OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain1 Introduction to the Author Engr. Chaudhry Foad Hussain has earned his Master’s in Water Resources & Env ironmental Engineering f rom Saint Ant hony Falls Laboratory at U niversity of Minnesota, Twin-cities, USA. He worked with HDR Incor poration which is among the leading Civil Engineering consulting c ompanies in United States. He was involved in multi-disciplinary Civil Engineering projects with United States Army Corp s of Engineers (USACE) & United Sta tes Environmental Protecti on Agency (USEPA) during his 3 year tenure at HDR. He has also e arned his Profession al En gineer certification for Sediment & Erosion Cont rol (CPESC) in 2005-2006. He became a member of Society of American Military Engineers (SAME) in 2006. He has joined the Diamer Basha Consulta nts team as Sediment and Hydraulic Design Expert in 2007. Recently, he had the opportunity of visiting Longtan Hydropower Project as study tour visit component of 5th International Symposium on RCC Dams held in China on November 5 -7, 2007 at Guiyang Town in Chin a. During his visit, he was profoundly impr essed by the Innovative Design and Construction Methodologies used in Longtan Hy dropower Project, China and evinced keen interest in a ll of its aspects. The current ar ticle is his humble effort to hoard s ome basic design and construction methodologies employed at the Longtan Hydropower Project. 5th International Sy mposium on RCC Dams – General Introduction During past three dec ades, great progre ss and innovation hav e been made on the design, construction, materials and instrumentation of roller compacted concrete dams. Fifth international sym posium on r oller compacted concrete dams was held in Guiyang China from No vember 2nd to 8th, 2007 to promote the construction and developm ent of RCC dams. The engine ers and experts from more than 20 countries including, America, E ngland, Germany, France, Spain, Switzerland, Australia, Canada, South Africa, Mexic o, Morocco, Malaysia, 1 Sediment & Hydraulic Des ign E xpert Diamer Bas ha Dam, Associ ate Partner, National D evelopment Consultants, 62 – M, Gulberg 3rd, Lahore, Pakistan. Fax: 92-42-5862033, e-mail: foadhussain@ndcpak.com 1 India, Pakistan, Iran, Ir aq, Vietnam, Burma and China, participated in the conference. The 450 participants (170 foreigners), produced 127 papers and exchanged construction experience and study achiev ements which will help to promote innovative t echnology in the design and construction of the roller compacted concrete dams across the world. International Milestone RCC Projects There are number of RCC d ams construct ed in last th ree decad es around the globe. Eig ht RCC p rojects are recogni zed as Internationa l Milestone RCC Projects at the symposium based on the engineering design accomplishment and innovative instrumentation. There names are as follow: ¾ Longtan Dam – China ( 216.5 m , 6300 MW ) ¾ Miel I Dam – Colombia ( 188m, 375 MW ) ¾ Miyagese Dam – Japan ( 156m ) ¾ Olivenhein Dam – USA ( 97.1m ) ¾ Ralco Dam – Chile ( 155m , 690 MW ) ¾ Rible Dam, — Spain ( 101m ) ¾ Salto Caxias Dam – Brazil ( 67m, 1240 MW ) ¾ Wolwedans Dam – South Africa ( 70m ) Introduction of Longtan Hydropower Project The Longt an RCC Dam is erected on Hongs hui (Re d) River, 15 km from the Tian-e county of Guangxi Autonomous Region. It is one of the s trategic projects in the China’s western development and Power Transmi ssion from West to the East. The Longtan Hydropower Project is also a pivot point in the cascade development of the Hongshui River as show n in Figure 1. It is primarily a power generation project along with the floo d prevention, navigation and other comprehensive benefits. 2 Figure 1: The Longitudinal Profile of Hongshui River Cascade Development Description of Longtan Hydropower Project The hydraulic complex of Longtan Hydropower Project is composed of the water retaining structure, the flood release st ructure, the headrac e, power gener ation structure and nav igation structure. The Spillway is s ituated in the riverbed dam section, consisting of 7 surface bays and 2 bottom outlets. The underground headrace tunnels and power house is located on the left bank and accommodates 9 hydro-generator units. T he nav igation structure is located on the right bank and adopts world’s tallest double-step vertical ship elevator system as shown in Figure 2. The diver sion arrangement during construction cons isted of one diversion tunnel one each bank. The Longtan Hydropower project was started in July 2001. The river closure was done s uccessfully in late 2003 and impou ndment was finished by Septem ber 2006. The power generation of the first unit was achieved in May 2007 about 1 year in advance. The project comple tion date is December 2009 and total construction period as per schedule is 9 years. The under ground power house comprises of 9 head race tunnels hav ing a diameter of 10m. The di mensions of the powerhous e are 388.5m×30.3m×74.4m (L×W×H). The head race tunnels leads to the machine hall chamber & main 3 transformer chamber. The three tail race surge shafts are located downstream of transformer chamber. A single tail race tun nel originates from each surge s haft having a diameter of 21m. The excava tion of the main powerhouse had been completed in 32 m onths, with a maximum monthly excavation as high as 116×103m3, a yearly maximum excavation of 1,247 ×103m3. Figure 2: General Layout Plan of Longtan Hydropower Project Configuration Optimization & Stability and Stress Analysis The min. normal stress on the dam foundation face of Longtan Dam is 0.02MPa and -1.07MPa in seis mic case. The max imum normal stresses on the dam foundation face and in seismic case are 4.9MPa and 5.83MPa, respectively. The anti-sliding stability safety factor along the dam foundation face is larger than 3.0 for the basic cas e, larger than 2.83 fo r special case and larger than 2.43 for seismic case. Table 1 indic ate the downstream dam slope in the water retaining dam section and spillway dam s ection to be 1:0.73 and 1:0.68, respectively . The upstream dam slope for water retaining dam section and spillwa y dam section is 1:0.25. 4 Table 1: Configuration of Longtan RCC Dam Typical dam section Downstream dam slope Upstream dam slope Dam bottom width/Dam height Water retai ning dam section 10.73 10.25 0.8 Spillway dam section 10.68 10.25 0.78 Mix Design On the basis of a lot of laborat ory and field test and research, finally the mix proportions for the three RCC zones of Longtan dam were determined. In order to meet the requirem ent of all-y ear-around construction of Longtan dam under high temperature, high effective retarding water reducer and aeration agent suiting Longtan RCC were selected. The maximum length of a single drilled RCC core is 15.03m as shown in F igure 3. The core has smooth surface, compact structure and evenly-distributed aggregates. Figure 3: The RCC Cores of Longtan Dam 5 Rapid RCC Construction Technology of the roller compacted hree high speed belt conveyer concrete supply lines and two tower belt cr anes imestone artificial aggregates are used in preparation L concrete at Longtan Hydropower Project. T he topographical conditions are made full us e for application of 4 km long (1.2 m wide, 4 m/sec belt velocity, design carrying capacity of 3000 t/h) tunneled conv eyer to realize efficient and low cost aggregate transportation. Mixing plant is equipped with three sets of 2×6m 3 force batching plants and one set of 4×3 m 3 gravity type batching plant with total capability of 1080m3/h. T have been used for horizontal and vertical concrete transportati on and pouring system. Th e total concrete volume for Longtan dam is up to 6.6 million m 3, of which RCC accounts for 4.48 million m3 and conventional concrete is 2.12 million m3. Total product aggregate required is up to 14.12 million tons. The aggregate is made of limestone and the capability of sand and stone proces sing system is 2500t/h. Figure 4: The High Speed Co nveyer Belt & Tower Be lt Cran es System at the high temperature season, i.e. June, July & August of 2005, 480,000m 3 of 15,816 m is set using rapid RCC construction technology. Longtan RCC Dam In RCC was placed, an d in t he s ame year 3,160,000 m3 concrete was placed, including 2,500,000 m3 RCC, accounting for about 48% of the total quantity. The monthly highest concrete pouring target of 342,700 m3and highest daily concrete 3 6 The rapid RCC con struction technology f eatures the Horizo ntally-proceeding slope plac ement method adopt ed at t he Longtan Hydropower Project. The placement proceeds from the downstream side to the ups tream side and ystematic studies and comparison had been for Lon gtan RCC dam among five e inner side with PVC film 9 Asphalt mix seepage control In t ge control combining reinforced con arch was conducted on permeability of gradation II RCC and GEVR at Jiangya d am laborat ory, compaction for the gentle sloped section is done a long the water flow d irection while the compaction for ending section is done along the direction vertical to the water flow. Seepage Control Technology S dam seepage control schemes: 9 Conventional concrete seepage control (3~5m thick) 9 Precast board pasted in th 9 Surface reinforced GEVR (1m thick) and 9 Reinforced concrete facing for seepage control. he early design stage, the dam uses a seepa crete facing and gradation II RCC. Extensive rese im including 102 spec imens for laborator y seepage test of RCC c ores. It is determined, based on the research, that the upstream seepage control of all RCC sections of Longtan Da m are built with Grout Enriche d Vibrated RCC (GEVR) and gradation II RCC. Figure 5: Pouring and Vibrating Process of GEVR The seepage control scheme developed at for Longtan RCC Dam combines GEVR and gradation II RCC. The GEVR Th ickness varies between 0.5 m – 2m I RCC varies from 8m – 15m. from top to bottom and the thickness of Gradation I 7 An Anti-crack reinforcement mesh is also set on the upstream section of Longtan dam and three (3) layers of Copper W ater stops are also installed on the upstream dam section and two (2) layers on the downstream dam section. The 2 – 6 m thic k conventional c oncrete was poured for Foundation Cushion and the spillway structure (overflow surfaces, pier heads and guide walls ) at the overflow dam sections were built with conventional concrete. RCC Thermal Analysis & Temperature Control The thermal stress analysis of Longtan RCC gravity dam was carried out by zoned variable step ngth resolution method with simulation compound element, dam block joint g and spreading 9 water spraying in the placing area m The ject was carried out us ing eva r in Figure 4.1. The aggregates were re-cooled by utilizing a double stage (primary and secondary) wind cooling ignificant. In order to overcome this problem, the Ice Plant and ooling tower of concrete batching system were installed to mix the ice with means of a complete set of calculation methods suc h as le element, thermal field and stre ss field, as well as cons ideration of post cooling, which greatly improves the efficiency of the calculation and analysis. The thermal control criteria had been put forward as follows: 9 controlling temperature of RCC at the outlet of the batching plant 9 reducing temperature rising during handlin 9 thermal insulation at the lift surfaces 9 rational arrangement of construction schedule 9 provision of cooling pipes in the da temperature control at Longtan Hydropower Pro po ative cooling of stockpiles as show n p mechanism. The rise in temperature of concrete during the conveyance and placing was found to be s c concrete. In general, filling 10 kg ice for 1 m 3 can lower temp upto 1.2 degree C. Since the ice mixing with concr ete did not bring the temperat ure down to the desirable placing temperat ure specific ations, pos t cooling phenomenon was ultimately adopted which reduc es the conc rete temperature significantly. The roller compacted section of the dam were covered with the sheets in the summer season to reduce the amount of heat absorbed the concrete. The curing of RCC at later sta ges has been found to effect ive in controlling the cracks at Longtan RCC dam. 8 Figure 6: Evaporative Cooling of Stockpiles Figure 7: The Ice Plant and Cooling Tower at Longtan RCC Dam 9 Recommendations & Conclusions • The RCC Dams are growing at high rate both in terms of the numbers being cons tructed and also in terms of height of the dam. A significan t number of RCC Dams in Pakist an ar e eith er in desig n phase or under- construction, particularly Diamer Basha Dam. The knowledge gained from the innovative instrumentation at Longtan Dam such as for thermal stress & thermal control, seepage control technology and rapid RCC technology can be used as a com parative technical dat a base for the smooth design and rapid construction of Diamer Basha RCC Dam. • The GEVR along-with the RCC c an be used as seepage control m easure for the upstream facing. However replacement of GEVR with Geo- membranes and reinforcement mesh should also be considered. • The Ice plant and wind cooling tower should be installed at the dam site for controlling the RCC temperature. Moreover, the use of pos t-cooling technology is also recommended. • Since flyas h is unav ailable locally, the Pozzolan mix can be developed utilizing the locally available materials. • The in-situ stress te sting must be carried out in order to avoid any structural failures in the Power house caverns. 10

Filename: Longton-PEC.pdf
File Type: pdf
File Size: 467 KB
Categories: Volume 0005
Downloads: 3