231 Paper No. 284 YANGTZE FLOODPLAIN RESTORATION AND BASIN MANAGEMENT – PROGRESS AND LESSONS LEARNED POST THE 1998 FLOOD Dr. Lifeng Li 232 Dr. Lifeng Li International Workshop on Floods in Pakistan-2010 233 YANGTZE FLOODPLAIN RESTORATION AND BASIN MANAGEMENT – PROGRESS AND LESSONS LEARNED POST THE 1998 FLOOD Dr. Lifeng Li WWF International 234 Dr. Lifeng Li THE YANGTZE PROFILE • 6,300 km length, China’s longest and the world’s third longest river • 1.8 million km 2 of basin area • 35% of China’s freshwater, annual run off of 996 billion m 3 (996 000 GL) • rich biodiversity, home for 347 fish species (2/3 endemic) • producing 40% of China’s annual GDP • 420 million people, accounting for 1/3 of China’s population • flowing through 11 provinces/municipalities/autonomous regions • ‘Golden Waterway’ – navigation and shipping Chinese River Dolphin (Baiji) (Lipotes vexillifer) International Workshop on Floods in Pakistan-2010 235 Yangtze Finless Porpoise (Neophocaena phocaenoides asiaeorientalis) Issue 1: Vegetation Degradation • Forest: 1950-90, forest coverage decreased from 30% to 10% • Grassland: overgrazing, desertification Issue 2: Shrinking Wetlands Shrinking of lakes and wetland due to reclamation > 100 lakes disconnected due to embankment and sluice gate construction 1/3 of lakes disappeared and more than 12,000 sq km of wetlands have been converted into farmlands; loss of flood retention capacity of 8 billion cubic meters; 236 Dr. Lifeng Li Issue 3: Depletion of Fishery Resource International Workshop on Floods in Pakistan-2010 237 Issue 4: Disordered Hydropower Development By 2005, 48,000 reservoirs in the Yangtze basin, with total storage capacity of 220 billion m 3 (>1/5 of total discharge 996 billion m3); constructed and planned hydropower stations 2441. Issue 5: Degradation of Aquatic Environment Blue/green algae bloom Pollutants from industrial, domestic, and agricultural sources. 238 Dr. Lifeng Li Issue 6: Flood and Drought Threats Economic Loss of Floods 1/3 flood retention capacity lost, about 8 billion m3. 200 590 700 1600 0 500 1000 1500 2000 94Äê 95Äê 96Äê 98Äê (Billion CNY , 1USD=8CNY) International Workshop on Floods in Pakistan-2010 239 A Unique Ecoregion of Global Importance Hubei Anhui Jiangxi Hunan Dongting Lake Poyang Lake Biodiversity Crisis • Destroyed fish spawning, breeding, and migrating ways -> declined fishery • Destroyed birds habitats due to stable water level 240 Dr. Lifeng Li International Workshop on Floods in Pakistan-2010 241 GOVERNMENT RESPONSES AND POLICY CHANGES POST 1998 FLOOD 32-Character Policy: 1. Stopping logging and fostering forest (the Logging Ban) 2. Converting cultivated slope land to forest and grass (Grain for Green) 3. Breaching the polders for floods 4. Converting cultivated land to lakes (wetland restoration) 5. Resettling the people in the flooded polders and establishing new town for them 6. Reinforcing the key dykes 7. Dredging up the river course 8. Giving people work in place of relief subsidies WWF’s Interventions • Restore destroyed wetlands ecosystem – reduce non-climate pressures • Reconnect river and lakes – improve connectivity between habitats • Promote eco-agriculture, e.g. eco-fishery and eco-farming of livestock – focus on the human-use interactions with ecosystems • Manage ecosystem effectively – develop the Central & Lower Yangtze Wetlands Conservation Network 242 Dr. Lifeng Li • Facilitate research to find the solutions, and engage the stakeholders to reach agreements Outcomes: Summary • Wetland restoration: 2900 sq km 2 • Reconnected Lakes: about 40 lakes • Increased floodwater retention capacity: 13 billion m 3 (22 billion m 3 of water storage capacity of the Three Gorges Dam) • Yangtze Wetlands Conservation Network: 2 m ha, 40 nature reserves Sluice gates opened for 17 lakes, with total area of more than 1200 sq km International Workshop on Floods in Pakistan-2010 243 Zhangdu Lake June 05 Tian-e-zhou Oxbow June, 04 Hong Lake July, 05 Baidang Lake July 05 Hubei Anqing Lakes June 06 Lakes reconnected with the Yangtze Central & Lower Yangtze Wetland Conservation Network 22 Nature Reserves of 6 different types as the first group of network members, covering an area of 1.2 M hm2. 244 Dr. Lifeng Li Environmental Benefits: Zhangdu Lake • 285.6 million m 3 of water flowed into the lakes, nurturing 448km 2 wetland and improving water quality • 14 fish species entered into the lake, of which 9 were / has disappeared from the lake. 526.7 million of fish fries flowed into the lake. 1 bird species returned to the lake due to improved habitant Socio-economic Benefits : Zhangdu Lake • Fish production in 2005 increased 17.33% due to improved water quality and more fish fries flowed into it. • Recognized as an example of environment al flows by the central government. Impacts & Magnification • Recognized as an example of environmental flows by MWR. • Municipal governments developed regulations on river-lake reconnection and sluice gate management. • The river-lake reconnecting was adopted and included into the Action Guideline of China Hydrobiological Resources Cultivation and Protection Initiative issued by the China State Council on February 14, 2006. • A national project to restore the City of Hundred Lakes in Wuhan under implementation. River Basin Management • River basin authority should be the speaker fo r the river, especially for the ecosystem and environment • Harmony between people and water • Balanced conservation and development • Revision of the Yangtze Basin Management Plan • Yangtze Forum – a high level platform for decision makers Lessons Learnt • “Soft” nature infrastructure for flood management • Compromise/balance of socio-economic and environmental objectives • Stakeholders participation • Policy and government will • Monitoring, improving, magnifying • Conservation network across the river basin International Workshop on Floods in Pakistan-2010 245 “ A healthy river is clean and free-flowing; is home for fish, where people live in harmony with water.” “River basin organizations should speak for the rivers!” – Former Minister Prof. WANG Shucheng Giving more space to the river (Room for River) Transforming agricultural management of floodplains into nature management 246 Dr. Lifeng Li Dike set back, combined with floodplain restoration International Workshop on Floods in Pakistan-2010 247 248 Dr. Lifeng Li

Filename: 15-Yangtze-floodplain-Li-Lifeng-11pt.pdf
File Type: pdf
File Size: 2 MB
Categories: Volume 0032- 2010
Author: Dr. Lifeng Li