WIND FARMERS: HEED THE LESSONS OF THE MERCHANT GAS POWER BUSINESS The wind energy bus iness is beginning to look as frenetic as the merchant gas-fired power business in the late 1990s – with s ome critical differences. If the 10 issues listed here are addressed s oon, wind power may avoid a cr ash and burn similar to the one that beset the gas turbine business. I remember how precisely we performed t he “pour” when my buddies and I economized and bought beer by the pitcher in college. You had to get the fl ow just right to maximize the liquid without frothing over. This analogy seems perfect to describe the current state of the U.S. wind power market. Like most infrastructure busines ses, the electric utility industry has a pen chant for overestimating the need for new capacity. Three or four years are spent furiously install- ing supercritical coal-fired boilers, nuclear units, cogeneration and merchant plants, or, most recently, gas-fired gas turbines and combined-cycle facilities. This boom then turns into a drawn-out bust, during whic h many projects are cancelled and t he new ca- pacity that makes it on-line is integrated with the old in the existing infrastructure. Call it feast or fami ne, boom and bust, irra tional exub erance and post-Enronitis, or whatever you want. Admittedly, part of this phenomenon is not within the industry’s con- trol. Remember how the accident at Three Mile Island helped precipitate a wave of cancellations of nuclear units in the 1980s? Soon it became clear that we didn’t need all that capacity because most of it was not immediately replaced. Later, in the late l980s, t he industry overbuilt independent power plants. Then came the 1998—2001 irrational exuberance for gas-fir ed merchant power. Many projects were cancelled, and those that lim ped to completion didn’t— and still don’t—operate at very high capacity factors because th e price of natural gas skyrocketed. Not all of the de- bacle can be blamed on the fall of Enron, though, or the discrediting (at the time) o f electricity trading. To foster caution and reflection, here are 10 reasons why the wind energy market is beginning to look a little frothy, like the pre-millennium merchant gas-fired market. I also note key differences between the two situations. At the end are some perspectives and actions that industry players may wish to consider. In an era of high oil and natu ral gas prices, insecurit y about ter rorism, and rural eco- nomic blight, it is important that renewable energy succeed. Wind is the closest thing we have to “utility-scale” renewable energy, so it s penetration is both vital to the electricity industry and to the public if wind is to get what it appears to want. Similarity #1: One Dominant Supplier By the late l990s, one domestic supplier of large turbines, holding 60% to 75% market 1 share, had come to dominat e U.S. gas-fired plant contra cts. The other major U.S. supplier ran a distant second. T wo Europe an suppliers that had entered the market earlier fought for the crumbs. Consolidation occurred, and by the time of the bust, one of the European companies was essentially in receivership. Today, one domestic supplier (coincidentally , the same company that dominated the large gas turbine business) enjoys a 60% shar e of the U.S. wind turbine market, based on 2005 figures reported by a Danish consulting firm in a pr oprietary study. This supplier entered the market through a key acquisition in early 2002 and rose to domi- nance in only a few years. In the process, it knocked off the top dog, a European whose U.S. market share is now less than 20%, according to 2005 data. Similarity #2: A Long Order Queue Remember when dev elopers and utilities were wa iting inline for large gas turbines? At the time, customers were “encouraged” to accept long-term service agreements (LTSAs), which were richly rewarding to suppliers and enabled the monetization of long- term service, component replacements, and repair work over a five- or 10-year period. Today, wind farm developers and many others ar e saying that the market is starved tor turbines. Even more signific antly, the availability of turbines is controlled both by the dominant suppliers and the largest developers, which are now “long” on turbines. Faced with burgeoning dem and and limited supply, project devel opers have no c hoice but t o turn to new market entrants. In the meantim e, the market leaders can exert control over both the project pipeline and the turbine supply pipeline. The int ent of recent acquisi- tions, for example, has been to c apitalize on complementarity between companies with turbines and companies with projects. Similarity #3: Necessity Breeds Invention Demands on schedule, performanc e, and project financials driv e developers of power projects of any type to embrace advanced t echnology. In the case of gas turbines, the advanced F-class machines— with subst antially higher firing te mperatures, greater efficiencies, and lower emissions than c ompeting machines — becam e attractive because of the incremental fi nancial gains they promised, at least on paper (the proforma). Responding to their own pressur es, regulators often ratcheted down em issions levels, especially for NOx, and developers were happy to oblige, to get permitting off the critical path. Meanwhile, turbine vendors came up wit h machines that were said to meet the new limits. This was described as a vic ious circle dance among developers, financiers , regulators, and equipment s uppliers. Ultimately, plants began to be permitted with NO x limits as low as 9 ppm— with no downstream cleanup! By the mid-1990s, advanced turbines were being rushed into commerci al operatio n without adequate test ing and demonstration. In the 1996—1997 time frame, many of 2 these machines were back on the “repair rack” to fix design or structural deficiencies. Wind turbine technology may be in the midst of a similar phase. Suppliers relatively new to the U.S. market, or with unique designs , are beginning to sell substantial numbers of machines. One supplier, with an innovative design consisting of multiple gears and permanent magnet generators (Fi gure 1), r ecently received orders for hundreds of this turbine. The confidence being expressed by the market in this design is rather remarkable, given that it is based on a single machine being demonstrated in Wyoming for less than two years. In general, turbine blades are getting larger, with more complex, composite construction materials; machines have higher output; and to wers are getting taller. New compos ite materials are reducing weight but not st rength, designs are accommodating “issues ” with the gearbox and drive train, and new suppliers are gaining a foothold in the market. The fact that the new machines are both la rger and more efficient at capturing wind energy means fewer of them are needed for a given plant rating. That makes the financials look a lot better in many, though not all, cases. A business aspect peculiar to wind, however, is that patent issues involving variable- speed design hav e kept several prominent European suppliers f rom entering the U.S. market. Case in point: The second leading s upplier of wind turbines worldwide in 2 005, a German firm, has no significant sales in the U.S. Recently, the affected suppliers have either settled with the patent holder or found ways around the issue. As a result, although the U.S. wi nd power market is still short of turbines, at least five suppliers are, or soon could be bidding on near-term projects. The lesson to be learned from the late 1990s large gas tu rbine situation is this: Com petition is healthy until it leads to price wars, which destroy the delicate balance between first costs and the costs 3 of being on the repair rack, product recalls, des ign deficiencies, and other surprises. In the U.S. wind power market, the situation could quickly shift from shortage to glut. Similarity #4: Project Risk From a financial perspective, both wind and gas-fired projects embody a primary source of risk that is difficult to mitigate. Gas-fire d projects suffer from volatile fuel prices . Certainly, the stakeholders in gas-fired projects of the 1990s thought they were hedging fuel risk. But it quickly became clear, notably over the last three years, that they weren ’t hedging enough. Wind energy projects, similarly, suffer from vo latile “fuel” supply— day to day, month to month, and season t o season. In essence, a wind project trades premium fuel pric e volatility and financial impact for variabi lity in output and its financial impact. The potential discrepancy between the predicted and actual ener gy output of a wind farm is significant. Some reports indicate that erro rs of 20% to 50% in day-ahead production volumes are common. Similarity #5: State-by-State Patterns There has been a shif t of activity in the U.S. wind power market fr om the West to the Northeast and Midwest. In particular, New York, Pennsylvania, and Illinois are instituting aggressive wind and renewable energy development programs. The largest single wind project currently being built in the U.S. is in Illinois. California, of course, continues to be a hotbed of activity, along with T exas. Both are vying for the top of the mountain, so to speak, in wind energy development. What do all these states have in common? They were in the vanguard of retail electricity deregulation, the result of which was large additions of gas-fired merchant capacity. They also generally have higher electricity rates than other states, especially in th e population centers. The convergence of high energy c osts, large fractions of gas-fired capacity in the mix, the end of moratoriums on electricity rate increases as part of restructuring, and capital needs for infrastructure expansion programs has led to sizable rate increases in these states (and, for that matter, around the country). It remains to be seen how long esc alating rates can coexist with the development of relatively high-cost capacity such as wind power. Similarity #6: O&M Issues The average wind energy project has a capacity factor of 35% or less. This magnifie s the negative effect of any out age, planned or unplanned, on pr oject financials. At the annual American Wind Energy Association conference in Pittsburgh in May of this year, more than one Wall Street analy st reported that the industry’ s top issue, after supply chain concerns, is the quality and reliability of turbines. 4 By now you shouldn’t be surprised that this brings to my mind the worldwide spate of F- class gas turbine recalls circa 1995 to 1997, following the catastrophic failure of several machines. Thankfully, history hasn’t repeated itself for onshore wind t urbines. But offshore units in Eur ope have undergone enough across-the-board repair and modif i- cation to constitute a recall. One organization staying on top of the O&M issues is Sandia National Labo ratories. In March 2006, Sandia issued a report titled, “Wind Turbine Reliability: Understanding and Minimizing Wind Turbine Operation and Maintenance Costs.” The labs followed up with a workshop on the subject in October. One key passage in the report reads as follows: In the late 1990s, manufacturers began to introduce wind turbines in much larger sizes. While the larger kW size machines are bei ng produc ed by m any m anufacturers, the new “MW” size machines are being installed in significant numbers. Most major vendors offer turbines in the 1 .5 MW size range an d are actively deve loping and installing first versions of 2 MW and 3 MW machines . Mo st of these larger machines e mploy technologies that are sufficient ly new that the validity of extrapolating data from the “standard” machines of t he 1990s is questionable. An example of the dram atic difference in technology is the trend toward direct-drive turbines that eliminate the gearbox entirely and employ a low-speed large diameter synchronous generator. As gas turbines were scaled up, many expected their O&M costs to decline because the new units were extrapolations of current designs. Relative O&M costs do fall after a technology matures via production experience, but the early years are a different story. In addition, the larger size of the machines means that mo re capacity fails t o generate (more) revenue whenever one goes down. The Sandia report goes on to state that the track record of upsized machines does not justify downward extrapolation of O&M costs. It referenc es data from the German insurance industry, which estim ates the in cremental O&M cost of a megawatt-class machine at 1.0 cents/kWh, or $25,000 per year per machine. Here’s another passage from the Sandia report that harkens back to the heyday of gas turbine development: “There exist large fleets of similar model turbines but in man y cases detailed changes and revisions hav e been implemented, often in response to serial defects.” Those who remember the pa rade of engineering so lutions to problems with large gas turbines surely will get a sense of déjà vu from this statement. Similarity #7: Transitioning Owner/Operators Over the past five years, every survivi ng merchant gas-fired power producer had t o evolve from being primarily a pr oject development company to being an owner/operator of assets. A project’s initial operating years typically were covered by LTSAs that made the gas turbine vendor largely responsible for O&M performance—for a price, of course. 5 Later, facilities learne d to at least break even by reducing an nual production costs, including using non-OEM repairs and replacement components. Over the next few years, wind farm owner /operators will hav e to adapt to wind capacity’s increasing presence on most transmission grids. On more sys tems, that penetration will grow from insi gnificant to noticeable. Some describe this as a maturing of the industry: Wind turbine-generators will increas ingly be required to behave lik e other kinds of power plants. As penetration grows, so too does wind’s impact on the grid with respect to voltage regulation, ancillary services, and other grid requirements. Similarity #8: Nervous Insurers In the mid-1990s, ins urance companies be came voc al and engaged a bout advanced gas turbine technology. Industry meetings focus ed specifically on th is issue were orga- nized as some insurers threatened to exit the sector or raise premiums to a degree that created the same result. In some respects, the LTSA was a res ponse both to the inadequate performance of early machines and persistent claims for damages and busines s interruption. Now it seems apparent, based on articles in wind ener gy trade public ations, that insurance firms are becoming worried about advanced wind turbine technology. Similarity #9 Financial Engineering You c ould spend all night over multiple pit chers of beer ar guing whether the investor class drov e the gas-power merchant business to its doom, whether overenthusiastic developers ignored the warning signs, or whether inexperienced electric utilities got i n over their heads trying to become growth sto cks rather than value plays. One thing is certain, however: Wall Street played a big role in the scene. With the wind busines s, it already seems like déjà vu all over agai n. A top Wall Street firm has become a major and direct play er in wind energy by acquiring two promin ent developers. An international investment group has taken a huge stake in U.S. wind an d is evolving into a top-five player on the development side. Anot her major Wall Street player recently annou nced a commitment of $250 million to develop wind . European investors have been prominent on the project finance side of the bus iness. And, of course, the largest equipment supplier als o has a hand in the game as a financial services company. What is the relevanc e of this? For one thi ng, financial players usually are not in the business of owning and operating power generation facilities ov er the life of the plant. This makes them different from utilities, which generally must take a long-term, life cycle view of their assets. 6 Similarity #10: The Cure Du Jour This last similarity is more amorphous but still pertinent. In the 1990s, the industry seemed to converge on the belief that gas-fired indepe ndent and merchant generation was the one option that could sa tisfy all the stakeholders in virtually every region of the country: • Local communities wanted the t ax base and the economic development but also an unobtrusive power station. The low physic al profile of a combined-cycle plant met that need. • Environmentalists wanted the lowest emissions—no sulfur or particulat es and minimal NOR. They got their wish. • Investors wanted short project schedules, low capital costs, and high fuel conversion efficiency. Advanced gas turbines bas ed on the more-efficient Brayton cycle (compared with the Rankine cy cle), and t aking advantage of aero-derivative tech- nology, filled the bill. • Owner/operators wanted simp lified plant designs, modula rity, and strong vendor support because they intended to run lean and mean. Suppliers delivered. • Natural gas companies, str uggling at the time to monetiz e their gas bubble asset s over long periods of time, wanted to sell their product in high volumes and play the so-called spark spread (the ratio of gas to electricity prices at any given time). They, too, were satisfied. Not surpris ingly, gas-fired capacity was em braced as the cure for all that ailed the electricity business, so the bus iness c limbed on the back of gas turbine technology. What was recognized, but not necessarily managed well, was that the ride was made bumpy by necessary sacrifices in key areas of turbine performanc e. For example, the materials needed to withstand high firing and tu rbine inlet temperatures pushed the envelope of metallurgy. This subsequently led to reliability and durability issues. What’s more, raising firing temperatures to, increas e efficiency and specif ic power output wa s in direct opposition to another goal: lower NO x emissions. Dry low-NOx combustors and single-digit NOx limits essentially limited a s ite’s fuel options not only to nat ural gas but also to gas with tight specifications. Fuel fl exibility became a casualty of th e move to single-digit NOx. Today, it seems clear that wind turbine blades are straining the possibilities of materials technology, especially for such heavy comp onents hanging sev eral hundred f eet in the air. New power elect ronics components ar e being added to address grid interface issues. Wholesale new des igns, such as dire ct-drive machines, are being introduced to avoid persistent difficulties with “old technology” like gearboxes (Figure 2). 7 It’s easy to see how wind generation could assume the mantle of the industry’s cure du jour. Wind could ev en be considered a pan acea: It has no emissions (including CO 2), it helps farmers and rural communities, it burns no costly fossil fuel of domesti c or foreign provenance, it qualifies for va luable renewable energy credits , it can be br ought on-line quickly, and it appeals to the investment community. Although wind energy may not achieve the same capacity addition levels as gas-fired power in bygone years, it certainly satisfies many important constituencies today, and undoubtedly will in the near future as well. Distinctions Remain Of course, the analogy betwe en the wind energy and gas-fired power bus inesses can only be taken so far. Distinctions abound. Following are three. First, there were really only four suppliers of large, F-class gas turbines to the U.S. market in the 1990s. A merger reduced that num ber to three by the latter part of the de- cade, but then a Japanese su pplier entered with a new des ign. Today, there are between a half dozen and a dozen potential suppliers of wind turbines in the 2- to 3-MW size range. How many of them can truly compete in the U.S. is another issue. 8 Second, the U.S. wind industry is subsidized by the federal production tax credit and renewable portfolio standards that have been implemented to varying degrees in more than 20 states. Third, a gas-fired plant really can operate like a traditional central power station with re- spect both to the grid and to a utility’s resource portfolio. No o ne is talking about wind facilities with capacity factors higher t han 40%. Without energy storage, wind is an intermittent energy and electricity source. B uilding transmission infrastructure is difficult enough under any circumstances today, but in remo te areas is even harder to justify for a resource that, at best, will be productive only one-third of the time. Heeding the Lessons What are the takeaways from this analogy? How do we prevent a repeat of the gas-fired merchant power debacle of 2002? Here are some issues to reflect on. Get organized. Owner/operators of gas tur bine and combined-cycle plants participate in user groups specific to their type of machines. Some are organized and administered by turbine vendors, others by user boards or technical associations. Perhaps wind farm owner/operators and developers should organize their own users’ group now, before O&M issues with some of the new machines get out of hand. Finding out more about the work being done at Sandia would be a good first step in that direction. Collect and use dat a. Many gas-turbine user sites share O&M and performance data that are filtered and made “generic” (for general trends) by an indepen dent third party. That is, the data are collected, analyze d, and reported back to the facilities as “flee t” data. Building this capability into projects from the get-go might be a way to ensure that technology issues are analyzed and solved through data-driven proces ses. EPRI’s Wind Turbine Verification Program and the Utility Wind Int egration Group (UWIG) could provide a framework for such activities on a broad industry scale. In the meeting notes associated with the works hop referenced earlier and ava ilable on the Web, Sandia notes that the American Wind Energy As sociation and UWIG may be forming user groups. Cooperate. Ten suppliers beating eac h other up isn’t healthy fo r anyone. Developers and owner/operators should c ooperate through industry-based groups to qualify and fully demonstrate new turbine designs. By the vendors’ admission, gas-turbine tec h- nology development often took place with initial “commercia l” units, not through tradi- tional technology demonstrations. Be w ary of ne w technology creeping into machines. For example, the industry is currently focused on the prem ature failure or unreliabili ty of mechanical components such as gearboxes and bearings. However, the new power electronics components that are being added to manage the grid interface may be the new frontier with respect to O&M and reliability (Figure- 3). 9 According to an article in the Spring 2006 EPRI Journal, power electronic controllers suitable for large, more complex generator designs provide power output smoothing and support variable-speed operat ion. Although falling co sts will make these new components viable, there’s precious little about their long-term performance to be found in the literature. Keep engi neering ahead of financial engineering. The reality of today’s power generation business is that it is driven more by private capital—either through utility company equities and bonds and priv ate equi ty investment pools— than by the regulated rate of return construct. Engineers need to maintain oversight of the financ ial proforma—vigilantly, not as a token gesture. There can be s ignificant difference s between t heoretical and actual machine performance and bet ween forecasted and actual wind energy profiles. Making sure that adequate reserves are available for unexpected O&M events is a must. Consider adding en ergy storage to your wind farm. A variet y of storage schemes are available to manage wind energy’s inte rface with the grid. Having ener gy storage makes production more predictable and thus more attractive to gr id operators, bilateral contracts, and others. With storage, you could even imagine selling a fuel- and CO2-free source of electricity into peak electricity markets as a structured product. 10 As stated at the top of this article, it would be a shame if wind power ends up getting a OURTESY – POWER (By Jason Makimaansi, Pearl Street, Inc.) black ey e from the same irrational ex uberance that took dow n the gas-fired power business. Staying alert to the dangers of such exuberance is the best way to avoid its nasty consequences. C 11

Filename: WIND-FARMERS.pdf
File Type: pdf
File Size: 160 KB
Categories: Volume 0005
Downloads: 1