WB/ADB, documents for procurements should be adapted taking the help of some standard bidding/procurement procedures prepared by some well reput ed funding agency as high degree of experty, regarding international engineer ing, law and financi ng is involved along with the fact that the document, provision wise, is consistent. 3. Conditions of Contracts The conditions of contract comprise two parts - General Condition and conditions of Particular Application or “Special Conditions”. Over the years, a number of “model” General Conditions of Contract have been evolved. One of these documents was prepared by the International Federation of Consulting Engineers (FIDIC) and is commonly known as FIDIC Conditions of Contract (Fourth edition, 1987 and ge nerally used in WAPDA/Pakistan. In FIDIC’s ideas, (4th and later editions), in relation to an express obligation upon the Engineer to be impartial, the deemed obligation upon the Employer to disclose all information concerning the ground conditions on site and the introduction of conciliation into the disputes procedure after the Engineer’s decision and before arbitration should, be given due importance to avoid the lengthy overrun of cost/time during litigation. The Risk should be divided in line with the philosoph y that the Employer is best placed to take on those risks which experienced contractors could not reasonably be expected to fo resee, which are outside the control of the parties and which are not readily capable of being covered by insurance. Note that unpredictable ground conditions are the risks of the Employer. The use of standard conditions of contract for civil works throughout WAPDA/country will ensure comprehensiveness of coverage, general acceptability/understanding of its provision, saving in time and cost of bid and review, and the development of a solid background of legal case histories. But they must be customized, after through diligence, to incorporate our needs/constraints. Restraints, if unavoidable, on Engineers duties and authority be provided in the equivalent clause in part II. 8 Engr. Abdul Qayyum Paper No. 259 4. Amendment of FIDIC’s 4th Edition Usually FIDIC Conditions are used in an amendment form, perhaps in a majority of cases. Certainly, many of the major Employers in Asia adopt and refine their own standard sets of amendments. These amendments are generally aimed at adjusting the balance of risk in favour of the Employer rather than to remedy any ambiguities, anomalies or discrepancies in the drafting. In deed sincere efforts should be made to remove ambiguities, anomalies and discrepancies and thereby to reduce the scope for conflict. For the detailed criticism, the reader is referred to the commentary under the particular clause referred to in Ref.1. There is a species of amendm ent, which might be of benefit to both the parties such as amending clause 44 (Ext ension of time) and clause 46.1 (Rate of progress) to enable the Employer to order acceleration in lieu of extension of time or in circumstances where the Contractor’s entitlement to extension of time is a matter of dispute. 5. Caution Generally, great care is needed when amending any standard form of contract. These FIDIC conditions are generally well ba lanced and, as with any contact, there are a great number of links and relationships between diffe rent clauses, not all of which are express or otherwise obvious. With any amendments, therefore, there is a chance of upsetting the balance or creati ng unintended consequential changes to related provisions. It is in the interest of all parties that changes should be kept to a minimum. 6. Uniformity/match-up of General Conditi ons in different types of Contracts. In 1999 FIDIC published the four types of Contracts mentioned in para-1(b) above with one contract in a sepa rate book. In 2000 via ISBW 2-88432-022-9 FIDIC published, The FIDIC Contracts Guide, in which the first three of (above mentioned contracts) are covered and refe rred to as “CONS’, P&DB and “EPCT”. In 1999 FIDIC as a “matching set” maintained 20 main clauses in each form of the Contract with same headings i.e. with each topic being covered in similarly-worded provision in each book, except where otherwis e necessary. The sub clauses in all the form of Contracts are as per the requirements of individual contracts. In the FIDIC Contract Guide to the us e of CONS, P&DB and EPCT, the word “Books” (with capital letter) is used when referring to the three publications, CONS, P&DB and EPCT. These Books were initially published as Test Editions in 1998, and the many reactions to them were reviewed before the First Edition published in 1999. These three books were prepared by FIDIC’s Update Task Group under the general direction of the Contract Committee. In this Guide, the texts in the Books are reproduced in a three-column layout. The texts should be identical to the corresponding texts in the Books, but the reader should refer to the Books in order to dete rmine the necessary authentic wording in case of any discrepancy. 9 Engr. Abdul Qayyum Paper No. 259 For the convenience of those who are fa miliar with the General Conditions of Contract contained in FIDIC’s previous publications, the reference numbers of their sub-clauses which cover similar subject ma tter are included within an insert box after these three column texts reproduced from the Books, the sub-clause reference numbers being related to: “RB” Conditions of Contract for Works of Civil Engineering Construction 4 th edition 1987 amended 1992 (which was commonly referred to as the Red Book). “YB” Conditions of Contract for Electrical and Mechanical Works 3 rd edition 1987 amended 1988 (which was commonl y referred to as the Yellow Book). “OB” Conditions of Contract for Design Build and Turkey Ist edition 1995 (which was commonly referred to as the Orange Book). In each Contract, the Cond itions of Contract gov erning the rights and obligations of the parties will comprise the appropriate General Conditions together with Particular Conditions. It will be nece ssary to prepare the Particular Conditions for each individual contract, taking account of the comments in this Guide. It is essential that all these drafting tasks, and the entire preparation of the tender documents, are entrusted to personnel with the relevant expertise, including the contractual, technical and procurement aspects. 10 Engr. Abdul Qayyum Paper No. 259 7. Comparison of the main features of the three Books CONS. Conditions of Contract for Construction P&DB: Conditions of Contact for Plant and Design Build EPCT: Conditions of Contract for EPC/Tumkey Projects Recommended for building and engineering works if most (or all) of the works are to be designed by (or on behalf of) the Employer. Recommended for the provision of electrical and/or mechanical plant and for building and engineering works if most (or all) of the works are to be designed by (or on behalf of) the Contractor. Suitable for a process or power plant, a factory or similar facility, or an infrastructure project or other type of development, if (i) a higher degree of certainty of final price and time is required, and (ii) the Contractor takes total responsibility for the design and execution of the project. The Contract typically becomes legally effective when the Employer issues the Letter of Acceptance to the Contractor. Alternatively, there may be no such Letter, and the Contract becomes effective in accordance with the Contract Agreement. The Contract typically becomes legally effective when the Employer issues the Letter of Acceptance to the Contractor. Alternatively, there may be no such Letter, and the Contract becomes effective in accordance with the Contract Agreement. The Contract typically becomes legally effective in accordance with the Contract Agreement. The Letter of Tender may be worded so as to allow for the alternative of the Contract becoming effective when the Employer issues a Letter of Acceptance. The Contract is administered by the Engineer who is appointed by the Employer; if disputes arise, they are referred to a DAB for its decisions. Alternatively, particular Conditions may specify Engineer’s decisions on disputes, in lieu of a DAB. The Contract is administered by the Engineer who is appointed by the Employer, if disputes arise, they are referred to a DAB for its decisions. Alternatively, Particular Conditions may specify Engineer’s decisions on disputes, in lieu of a DAB. The Contract is administered by the Employer (unless he appoints an Employer’s Representative) who endeavors to reach agreement with the Contractor on each claim. If disputes arise, they are referred to a DAB for its decisions. The Contractor designs (but only to extent specified) and executes the works in accordance with the Contract (which includes the Specification and Drawings) and the Engineer’s instructions. The Contractor provides plant, and designs (except as specified) and executes the other works, all in accordance with the Contract, which includes his proposal and the Employer’s Requirements. The Contractor provides plant, and designs and executes the other works, ready for operation in accordance with the Contract, which includes his tender and the Employers’ Requirements. Interim and final payments are certified by the Engineer, typically determined by measurement of the actual quantities of the works and applying the rates and prices in the Bill of Quantities or other Schedules. Other valuation principles can be specified in Particular Conditions. Interim and final payments are certified by the Engineer, typically determined by reference to a Schedule of Payments. The alternative of measurement of the actual quantities of the works and applying the rates and prices in a schedule of Prices can be specified in Particular Conditions. Interim and final payments are made without any certification; typically determined by reference to a Schedule of Payments. The alternative of measurement of the actual quantities of the works and applying the rates and prices in a Schedule of Prices can be specified in Particular Conditions. The General Conditions allocate the risks between the parties on a fair and equitable basis; taking account of such matters as insurability, sound principles of project management, and each party’s ability to foresee, and mitigate the effect of, the circumstances relevant to each risk. The General Conditions allocate the risks between the parties on a fair and equitable basis; taking account of such matters as insurability, sound principles of project management, and each party’s ability to foresee, and mitigate the effect of, the circumstances relevant to each risk. Disproportionately more risks are allocated to the Contractor under the General Conditions. Tenderers will require more data on hydrological, subsurface and other conditions on the Site, to the extent that this data is relevant to the particular type of works, and more time to review the data and evaluate such risks. 11 Engr. Abdul Qayyum Paper No. 259 8. TECHNICAL SPECIFICATIONS FOR CONSTRUCTION PROJECTS A set of precise and clear sp ecifications is a prerequisi te for bidders to respond realistically and competitively to the requirements of the Employer without qualifying their bids. In the context of International Compe titive Bidding (ICB), the specifications must be drafted to permit the widest possible competition and, at the same time, present a clear statement of the required standards of work manship, materials, and performance of the goods and services to be procured. Only by so doing the objectives of economy, efficiency, and fairness in procurement will be realized, responsiveness of bids be ensured, and the subsequent task of bid eval uation facilitated. The specifica tions should require that all goods and materials to be incorporated in the goods be new, unused, and of the most recent or current models, and that they incorpor ate all recent improvements in design and materials unless provided for otherwise in the contract. Samples of specifications from previous similar procurements in the same country are useful in this respect. The use of metric units is encouraged by the loan giving agencies. There are considerable advantages in standardizing General Technical Specifications for repetitive Works in recognized public sect ors such as highways, ports, railways, urban housing, irrigation, water suppl y, etc., in the same country or region where similar conditions prevail. The Gene ral Technical Specifi cations should cove r all classes of workmanship, materials and equipment common ly involved in cons truction, although not necessarily to be used in a particular works contract. Dele tions or addenda should then adapt the General Specifications to the particular Works. Care must be taken in drafting technical specifications to ensure they are not restrictive. In the specifications of standards fo r goods, materials and workmanship recognized international standards should be used as much as possible. Where other particular standards are used the specifica tions should state that goods, materials and workmanship meting other authoritative standa rds, and which ensure equal or higher quality than the standards mentioned, would also be acceptable. The following Clause may be inserted in the Special Conditions or Specifications. 9. Sample Clause; Equivalency of Standards and Codes Wherever reference is made in the Contract to specific standards and codes to be met by the goods and materials to be furnished, and work performed or tested, the provisions of the latest current edition or revision of the relevant standards and codes in effect shall apply, unless otherwise expressl y stated in the Contract. Wh ere such standards and codes are national, or relate to a particular country or region, ot her authoritative standards which ensure an equal or higher quality than the standards and codes specified will be accepted subject to the Engineer’s prior review a nd written approval. Differences between the standards specified and the proposed alternat ive standards must be fully described in writing by the Contractor and submitted to the E ngineer at least 28 days prior to the date when the Contractor desires the Engineer’s approval. In the event the Engineer determines that such proposed deviations do not ensure equal or higher quality, the Contractor shall comply with the standards specified in the documents. 12 Engr. Abdul Qayyum Paper No. 259 10. IN A DESIGN BUILD OR TURNKEY PROJECT THE DOCUMENT, “EMPLOYER’S REQUIREMENTS” In the traditional approach, Construction Project, the Employer employs his Architect/Engineer to design its Works. From this design a detailed technical specifications is drawn up for bidders to bid on. In a Design Build or Tumkey approach the design is to be done by the Contractor. No detailed technical specification as is normally recognized is developed at the pre-bid stage. However, the Employer does and must know what it wants and must communicate its needs to the bidders. Hence, this section on Employer’s Requirements replaces the usual Technical Specifications of a more traditional approach. To enable bidders to submit responsive bids and subsequently for the bids received to be evaluated in a fair and equitable manner, the Employer must take its requirements as clearly and as precisely as possible. The Em ployer’s requirements must therefore specify exactly the particular require ments of the completed Works including scope and quality. Where the performance of the completed works could be measured in quantitative terms (e.g. production output of a manu facturing plant or maximum generating capacity of a power station) the Employer’s requirements should not only clearly specify the desired output/capacity and how such deviations (if any) will be evaluated. It will also be necessary to specify the tests that will be carried out on completion of the Works to verify compliance with the requirements specifie d. The Employer’s Requirements should also clearly specify what associated or incidental services and goods must be supplied by the Contractor. For example, the Contractor may be required to train the Employers personnel and to supply consumable or spare parts as listed in a Schedule. While this section of the bi dding documents should endeavor to define the Employer’s Requirements as precisely as possi ble, care must be taken to avoid over specifying details to the extent that the flexib ility and potential benefi ts associated what a Design Build or Tumkey contract are seriou sly eroded or threatened. This section on Employer’s Requirements should, therefore, be carefully prepared on behalf of the Employer by suitably qualified engineers who ar e familiar with the requirements and with the technical aspect of the required Works. For a Bank financed project the Design Build or Tumkey Contract will have to be subject to International competitive bidding and the Employer’s Requirements must be drawn up to permit the widest possible competition and, at the same time, present a clear statement of the required standards of work manship, materials and performance of the Works. Only by so doing th e objective of economy and e fficiency and equality in procurement will be realized, responsiveness of bids be ensured and the subsequent task of bid evaluation facilitated. The Employer’s Re quirements should sti pulate that all goods and materials to be incorporated in the Work s are new, unused, of the most recent or current models and incorporate all recent improvements in design and materials. As for the drafting of Technical Specifications, care must be taken when drafting the Employer’s Requirements to ensure that the requirements are not restrictive. In the 13 Engr. Abdul Qayyum Paper No. 259 specification of standards of goods, materials and workmanship, recognized International standards should be used as much as possi ble, where other particular standards are specified, whether national standards of the executing country or other standards, it should be stated that goods, materials and workmanshi p meeting other authoritative standards and which promise to ensure equal or higher quality than the standards specified, will also be acceptable. Where a brand name of a product is specified it should always be qualified with the terms or equivalent. In addition to stating the requirements of the completed Works clearly the Employer’s Requirements Section should also in clude matters related to the execution of the Works to enable the bidders to gauge the extent of responsibility and to price the bid accordingly. The matters referred to in some of the following sub-clause may be included: 1.9 Number of copies (and required extent) of Construction Documents. 4.1 Design criteria and calculations (if any) to be checked by the Contractor and confirmed to be correct with the bid. 1.1 Other contractors and organization (and others) on site to whom the Contractor should afford reasonable opportunities for them to carry out their work. 4.7 Setting -out points, lines and levels of reference to be used. 4.8 Quality Assurance system details. 4.12 Access routes particularly if such routes are within existing facilities. 4.13 Periods for pre-construction reviews and for any submission, approvals and consents. 4.20 Employer’s machinery and materials. 5.1 Qualification criteria of design personnel 5.2 Extend and procedures for submission and pre-construction reviews of construction documents. 5.5 List of samples and procedure for submission for pre-construction testing and review of data. 5.6 Form and number of As- built drawi ngs and records of the works to be submitted and approval process. 5.7 Timing and number of copies of ope ration and Maintenance Manuals to be submitted and approval process. 6.6 Facilities to be provided on site by th e Contractor for the Employer and the Employer’s Representative and its personnel. 7.4 Tests to be carried out during manufacture and/or construction. 14 Engr. Abdul Qayyum Paper No. 259 9.1 Tests to be carried out in Completio n before Taking Over to demonstrate completion. If the works are to be test ed and taken over in stages, the test requirements and special arrangements must be detailed. 11.1 Test to be carried out after Taking Over to verify that the Works fulfill the performance requirements. 11.4 Minimum performance criteria acceptable below which works failing to pass tests after completion will be rejected. Recommended Procedures The following diagrams illustrate FIDIC’s recommended procedures for: - Pre qualification, for which FIDIC has published “Standard pre qualification forms for contractors.” - Obtaining Tenders for a CONS Contractor (taking account of its principles), and - Opening and evaluating such Tenders, and entering into the Contractor. 15 Engr. Abdul Qayyum Paper No. 259 Recommendation Procedure for the Pre-qualification of the Tenderers SECTION EMPLOYER / EN GINEER CONTRACTORS 1.0 ESTABLISHMENT OF PROJECT STRATEGY 2.1 PREPARATION OF PREQUALIFICATION DOCUMENTS 2.2 INVITATION TO PREQUALIFY 2.3 ISSUE & SUBMISSION OF PREQUALIFICATION DOCUMENTS 2.4 ANALYSIS OF PREQUALIFICATION A P P L I C A T I O N S 2.5 SELECTION OF TENDERS 2.6 NOTIFICATION OF APPLICANTS ESTABLISH PROJECT STRATEGY COMPRISING: - Procurement method - Form for tendering - Time schedules PREPARE PREQUALIFICATION DOCUMENTS COMPRISING: - Letter of invitation - Information about pre-qualification Procedure - Project information -P r e -qualification application PLACE PREQUALIFICATION ADVERTISEMENT IN PRESS, EMBASSIES ETC. AS APPROPRIATE STATING: - Employer & Engineer - Outline of project (scope, location, Programme, source of finance) - Dates for issue of tender documents & submission of tenders - Instructions for applying for prequalification - Minimum requirements for prequalification - Submission date for contractors prequalification data ISSUE PREQUALIFICATION DOCUMENT & QUESTIONNAIRES REQUESTING FROM EACH COMPANY/JOINT VENTURE: - Organization and structure - Experience in the type of intended work and in the region - Resources - Managerial - Technical - Labour - Plant - Financial statements - Current contract commitments - Litigation history REQUEST PREQUALIFICATION DOCUMENTS COMPLETE & SUBMIT PREQUALIFICATION DOCUMENTS & QUESTIONNAIRES - ACKNOWLEDGE RECEIPT ANALYSE PREQUALIFICATION DATA: - Company/joint venture structure - Experience - Resources - Financial capability - General suitability PREPARE LIST OF TENDERS NOTIFY ALL SELECTED TENDERS ACKNOWLEDGE & CONFIRM INTENTION TO SUBMIT TENDER 16 Engr. Abdul Qayyum Paper No. 259 Recommendation Procedure for Obtaining Tenders Under CONS SECTION EMPLOYER / ENGINEER TENDERERS 3.1 PREPARATION OF TENDER DOCUMENTS 3.2 ISSUE OF TENDER DOCUMENTS 3.3 VISIT TO SITE BY TENDERERS 3.4 TENDERERS’ QUERIES A) CORRESPONDENCE METHOD B) TENDERERS’ CONFERENCE M E T H O D 3.5 ADDENDA TO TENDER D O C U M E N T S 3.6 SUBMISSION AND RECEIPT OF T E N D E R E R S PREPARE TENDER DOCUMENTS: - Letter of invitation to Tender - Instructions to Tenders - Conditions of Contract - Letter of Tender - Drawings - Bill of Quantities - Schedule of Additional Information - Information ISSUE TENDER DOCUMENTS TO CONTRACTORS ON LIST OF TENDERERS ACKNOWLEDGE RECEIPT ARRANGE DATE AND TIME FOR VISIT TO SITE APPLY FOR VISIT TO SITE IF REQUIRED VISIT(S) TO SITE BY TENDERERS ACCOMPANIED BY EMPLOYER / ENGINEER A) PREPARE SUBMIT QUERIES IN WRITING BY GIVEN DATE B) INFORM TENDERERS PRESENT OF QUIERIES AND REPLIES SUBMITED IN WRITING REPLIES TO QUERIES RAISED AT CONFERENCE SEND MINUTES TO ALL TENDERERS ACKNOWLEDGE RECEIPT ISSUE ADDENDA INCLUDING REPLIES TO QUERIES TO ALL TENDERERS ACKNOWLEDGE RECEIPT RECORD DATE & TIME OF RECEIPT SUBMIT TENDERS ACKNOWLEDGE RECEIPT OR RETURN UNOPENED TENDERS RECEIVED LATE 17 Engr. Abdul Qayyum Paper No. 259 Recommendation Procedure for the Opening and Evaluating Tenders SECTION EMPLOYER / ENGINEER TENDERERS/ CONTRACTOR 4.1 OPENING OF TENDERS 5.1 R E V I E W O F T E N D E R S 5.2 TENDERS CONTAINING DEVIATIONS 5.3 ADJUDICATION OF ALL TENDERS 6.0 AWARD OF CONTRACT 6.1 ISSUE LETTER OF ACCEPTANCE 6.2 PERFORMANCE SECURITY 6.3 PREPARATION OF CONTRACT AGREEMENT 6.4 NOTIFICATION OF UNSUCCESSFUL TENDERERS TENDER OPENING BY PUBLIC OR RESTRICTED OPENING - Announce and record the names of Tenderers and Prices, including Prices For alternative Tenders if appropriate - Announce and record names of Tenderers (if any) disqualified due to Late or non-arrival of Tenders ATTEND PUBLIC / RESTRICTED OPENING IF DESIRED ESTABLISH CONFORMITY AND COMPLETENESS OF TENDERS - Reject substantially unresponsive Tenders EVALUATE DEVIATIONS, SEEK CLARIFICATION AND RANK TENDERS AS EVALUETED PROVIDE CLARIFICATION ASSESS TENDERS IN ACCORDANCE WITH EVALUATION CRITERIA RAISE FURTHER POINTS REQUIRING CLARIFICATION, IF ANY COMPLETE EVALUATION CHECK WITH FUNDING AGENCY REJECT NON CONFORMING TENDERS & ADVISE TENDERER (S) CONCERNED PROVIDE CLARIFICATION DECIDE ON CONTRACT AWARD, IF NECESSARY AFTER PRE-AWARD DISCUSSION ATTEND PRE-AWARD DISCUSSION IF REQUIRED ISSUE LETTER OF ACCEPTANCE ACKNOELEDGE RECEIPT RECEIVE PERFORMANCE SECURITY FROM CONTRACTOR PROVIDE PERFORMANCE SECURITY PREPARE CONTRACT DOCUMENTS SIGNING OF CONTRACT SIGNING OF CONTRACT ADVISE UNSUCCESSFUL TENDERERS AND RETURN TENDER SECURITY (IF PROVIDED) UNSUCCESSFUL TENDERERS ACKNOWLEDGE RECEIPT 18 Engr. Abdul Qayyum Paper No. 259 The above procedures for obtaining, opening and evaluating tenders relate to a CONS contract. Under P&DB and EPCT, tenderers submit details of the design proposals, to the extent described in the instructions to tenderers, and the adjudication of the tenders includes examination and assessment of these proposals. Under P&DB or EPCT, the documents issued for purpos es of obtaining Tenders have different titles and purposes, compared with those required for a CONS Contract, and tendering procedures should take account of the greater extent of the Contractor’s obligations and liabilities under a P&DB or EPCT Contract. Recommendations 1. In Construction Projects FI DIC’s recommended procedures, for pre-qualification, obtaining Tenders and opening and evaluation of such tenders and entering into the Contract, be adapted unless merit clearly dictates otherwise. 2. Under P&DB or EPCT, the documents issued for the purpose of obtaining tenders have different tilles and purposes, comp ared with those required for a CONS Contract and tendering procedur es should take account of the greater extent of the Contractor’s obligations and liabilities under a P&DB or EPCT Contracts. 3. For making a tender internationally competitive, well planned and well executed geological, site investigations pre requisite . Deficiency in this aspect will create disputes leading to overrun of time/cost. Amendment of general conditions aimed at adjusting the balance of risk infavour of Employers, rather than to remedy any ambiguities, anomalies or discrepancies in drafting is not owned by international law unless the amendments are practicable and foreseeable by any experienced Contactor. 4. To maintain uniformity / matching-up and friendly /good contract administration during procurement, it is proposed that for all types of Contracts (CONS, P&DB and EPCT), relevant FIDIC’s Book published in 1999 or the latest editions be used. 5. Constraints on Engineer’s Duties / Author ity should be discour age in general. Unavoidable Constraints should be mentione d in equivalent sub-clauses, 2.1(a)/2.6 in case of 4th edition of FIDIC. References: 1. FIDIC 4th, a practical Legal Guide through a Commentary on The International Construction Contract by E.C. CO RBETT Published by Sweet And Maxell London, 1991 2. The FIDIC Contracts Guide: • Conditions Of Contract for Construction • Conditions Of Contract for Plant And Design-Build. • Conditions Of Contract for EPC/Tumkey Projects. 2000 ISBN 2-88432 – 022-9 19 Engr. Abdul Qayyum Paper No. 259 3. Standard Bidding Documents – Procurem ent Of Civil Works – Large Contracts – Asian Development Bank December 2002 4. Conditions of Contract for Construction: For Building And Engineering Works Designed by the Employer Including Guidance for the preparation of Partic ular Conditions, Forms of Letter Of Tender, Contract Agreement And Dis pute Adjudication Agreement – First Edition 1999 ISBN 2-88432 – 022-9 5. Request for Proposal – Recruitment of Consulting firms for Technical Assistant (TA) Using Quality and Cost-Based Selection (Q CBS) Method. Asian Development Bank May 2002. 6. Sample Form Of Evaluation Report: Selection of Consultants. The Wo rld Bank Washington D.C – October 1999. 7. Guidelines : Selection and Employment of Consulta nts by World Bank Borrowers January 1997. Revised September 1997, January 1999 and May 2002. 20 LISTING OF PAPERS PRESENTED IN VARIOUS SYMPOSIA OF PAKISTAN ENGINEERING CONGRESS VOLUME / SR. NO. TITILE OF SYMPOSIUM/PAPER NAME OF AUTHOR Volume I HOUSING PROBLEMS OF WEST PAKISTAN FEBRUARY, 1957 1. Introduction to Housing Problem S.A. Rahim 2. Social Aspects of Housing M.H. Shah 3. Some Financial and Administrative Aspects Khan Bashir Ahmad Khan 4. Slum Clearance Irshad Ahmad 5. Urban Development in West Pakistan Mazhar Munir 6. Aspects of Rural Housing Muhammad Afzal Khan 7. Building Material A.A. Jamaluddin 8. Low Cost Houses Ghiasuddin Habib 9. Essential Services and Development Cost Mukhtar Ahmad 10. Principles of Architectural Designing Naseerddin Murat Khan Volume II FLOODS IN WEST PAKISTAN FEBRUARY,1958 11. Causes of Floods in the Indus Basin S.N.Naqvi 12. Forecasting Wirasat Ullah Khan 13. Effects of Flood and Remedial Measures suggested Mian Alim -ud-Din 14. Effect of Floods on the Economic of the Country Abdul Aziz Anwar 15. Effect of Floods on Communication: a)Roads b)Railways A.A.Jamaluddin and M.M.Zubair 16. Prevention and Control of Floods Mian Muzaffar Ahmad 17. Soil Conservation a Measure of Flood Control H.J.Asrar 18. Disposal of Floods Sardar Allah Bakhsh 19. Forestry in Relation to Flood Preservation and Control in West Pakistan Muhammad Ihsan-ur- Rehman Khan 20. Impacts of Floods in Water Resources Development I.A.Zafar 21. Floods in the Arid Zones of West Pakistan G.A.N. Starmans Volume III WATER-LOGGING AND SALINITY IN WEST PAKISTAN FEBRUARY,1959 22. The Drainage M. Saeed Minhas 23. Correlation of Resistivity Variations in Saline and Non-Saline Water Bearing Formation R.A. Shamsi 24. Application of Electrical Resistivity Method to Investigate Sub-Surface Geology with Maqsood Ali Shah Gilani 21 special reference to Hafizabad Reclamation Area 25. A new Conception on the Water-Logging and Salinity Problem of Rechna Doab Dr. Nazir Ahmad 26. Physiolographic history of land formation in West Pakistan Syed N.A.Z Hussaini 27. Economic Effects of Water-Logging and Salinity in West Pakistan Aziz A Anwar Volume IV ENGINEERING EDUCATION IN PAKISTAN FEBRUARY, 1960 28. Ideals for Engineering Education in Pakistan Dr. Mubashir Hassan 29. Education and Training in Engineering Colleges Dr. Akmal Hussain 30. Proposals for a Pakistan College of Mines Robert L. Burns 31. The Place of Workshop Practice in Engineering Education Villiam Arther Mellors Volume V PLANNING AND EXECUTION OF ENGINEERING PROJECTS IN PAKISTAN MARCH, 1961 32. Role of Research in Engineering Projects Dr. Mushtaq Ahmad 33. Design Office-Practice Mohi-ud-din Khan 34. Engineering for Modern Contracts and Construction Daren G. Theil 35. Mechanization of Construction Operations Consulting Engineering Practice in Pakistan Mian Masud Ahmad 36. Consulting Engineering Practice in Pakistan I.A. Zafar Volume VI SEDIMENTATION PROBLEMS AS A RESULT OF INDUS BASIN WORKS APRIL, 1962 37. The Sedimentation of Mangla Reservoir Bennie and Partners 38. The Sediment Problem on the Indus at Tarbela Jhon B. Drisko 39. Silt Trapping Efficiency of Reservoirs with special Reference of Tarbela and Mangla Dams Dr. Nazir Ahmad 40. Reduction of Mangla Reservoir Sedimentation James C. Ringenoldus 41. Sit Trap Efficiency of Vegetative Cover in Catchment Area Amir Ahmad 42. Sediment Problems in the Indus Basin Part-II Sedimentation in River Channels and Flood ways Regime as Result of Link Canals S.S Kirmani 43. Changes in River Regime as Result of Link Canals R.K. Levis 44. Some Salient Features of Silt Ejector in an Mushtaq Ahmad and 22 Alluvial Channel Based on Hydraulic Model Studies. Muhammad Ali 45. A Review of Sediment Problems and Possible Solutions V.A. Koelzer and Mracel Bitoun 46. The Present and Future of Silt Excluding Devices Mohi-ud-Din Khan 47. Sampling and Analysis Technique for Suspended Sediment M.M Ssdiq Volume VII WATER-LOGGING AND SALINITY IN WEST PAKISTAN 48. History and Magnitude of Water-logging and Salinity Problem in Former Punjab, West Pakistan M.A Lateel and R.A Shamsi 49. Salinity and Groundwater conditions in the Lower Plains, Sukkur-Guddu Right Bank and Khairpur-Lower Indus Project T.N Jewitt 50. Water-Logging and Salinity and Factors limiting Agricultural Production in West Pakistan Muhammad Hussain and Nur-ud-Din Ahmad 51. Sodium Hazarad of Punjab Groundwaters C.A Bower and M. Massland 52. Results of Geologic and Groundwater Investigations in the Punjab Plain, West Pakistan Z.U. Kidwals 53. The Programme of Investigations in the Former Sind A.P.S Forbess, G.R. Haffman and Sir M. MacDonal 54. Economic Investigation as related to Drainage with special Reference to Khairpur P.E Nayior 55. WAPDA Programme of Water-Logging and Salinity Control for West Pakistan M. Badr-ud-Din 56. Development of Groundwater in the Indus Plains M. Maasland, J.e Priest and M.S Malik 57. Conjunctive use of surface water and Groundwater supplies in the principal canal irrigated areas of West Pakistan Charkes S. Hazen 58. Review of reclamation activities and methods and suggested measures for water-logging and salinity control Muhammad Hussain and H.A Nishat 59. Efficiency and dependence on Tubewells as means of providing addition supply necessary for controlling salinity and reclaiming waterlogging areas Mr. Sarwar Jan 60. A study of the rise of groundwater and its salinity in the irrigated areas of Indus Plains Dr. Nazir Ahmad 61. Performance of salinity control and reclamation Project No. 1 Rechna Doab Shamim Ahmad, H.S Zaid and Badr-ud-Din 23 Volume VIII CONSULTING AND CONTRACTING PRACTICES IN PAKISTAN MARCH, 1965 62. Consulting and Contracting Practices in Pakistan B.M. Abbas 63. Consulting and Contracting Practices in Pakistan A.V. Karpov 64. Engineering Resources of Pakistan A.A. Abidi 65. Consulting and Contracting Practices in Pakistan G.H. Vaugham Lee 66. Considerations in the Establishment of a Pakistan Association of Consulting Engineers G.T. Macarthy 67. Consulting Services Khawaja Azeem-ud-din 68. The role of Private Consulting Firms in Modern Water Resources Development E-Montford Ffucik 69. Administration of large Contracts J.R Gwyther 70. Construction contracts and Law S.M.R. Abidi 71. Consulting Practice in Pakistan Mangla Dam Contractors 72. Consulting and Contracting Practices in Pakistan Brig. Ahmad Khaleeli Volume IX ROLE OF ENGINEERING RESEARCH IN DEVELOPING ECONOMY OF PAKISTAN OCTOBER, 1966 73. Importance of Nuclear Power Generation in developing economy of Pakistan Masnoon S. Ahmad 74. Nuclear Engineering Research for developing of nuclear power in Pakistan Muhammad Yusuf 75. Role of research in Railway of developing countries C.A. Vali 76. Development of building research in West Pakistan Mian Muhammad Hanif 77. Role of research in the control and use of water Mushtaq Ahmad 78. Hydraulic research in West Pakistan Khalid Mahmood 79. Hydraulic model research for Indus basin Protect C. Van Beesten 80. Research on water and land for survival Dr. Nazir Ahmad 81. Water conservation studies for West Pakistan Muhammad Hussain and 82. Impact of Irrigation research on the developing Economy of West Pakistan Nur-ud-Din Ahmad Volume X BRIDGES FEBURARY, 1968 83. The technique of steam curing of concrete Main Saeed Ahmad 84. The new challenge in Building Abdus Salam 85. Some design aspect of Thatt Shujawal Bridge on the Indus Mohi-ul-din Khan 86. Foundation for Thatta Shujawal Road Bridge on the Indus A.L. Quadri and Mohsin H. Shaikh 24 87. Correction factor for evaluation of discharge by Manning Formula in bridge design Fateh Ullah khan 88. Partial prostrating for high bridge Dr. Jorg Peter Volume XI WATER RESOURCES DEVELOPMENT 89. Planning the development of Pakistan’s water resources Sarfraz Khan Malik 90. Planning irrigation requirement Sh. Muhammad Afzal 91. Drainable surplus problem in irrigated areas P.L. druty 92. Study of water-logging problem of West Pakistan Maqsood Ali Shah Gilani 93. The Economics of land reclamation in the Sindh C.E Finny 94. Some problem of groundwater resources of West Pakistan Dr. Nazir Ahmad Volume XII PROBLEMS OF ENGINEERING PROFESSION IN PAKISTAN 95. Floods and Cyclones in East Pakistan B.M. Abbas 96. Engineering Consultancy and contractual Services in Pakistan Muhammad Omar 97. The making of an Engineer Munzur Ahmad 98. Development of Consultants and Contracting L.A. Zafar 99. The participation of Engineers in National Development Imtiaz Ali Qazlibash 100. Of Engineer and Accounts Riyaz H. Bokhari 101. Training needs of Engineering profession S.M. Rafi Ahmad 102. An Engineer in search of an image Nisarul Haq Volume XIII 103. Planning of Highways for national objectives Imam Bari pervaize 104. Streamlining the public services for the tasks of national objectives M. Iftikhar-ud-Din 105. Organizing earthmoving and construction equipment for achieving National objectives S. Nisarul Haque 106. The challenge of power supply in people’s era Mian Fazal Ahmad 107. Manpower planning K.M. Butt 108. Evaluation of projects; an administrative missing link Masood Hassan 109. People’s works programme, planning and development at local level Abdul Latif Mirzas 110. Development of steel Industry in Pakistan Fida Rahim 111. D’s and don’ts in infra-structural planning Sarfraz Khan Malik Volume XIV 111 to122 TARBELA DAM Papers were not present under instructions from Federal Government 25 Volume XVI LOW-COST STRUCTURES 1978 123. Aspects of low cost Urban construction in Pakistan Z. Mian, K. Mahmood and S.T. Wasti 124. Self-reliance in low cost Rural Development N.M. Awan 125. Economy in Low cost Housing Muhammad Sharif Ahman 126. A study of the effect of sand on the compressive strength soil blocks Ahmad Mukhtar Khan 127. Primary School Buildings requirements and design K. Mahood and S. Khalifa Sh. Wajeehud Di, Bakhtiar 128. Economical design of Masjid Dome Ali and Muhammad Azim 129. Towards low cost buildings Kennerth G. Old 130. Determining minimum cost sections for lined channels Tom trut Volume XVII ENGINEERS’S ROLE IN PLANNING EXECUTION OF PROJECTS 1982 131. Essentially of project management in development economics Khalid Mohtadullah 132. Some management aspects of SCARP-I Dr. N.M. Awan 133. Planning of food protection works Muhammad Aslam Chohan 134. Revised action programme for irrigated Agriculture in Pakistan M. Badruddin 135. SCARP planning in Northern Indus Plans Ch. Ata-ur-Rehman Volume XVIII RURAL DEVELOPMENT OCTOBER, 1985 136. Strategy of rural Development in Pakistan M.S. Cheema 137. Public Tubewells Vs. Private tubewells Ramiz A. Mailk 138. Enhancing water availability to Farmers Nazir Muhammad, M.I. Shahed and S.M.A. Zaidi 139. Non-conventional energy options for rural electrification in Pakistan Mushtaq Ahmad 140. Rural roads in Punjab Rana Akhtar Ali Chohan 141. Impact of salinity control Dr. N.M. Awan 142. Sanitation and drainage Muhammad Saeed Ahmad 143. Drinking water supply coverage to rural areas S.M Ashraf 144. Farm machinery and its role Sikandar M. Khan 145. Maintenance, operation and construction of SCARP Tubewells Abdul Hamid Arif 146. Electrification of villages Abdul Aziz Chaudhry Volume XIX 1985-86 147. Energy conservation Ch. Arshad Zamam 148. Development of Thermal Power Saleem Akhtar Niazi 26 149. Medium term strategy of Hydraulic development in Pakistan M.R Chaudhry 150. Mini Hydro Power Development in Pakistan Daud Beg 151. Energy loss reduction in WAPDA power distribution system Muhammad Irfan Akhtar 152. An overview of energy position in Pakistan Qamar Raza Naqvi 153. Energy conservation in Air-conditioning Mushtaq Ahmad Bhatti 154. Renewable energy options to overcome energy crisis in Pakistan Dr. Arshad Muhammad 155. Necessity of Nuclear energy for Pakistan Khan 156. Research Programme for Solar energy Dr. Syed Wajahat Ali Volume XX 157. Evaluation of mortar / concrete mix-ratio analysis method Dr.Irshad Ahmad 158. Quality control on construction material Muhammad Afzal Bhatti 159. Material prospection for Dams Dr.Izhar-ul-Haq 160. Quality control programme in the construction of a nuclear facility Anwar Saleem 161. Effectiveness of Pakistan Steel’s stag in Shaffqat Rabbani 162. Controlling Alkali-Silica 163. Improved cost in the services of Engineers Ghulam Hussain Volume XXI 164. Hydro Power potential of Pakistan Dr.Izhar-ul-Haq & K.F Shaikh 165. Hydro Electric Power Projects construction planning and implementation in inaccessible Northern areas of Pakistan Brig. Ijaz-ud-Din Khan 166. Socio-economic imperatives of Hydro- electric development in Pakistan Mian Fazal Ahmad 167. Micro power plant programme in Pakistan Anwar,A. Junejo & Zafer Iqbal 168. Planning strategy for development of Hydro-power in Pakistan Muhammad Zakaria 169. Small scale power generation in private sector with special reference to small hydel power generation L.A. Jaffery 170. Construction planning of small hydro-power projects financing-contract packaging project schedule S.M. Kirmani 171. Indigenous development to exploit hydel potential in Pakistan Dr.M.Y. Akhtar 172. Kundal Shai Hydel Scheme Khalid Yamin Volume XXII 173. Historical review of development in desigen, operation and maintenance of barrages in relation to surface Dr.Mushtaq Ahmad 174. Operation and maintenance of canals R.K. Anver & R.Haq 175. Operation and maintenance of completed SCARPS Hamid Ullah Khan, Syed Rehmat Ali and 27 Muqarrab Khan 176. Operation and maintenance of Dams Dr.Izhar-ul-Haq 177. SCARP planning, operation and maintenance Nasir Ahmad 178. Modern telecommunication on Pakistan Railways Khalid Qasim 179. New concept in modern signaling maintenance methods Wasif Roheel 180. Maintenance of drainage systems Syed Mansoob Ali Zaidi, Haroon Shami & Muhammad Mehdi Zaidi Volume XXIII FLOOD MANAGEMENT IN PAKISTAN JULY, 1994 181. Floods in Indus Basin, their control and Riaz-ul-Haq management Riaz-ul-Haq 182. Management of 1992 floods through reservoir Muhammad Afzal & Abdul Ghani 183. On the study of 1992 floods and its effects on Punjab Syed Ali Rizwan & Faiz Ahmad Chashti 184. Role of marginal bunds in flood fighting –A case study of cutting of marginal bunds during floods of 1992 at Trimmu and Punjab Headworks A.A. Shakir 185. Floods and Road in Indus Basin E.I. Johri 186. Floods frequency analysis at some typical discharge measuring site of Pakistan Rivers Syed Ali Rizwan 187. Flood forecasting and warming problems in Pakistan Abdul Majeed MANAGEMENT OF HILL TORRENTS IN PAKISTAN DECEMBER, 1995 188. Watershed management in Japan Yoichi Kishi 189. Management of Kaha Hill Torrent Syed Mansoob Ali Zaidi 190. Problems in disaster prevention in developing countries Masyuki Watanabe 191. Harnessing of Hill Torrents in Pakistan: A conceptional analysis Sabir Ali Bhatti & Muhammad Nasir Khan 192. Flood management of Hill Torrents in Pakistan Dr. A.S.Shakir & Asrar- ul-Haq 193. Status of Rod Kohi System : A case study Dr. M. Shafiq, M.Z. Ikram & Muhammad Ahmad 194. Role of small Dams in stream flow regulation Abdul Ghaffar 195. Potential for efficient utilization of hill- Torrents for crop production in Dera Ghazi Khan Munir Ahmad 196. Participatory approaches in integrated watershed management Moujhad Achouri 197. Upper Kaha Hill torrents Management Muhammad Azam, Bashir Ahmad 198. Flood Management of F.P. Bund Complex Government of Sindh 28 I&P Departments 199. Note on range management in D.G. Khan Forest Department D.G Khan 200. Rod kohi system in D.I Khan Division I&P D.I Khan, Govt. Of NWFP Volume XXIV IMPACT OF POWER POLICIES ON SOCIAL AND PRODUCTIVE SECTORS 1996 201. Power growth in Pakistan Capt. Khalid Sajjad 202. Evaluation of the 1994 private policy Javid Akhtar 203. A discourse of thermal generation policy, Private Sector vs. Public Sectors Iqbal Ashraf 204. Impact of privatization of power on agriculture Dr. Muhammad Yaqoob Bhatti 205. Impact of hydel policy on the power tariff in Pakistan Muhammad Khan 206. Impact of power policies on social and production sector Rehmatullah Javed Volume XXV ENVIRONMENTAL PROTECTION AND RESOURCES CONSERVATION MAY 1998 207. Environment and social soundless assessment of 700 MW Thermal power Plant Javed A. Aziz & Rafiq Shad 208. Nitrate, Fecal Coliform And pesticides in shallow groundwater of railway., Lahore, Pakistan Shahzad Afzal, M. Farooq, M. Hammad Atique Khan, Muhammad Ismail khan & Karamat Ali 209. Pakistan in the grip of deficient Contemporary Environment Technologies Ahmad Nawaz Cheema, SK 210. Ghazi Brotha Power Project- A case study environment protection and resource reservation Brig. (Retd) Khurshid Ghias Ahmad 211. Salinity extent and its management in Punjab M. Azhar Javaid, Ch. Karamat Ali, Dr. Muhammad Javaed 212. Environment conservation in Pakistan Dr. Izhar-ul-Haq, Muhammad Arshad & Dr. Abdul Sattar Shakir 213. Drainage and environment: Evaluation of post interventions and future strategies in Pakistan Asrar-ul-Haq, Dr. Bagh Ali Shahid & Dr. Abdul Sattar Shakir 214. Conservation of water resources of Pakistan Dr. Izhar-ul-Haq & S. Tanveer Abbas 215. Environment and cancer Col. Mumtaz Hussain 216. Eco-Impacts of Toxic Pesticides Col. Mumtaz Hussain 29 Volume XXVI NEED FOR HYDRO-POWER DEVELOPMENT TO SOLVE ENERGY CRISIS APRIL, 1999 217. Hydro-electric power potential identified under Pakistan-German Technical Cooperation with GTZ additional to potential on main stem of River Indus Herbert Kuntz 218. Role of low head potential meet the energy crisis in Pakistan Mahmood Ahmad Malhi 219. Available data banks and information on Hydro-power Dr. J.J. Victoria 220. Facilitation of Hydro-power development by Independent Power Producers Riaz Nazir Tarar 221. Feasibility studies ready for involvement of private investment under 1998 Power Policy G.M Iiiass & Javed Rashid 222. Development of Hydro-power to meet energy crisis of the country Ghulam Abbass & Fayyaz Asghar 223. Manpower requirement in Hydro-power Engineering Dr. J.J. Victoria & Dr. Muhammad Latifp 224. Optimization of Hydro-Electric Projects Ch. Altaf-ur-rehman Volume XXVII TRANSPORTATION ENGINEERING AND RELATED ISSUES IN PAKISTAN 225. Transport Policy and Allied Issues Engr. Mian Ghias-ud- Din 226. Rutting of Asphalt Concrete Pavements Engr. Haroon I. Shami, Jim Hall 227. Policy Option for Pakistan Railway Engr. Syed Akhtar Ali Shah 228. Indus Waterway as an International Outlet to Sea for Land Locked Central Asia Engr. Mohi-ud-Din Khan 229. An Introduction to Super Pave Asphalt Concrete Mix Design System Engr. Haroon I. Shami Jim Hall 230. The Scenario of Public Transportation in Khuzdar Engr. Aftab Ahmad Farooqi, Engr. Rab Nwaz, Engr. Muhammad Raza Mehdi 231. Construction Costs of National Highways Engr. Sadaqat Hasan Mir 232. Lahore-Islamabad Motorway (M-2) Experience – Lessons and Improvements for Future Projects Engr. Syed Waqar Haider Volume XXVIII WATER CRISIS IN PAKISTAN AND SOLUTIONS 233. Groundwater Resource of Pakistan and its Management Engr. Muhammad Farooq Khan Niazi and Engr Abdul Hafeez 234. Role of Barani Areas in Mitigation of water Crisis in Pakistan Muhammad Iqbal Lone and Fayyaz Ul Hassan- University of Arid Agricultural, Rawalpindi 235. Indus River System Authority Water Engr. Mian Hafiz Ullah, 30 Resources Management Drought Mitigation Strategy Former Chairman IRSA 236. Reuse of Waste Water for Sustainable Management of Water Resources Dr. MAQ Jahangir Durrani, Engineering University, Peshawar 237. Water Crisis in Pakistan and Solutions Engr. Fateh Ullah Khan, Former Chairman IRSA 238. Anatomy of High Power Tariff Engr. Saeeed Akhtar Niazi 239. Mitigating Water Shortage by Making Tarbela A Sustainable Reservoir Engr. Amjad Agha and Engr Akram Khan 240. Demographic Influences on Land and Water Resources and Food Sustainability Concerns : Vision 2025 M. Azhar Javed, M. Tariq Yamin, Ch. Karamat Ali, Engr. Rashid Minhas 241. A Transparent Plan for Meeting Water Shortage in Pakistan Engr. Mohiuddin Khan 242. Development of Surface Water Resources Dr. Izhar-ul-Haq and Mushtaq Chaudhry Volume XXIX URBAN DEVELOPMENT WITH FOCUS ON HOUSING 243. Urban Development with Focus on Housing Sheikh Abdur Rasheed 244. Housing issue in Urban Development of Pakistan Prof. Dr. Syed Shabih- ul-Hassan Zaidi 245. Urban Development in Pakistan – Beyond Housing Maqbool Ilahai 246. Urban Planning in Pakistan Manzoor Ahmad 247. Urban Development Planning of Mega Cities a must Integrated Master Plan for Lahore – 2021 Engr. Sabir P. Chohan 248. Urban Housing Development in Pakistan – A Case Study of Lahore Metropolitan Area Prof. Dr. Ihsan-ullah Bajwa, Ijaz Ahmad, Zarreen Khan 249. PHATA – Land Use Plan Kamil Khan Mumtaz 250. Low Income Housing Strategies in Pakistan with Focus on Urban Housing Muhammad Ali Tirmizi 251. Performance of Masonary Buildings During 8th December 2005 Hazara – Kashmir Earthquake in Pakistan S. H. Farooq, Prof. Dr. M. Ilyas 252. Urban Development with Focus on Housing Abdul Halim Paracha *
Filename:
P259.pdf
File Type:
pdf
File Size:
109 KB
Categories:
Volume 0030- 2008
Downloads:
2